INSPECTION & TESTING REQUIREMENTS REVISION: 03/12/2017 CODE NUMBER: PAGE:

SAUDI ARAMCO FORM-175 REPLACES: 12/03/2015 IR160300 1 of 2


SCOPE: INDOOR CONTROLGEAR; High Voltage, Built to Either IEC or NA, 50 or 60Hz, 3 Phase up to 4160 volts.

TEST AND INSPECTION PER: 16-SAMSS-506and Specifications as Noted Below.

(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE


(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0010
0010
***R X
Pre-Fabrication/Production Requirements
Certified Design/Type Test
Specification Details / Notes:
16-SAMSS-506

0020 R X Manufacturer’s Inspection and Test Plan PO Specifications and 16-SAMSS-506

0030 R X Test Certificates of Sub-components

0020
0010
***R X
In process inspection & test requirement
Enclosure
Specification Details / Notes:

0020 R X Conductors

0030 R X Motor Space Heater System

0040 R X Switching Devices

0050 R X Interlocks

0060 R X Assembly

0070 R X Workmanship, Components, Dimensions, and Painting

0030
0010
***
W R X
Final inspection & test requirements
Visual and Dimensional Inspection
Specification Details / Notes:
Refer Note (2)

0020 W R X Routine Tests Refer Note (2)

0030 W R X IFAT Testing If Applicable. Refer Note (2)

IR160300 Continued...
INSPECTION & TESTING REQUIREMENTS REVISION: 03/12/2017 CODE NUMBER: PAGE:
SAUDI ARAMCO FORM-175 REPLACES: 12/03/2015 IR160300 2 of 2
(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE
(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0040 W R X Protection, Control and Metering Refer Note (2)

0050 W R X Product Identification, Traceability and Marking Refer Note (2)

0060 W R X Accessories Refer Note (2)

0070 W R X Preparation for Shipping Equipment shall be shipped completely assembled whenever
possible.

0080 R X Certificate of Compliance

0090 R X Product Test Certificate

Notes:
(1) Refer details instruction sheet 175-000003 of inspection requirement for ideal use of this form.
(2) 100% QC checks must be done by Manufacturer’s Inspector. Buyer Inspection Representative shall witness 7% of offered lot per model/type per
Purchase Order unless otherwise directed by the Responsible Inspection Office.

End of IR160300