Academic year: Program: DIPLOMA IN CIVIL ENGINEERING

Course: CAACourse Code: 22601


Semester:Sixth Name of Faculty:-L.P. Sakharwade Batch

Sr. No Name of the Experiment /


Assignment /Sheet /Job /Project
Activity
*Use the relevant format for
initiating the given works.
1
*Prepare contract document of the
2 given projects.

*Examine any five tender notices


published in newspapers to write
3 your comments with reference to
various constituents of tender
notice.
4 *Draft the tender notice for the
given types of construction work.

5 *Draft the tender notice for the


given types of construction work to
be executed by adopting the
process of E-tendering.
6 *Interpret the given set of tender
document to comment on the
components reflected in it.
7 *Interpret the condition on data
furnished for E-tendering of the
given project.
8 Prepare a power point presentation
on the topic “E-tendering and its
evolution.
*Prepare tender document for the
given civil engineering structure in a
9 group of five student on the basis
of detailed estimate
provided/collected by
teacher/student( part 1)
Prepare tender document for the
given civil engineering structure in a
10 group of five student on the basis
of detailed estimate
provided/collected by
teacher/student( part 2)

Prepare tender document for the


given civil engineering structure in a
11 group of five student on the basis
of detailed estimate
provided/collected by
teacher/student( part 3)
Interpret the given case study on,
‘contract litigation resolution
12 through arbitration ‘and submit
your comments.
*Record the measurements in the
prescribed format of |
13 measurement book for the given
items of works with abstract,
completion certificate for payment.
*Draft Detailed specification for
following items
14 a) P .C.C. bed concrete for
foundation
b) U. C. R. masonry in foundation
and plinth
c) Burnt brick masonry in CM in
superstructure.
d) RCC work M20 grade.
e ) Internal plaster in CM.

Draft Detailed specification for one


15 item from each of the following
system :
a) Irrigation Engineering.
b) Transportation engineering.
c) P. H. Engineering.
*Determine the valuation of a given
structure and submits the valuation
16 report in prescribed formats.
*Determine the monthly rent of the
given building / quarter as per PWD
method / norms.
17