0% found this document useful (0 votes)
52 views1 page

Updated Layout for 400kV GIS Project

The document outlines updates in REV-04 regarding the finalized location of the D/C tower, line side equipment, and the addition of a line side isolator. It also includes details about the 11kV SEB supply arrangement and updates on the location of various electrical components. Additionally, it notes that the roads shown in the layout are for reference only and the final road layout will be based on approved designs.

Uploaded by

kapipak142
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

Updated Layout for 400kV GIS Project

The document outlines updates in REV-04 regarding the finalized location of the D/C tower, line side equipment, and the addition of a line side isolator. It also includes details about the 11kV SEB supply arrangement and updates on the location of various electrical components. Additionally, it notes that the roads shown in the layout are for reference only and the final road layout will be based on approved designs.

Uploaded by

kapipak142
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

N

W
E

FOLLOWING ARE THE POINTS UPDATED IN REV-04 -


1. D/C TOWER LOCATION IS FINALISED AT 82 METERS FROM 400kV S/S GANTRY.
2. LINE SIDE EQUIPMENT FINALISED.
3. LINE SIDE ISOLATOR ADDED IN LAYOUT AND SUITABLY OTHER LINE SIDE EQUIPMENT
(WT/CVT/BPI/LA) SHIFTED.
4. 11kV SEB SUPPLY ARRANGEMENT DETAILS ADDED.
5. LOCATION OF NGR/120kV LA/145kV CB IS UPDATED.
NOTE - ROADS SHOWN IN THIS LAYOUT IS FOR REFERENCE ONLY. FINAL ROAD SHALL
BE CONSIDERED AS PER APPROVED ROAD LAYOUT.

5.5M WID
E ROAD
Digitally signed by

Bijoy
Bijoy Mishra
DN: cn=Bijoy Mishra,
o=Adani Transmission,
ou=Engineering,

Mishra email=bijoykumar.mis
hra@adani.com, c=IN
Date: 2020.12.02 BQ010
N

BQ010
N

15:07:15 +05'30' U W U W

V V

LT SWITCHYARD
(FOR SEB CONNECTION)

Susant
Digitally signed by
Susanta Kumar
Padhy

a DN: cn=Susanta
Kumar Padhy,
o=Adani Infra India

Kumar Ltd, ou=Engineering,


email=Susanta.Padh
y@adani.com, c=IN
Padhy Date: 2020.12.02
15:33:31 +05'30'

5.5M WIDE ROAD

D
A

W1
7

W1

W1
W1
5.5M WID

LOADING & UNLOADING


6

PLATFORM

ACDB/DCDB ROOM
RS

11000X16572

W1
D1
5

TEST LAB & STORE


E ROAD

3580X3847
(F/C) PANTRY
4810X2400
W2

W1
D2
D2
4

INCHARGE

3630X6362
ROOM

D1
W1

W1
D1
3

EXECUTIVE

1500X2100
TOILET

D4
(FC)

D1

UP
V1

GW2
D3
1975X3500
M.TOI.

(FC)
V1

800mm
2

FFL.
CONFERENCE

MAINTENANCE BAY
D2
3000X6362
ROOM

GW1
MD
1

W1
W1
W1

W1

W1 W1
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
A'
A
FD
400kV GIS HALL
1'

CAGE LADDER TO
ACCESS WALKWAY
UP FD AT GANTRY LEVEL 1500mm WALKWAY (FFL) FD UP
C'
A'

AS/ PEB

3.75M WIDE ROAD


CRP ROOM
B UP

1500mm WALKWAY (FFL)


