A A' B +4.50 B A' A +4.
50
ROOF LEVEL ROOF LEVEL
+4.50 +4.50
Plasterd & Painted HCB wall Plasterd & Painted HCB wall
+3.00 +3.00
ROOF LEVEL ROOF LEVEL
+3.00 +3.00
+2.20
+1.20 +1.20
Plasterd & Painted HCB wall
Plasterd & Painted HCB wall Plasterd & Painted HCB wall
±0.00 ±0.00
GR. FLOOR LEVEL GR. FLOOR LEVEL
+0.00 -0.30 +0.00 -0.30
FRONT ELEVATION sc 1:50 REAR ELEVATION sc 1:50
2 1 +4.50
1 2 +4.50
ROOF LEVEL ROOF LEVEL
+4.50 +4.50
+3.00 +3.00
ROOF LEVEL ROOF LEVEL
+3.00 +3.00
+1.20
Plasterd & Painted HCB wall
Plasterd & Painted HCB wall
±0.00 ±0.00
GR. FLOOR LEVEL GR. FLOOR LEVEL
+0.00 -0.30 +0.00 -0.30
RIGHT SIDE ELEVATION sc 1:50 LEFT SIDE ELEVATION sc 1:50
28 GCIS roof cover
4X5cm purlin
10cm Ø rafter & horizontal member
A' 6cm Ø vertical and diagonal members
A A' B 8mm chipwood ceiling +4.50
ROOF LEVEL
520 +4.50
250 250
20 65 100 65 20 65 100 65 20 A 338 B
1
20
20
20
70
+3.00
ROOF LEVEL
B B +3.00 110 100 100 100 100 110
50 50
230
100
250
STUDIO
FF PVC Tile
420
400
+1.20 +1.20
10
20
20 80 150 20 110 120 20
210
BATH ROOM
140
130
FF Ceramic Tile
150
VARANDAH
FF Terrazzo Tile
±0.00
GR. FLOOR LEVEL
+0.00 -0.30
2
20
20
20
20 85 60 85 20 230 20
FF Material
10cm mass concrete Slab
25 cm hard core
FLOOR PLAN sc.1:50 Selected Material
Compacted Earth
SECTION B-B sc 1:50
M
È 0930
NO REVISION DATE SIGN
LOCATION ZONE AREA PARCEL NUMBER
AA HOUSE NO
WOREDA
m2 -
Project Tittle:
RESIDENTIAL
LEGEBD Project status
All horizontal dimensions are in CMAll NEW MODIFICATION AS-BUILT
vertical Dimensions are in M Owner :
ADT
R O A D Drawing title :
All Elevations, Section & Floor Plan Drawing No:
Designed by: Scale:
STAFF
AR 01
SITE PLAN sc.1:200
Drawn by: STAFF Date
2010
01
Checked by: STAFF