Academic year: Program: DIPLOMA IN CIVIL ENGINEERING
Course: CAACourse Code: 22601
Semester:Sixth Name of Faculty:-L.P. Sakharwade Batch
Sr. No Name of the Experiment /
Assignment /Sheet /Job /Project Activity *Use the relevant format for initiating the given works. 1 *Prepare contract document of the 2 given projects.
*Examine any five tender notices
published in newspapers to write 3 your comments with reference to various constituents of tender notice. 4 *Draft the tender notice for the given types of construction work.
5 *Draft the tender notice for the
given types of construction work to be executed by adopting the process of E-tendering. 6 *Interpret the given set of tender document to comment on the components reflected in it. 7 *Interpret the condition on data furnished for E-tendering of the given project. 8 Prepare a power point presentation on the topic “E-tendering and its evolution. *Prepare tender document for the given civil engineering structure in a 9 group of five student on the basis of detailed estimate provided/collected by teacher/student( part 1) Prepare tender document for the given civil engineering structure in a 10 group of five student on the basis of detailed estimate provided/collected by teacher/student( part 2)
Prepare tender document for the
given civil engineering structure in a 11 group of five student on the basis of detailed estimate provided/collected by teacher/student( part 3) Interpret the given case study on, ‘contract litigation resolution 12 through arbitration ‘and submit your comments. *Record the measurements in the prescribed format of | 13 measurement book for the given items of works with abstract, completion certificate for payment. *Draft Detailed specification for following items 14 a) P .C.C. bed concrete for foundation b) U. C. R. masonry in foundation and plinth c) Burnt brick masonry in CM in superstructure. d) RCC work M20 grade. e ) Internal plaster in CM.
Draft Detailed specification for one
15 item from each of the following system : a) Irrigation Engineering. b) Transportation engineering. c) P. H. Engineering. *Determine the valuation of a given structure and submits the valuation 16 report in prescribed formats. *Determine the monthly rent of the given building / quarter as per PWD method / norms. 17