MAINTENANCE
RAMP

5.5M WIDE ROAD UP SLOPE RS1 SPACE


3000 x 6000 W1

* C 400KV GIS HALL


49843X15840
UP UP

FFL.
800mm

W1 W1
1500mm WALKWAY (FFL) CAGE LADDER
400kV GIS HALL AS PER PEB

D
D1 GW1 D1
D'
W1 W1 W1 W1

UP D
AHU ROOM
6500X5000 RELAY PANEL ROOM
24722X5000

LM1
5.5M WIDE ROAD

D1 D1
PS

PS

PS

WL W2 W2 W2 W2 W2
PS

PG

UP UP
PS PS PS PG PS

5.5M WIDE ROAD

5.5M WIDE ROAD


WITHDRAWL DIRECTION

WITHDRAWL DIRECTION

WITHDRAWL DIRECTION

WITHDRAWL DIRECTION
HV SIDE

CONTROL CUBICLE SUPPORTS CONTROL CUBICLE SUPPORTS CONTROL CUBICLE SUPPORTS CONTROL CUBICLE SUPPORTS
BOLTS M16 FOR COOLER BOLTS M16 FOR COOLER BOLTS M16 FOR COOLER BOLTS M16 FOR COOLER
90°

90°

90°
90°

POSITION OF FOUNDATION POSITION OF FOUNDATION POSITION OF FOUNDATION POSITION OF FOUNDATION


87601

87601
18150

18150

18150

18150
15900

15900

15900

15900
3 3
CL OF RAIL CENTER

CL OF RAIL CENTER

CL OF RAIL CENTER

CL OF RAIL CENTER

27000
27000 27000 27000
90°

90°

90°

90°
42751
42751 42751 42751

HV SIDE VIEW HV SIDE VIEW HV SIDE VIEW HV SIDE VIEW


28500

57001

6
78001

78001

36001

28350

12000 12000 12000

1 1 1 4 5
3 3
15000

66001

54001

2
LV SIDE VIEW

LV SIDE VIEW

LV SIDE VIEW

LV SIDE VIEW
2 2
2
60001

3U 5 5
3U 3U 3U
52501

52501
50401

4875

4875

5
33000
26145

24150

CL OF RAIL CENTER CL OF RAIL CENTER CL OF RAIL CENTER C


L OF RAIL CENTER
52291±1
Ø33001

Ø33001

Ø33001

Ø33001
3V CL OF RAIL GAUGE 3V 3V 3V CG
5
CL
18150

OF RAIL GAUGE
=

27000

PLATFORM PLATFORM PLATFORM PLATFORM


4875

5 5

3W 3W 3W 3W
52501

52501
54001

2 2 2
61951

2
TRACK GAUGE (50281) TRACK GAUGE(50281) TRACK GAUGE (50281)
66001

54001

3 5 3
4
36001

1 1 1
28500
12000

33001

12000
78001

57001

12000 12000

6
CL OF RAIL GAUGE

78001

IV SIDE
3 3
IV SIDE VIEW IV SIDE VIEW IV SIDE VIEW IV SIDE VIEW
87601

87601
175203

MAINTENANCE BAY
RAMP UP 3.75M WIDE ROAD

220kV GIS HALL


WL W2 W2 W2 W2

D1

LM3
FFL.
AHU ROOM D1 UP
800mm
UP D 4900X3500 RELAY PANEL ROOM
23590X3500
FFL.
800mm

D2
GW1

1500mm WALKWAY (FFL)


W1 W1
BUS
LINE-I LINE-II LINE-III ICT-I ICT-II LINE-IV LINE-V BUS VT COUPLER ICT-III LINE-VI LINE-VII ICT-IV
MAINTENANCE SPACE

LCC LCC LCC LCC LCC LCC LCC LCC LCC LCC LCC LCC

3.75M WIDE ROAD UP


RAMP
SLOPE RS
FFL.
800mm
W1

220kV GIS HALL


34434X11770

LM2
1500mm WALKWAY (FFL) UP
FD
W1

W1 W1 W1 W1 W1 W1 W1 W1

CLIENT:

PROJECT:

LEAD JV PARTNER JV PARTNER

LOA NO.:

TITLE:

CLIENT DRAWING NO.:

You might also like