INSPECTION & TESTING REQUIREMENTS REVISION: 04/30/2011 CODE NUMBER: PAGE:

SAUDI ARAMCO FORM-175 REPLACES: 12/30/2005 IR325512 1 of 1


SCOPE: COMBUSTION GAS TURBINE PACKAGE: STARTER MOTOR

TEST AND INSPECTION PER: Manufacturer Standard and Specifications as noted below.

(1) VISUAL INSPECTION WITNESSING BY INSPECTOR (Note 1)


(2) CERTIFICATES / RECORDS TO BE CHECKED BY INSPECTOR
(3) CERTIFICATES / DATA TO BE PROVIDED BY VENDOR / SUPPLIER / MANUFACTURER
0010
0010
*** X
Pre-Fabrication/Production Requirements
Design Data Test
Specification Details / Notes:

0020 X Vendor design drawing Shall be submitted to COMPANY for review.

0030 X Material certificates Shall be submitted to COMPANY for review.

0020 *** In process inspection & test requirement Specification Details / Notes:
0030
0010
***X X
Final inspection & test requirements
Routine Tests
Specification Details / Notes:
Per NEMA MGI or IEC60034.

0020 X Surge Test

0030 X Power Factor Tip-Up Test

0040 X Stator Winding Immersion Test or Sealed Winding Conformance Test is required for marine condition locations only.
Test

0050 X Stator Core Test

0060 X Name plate and Marking

0070 X Painting Manufacturer standard for the site condition.

0040 *** Additional/Supplemental Requirements Specification Details / Notes:

Notes:
(1) May only be waived by the responsible Saudi Aramco, ASC,and AOC Inspection Offices.
(2) See form SA175 - 000003 for instructions on using this form.

End of IR325512