You are on page 1of 3

INSPECTION & TESTING REQUIREMENTS REVISION: 06/14/2016 CODE NUMBER: PAGE:

SAUDI ARAMCO FORM-175 REPLACES: 06/15/2011 IR121400 1 of 3


SCOPE: STRUCTURAL PLATES, ROLLED SHAPES, TUBULARS: Carbon Steel or Carbon Manganese Steel, For Fixed Offshore Platforms.

TEST AND INSPECTION PER: 12-SAMSS-018, and Specifications As Noted Below.

(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE


(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0010
0010
***R X
Pre-Fabrication/Production Requirements
Welding Procedure Specifications & Procedure Qualification
Specification Details / Notes:
Per SAEP 352, Per AWS D1.1. For API 2B material.
Records

0020 R Welders Qualification Records Per AWS D1.1. For API 2B material.

0030 X Steel Shall conform to those listed in API RP 2A-WSD, table 8.1.4-1,
8.1.1-2, 8.2.1-1 as group II or I. Group III shall not be used.

0020
0010
*** In process inspection & test requirement
PL1 Plates & RT1 Tubulars:
Specification Details / Notes:

0020 R X a) Material Shall conform to API 2H grades 42 or grade 50.

0030 R X b) Supplementary Requirements See 12-SAMSS-018

0040 PL2 Plates & RT2 Tubulars:

0050 R X a) Material Shall conform to API 2H grades 42 or grade 50.

0060 R X b) Supplementary Requirements See 12-SAMSS-018.

0070 PL4 Plates & RT4 Tubulars:

0080 R X a) Material Shall conform to any material listed in API RP 2A for group I &
II.

0090 R X b) Supplementary Requirements See 12-SAMSS-018.

0100 SH2 Shapes:

0110 R X a) Material Shall conform to any material listed in API RP 2A for group I &
II.

IR121400 Continued...
INSPECTION & TESTING REQUIREMENTS REVISION: 06/14/2016 CODE NUMBER: PAGE:
SAUDI ARAMCO FORM-175 REPLACES: 06/15/2011 IR121400 2 of 3
(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE
(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0120 R X b) Supplementary Requirements See 12-SAMSS-018.

0130 SH4 Shapes:

0140 R X a) Material Shall conform to any material listed in API RP 2A for group I &
II.

0150 R X b) Supplementary Requirements See 12-SAMSS-018.

0160 T2 Pipe:

0170 R X a) Material Shall conform to API 5L grade X52.

0180 R X b) Supplementary Requirements See 12-SAMSS-018

0190 T3 Pipe:

0200 R X a) Material Shall conform to API 5L grade X52.

0210 R X b) Supplementary Requirements See 12-SAMSS-018

0220 T4 Pipe:

0230 R X a) Material Shall conform to API 5L grade B.

0240 R X b) Supplementary Requirements See 12-SAMSS-018.

0030
0010
*** Final inspection & test requirements
Tolerances:
Specification Details / Notes:

0020 H X a) As-rolled Permissible variations shall be as specified in ASTM A6.

IR121400 Continued...
INSPECTION & TESTING REQUIREMENTS REVISION: 06/14/2016 CODE NUMBER: PAGE:
SAUDI ARAMCO FORM-175 REPLACES: 06/15/2011 IR121400 3 of 3
(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE
(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0030 H X b) Structural Pipes T2, T3, & T4 Dimensions & tolerances shall be as specified in API 2B.

0040 W Pipe Ends Shall be as specified in Purchase Order.

0050 W End Protectors Shall be used for beveled ends.

0060 W X Marking Shall be in accordance with 12-AMSS-005, note specific


requirement listed in 12-SAMSS-018.

0070 R X Compliance Certificate

0080 R X Product Test Certificate and records As per applicable SAMSS and IR

Notes:
(1) Refer detailed instruction sheet SA175 form IR000003 of inspection requirement for ideal use of this form.

End of IR121400

You might also like