TEST AND INSPECTION PER: 04-SAMSS-049 & API-6A and Specifications As Noted Below.
0012 X Valve Certification Requirements and approved casting & forging Only for API 6A PSL 4 and greater
sub suppliers list
0020 X Drawing Approval and valve data sheet Verify Company approval.
0040 X NDT Personnel and Procedure Reviews verify valid personnel qualification and approved procedures.
0050 X Welding Procedure Specification (WPS), Procedure Qualification Company approval required.
Records(PQR), and Welder Qualification
0020
0010
*** X
In process inspection & test requirement
PWHT
Specification Details / Notes:
Per API 6A (PSL 3)
0060 X Hardness Tests 04-SAMSS-049 & API 6A: Hardness testing locations and
frequency shall be by the Vickers 1 - 10-kg method only for
evaluation of hard facing and overlay procedure
IR045600 Continued...
INSPECTION & TESTING REQUIREMENTS REVISION: 06/29/2011 CODE NUMBER: PAGE:
SAUDI ARAMCO FORM-175 REPLACES: 09/11/2006 IR045600 2 of 2
(1) VISUAL INSPECTION WITNESSING BY INSPECTOR (Note 1)
(2) CERTIFICATES / RECORDS TO BE CHECKED BY INSPECTOR
(3) CERTIFICATES / DATA TO BE PROVIDED BY VENDOR / SUPPLIER / MANUFACTURER
0090 X b) Liquid Penetrant Testing (LP) & Magnetic Particle (MT) 04-SAMSS-049
0120 X X Weld Inspection (NDE) : Visual, Surface NDE, Repair welding and Per API 6A PSL 3
volumetric NDE
0030
0010
***
X
Final inspection & test requirements
Pressure Testing; Hydro, Pneumatic
Specification Details / Notes:
Per 04-SAMSS-049 and API 6A, PSL 3.
0040 X Assembled Equipment Inspections API 6A, PSL 3: Assembly serialization, traceability records.
0070 X Draining after Testing, Sealing, Surface Protection, Rust Per 04-SAMSS-049, API 6A, and PO specification.
Prevention,Marking, and Preparation for Shipment
Notes:
(1) May only be waived by the responsible Saudi Aramco, ASC, or AOC Inspection Offices.
(2) See form SA175-000003 for instructions on using this form.
(3) Extent of witness shall be determined in the Pre inspection Meeting.
End of IR045600