The document contains a detailed concourse level plan for a station, including various areas, dimensions, and specifications for different facilities such as escalators, lifts, and ticket vending machines. It emphasizes the confidentiality of the information and prohibits unauthorized use or disclosure. Additionally, it includes references to related drawings and a room data schedule with area specifications for each room.

Uploaded by

Anup Pandey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views1 page

IND - SC4 Concourse Plan - R0

The document contains a detailed concourse level plan for a station, including various areas, dimensions, and specifications for different facilities such as escalators, lifts, and ticket vending machines. It emphasizes the confidentiality of the information and prohibits unauthorized use or disclosure. Additionally, it includes references to related drawings and a room data schedule with area specifications for each room.

Uploaded by

Anup Pandey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

F E D C B A

THIS DRAWING AND ANY INFORMATION OR DESCRIPTIVE MATTER SET OUT HEREON IS PROPERTY OF MPMRCL AND IS CONFIDENTIAL AND SUBJECT TO COPYRIGHT. IT MUST NOT BE DISCLOSED, LOANED, COPIED OR USED FOR MANUFACTURING, TENDERING OR FOR ANY OTHER PURPOSE WITHOUT WRITTEN PERMISSION OF MPMRCL

TO SUPER CORRIDOR 5 SUPER CORRIDOR 4 TO SUPER CORRIDOR 3


CH.18+241.24(CL)
N: 2517520.30
E: 583270.80
4 4

P018 1 2 3 4 5 C/L 6 7 8 9 10 P019


C. B.
3502 3501

140400
13000 13000 17200 17200 17200 17200 17200 13000 13000
1200 1200
ESC-5
LEVEL - CLP TO PLP
WIDTH - 1000
RISE - 6750
LENGTH - 19990
ST-5 02 ST-6 ESC-6
R05.1 R05 LEVEL = CLP TO PLP LEVEL = CLP TO PLP LEVEL - CLP TO PLP
R07 R08 R09 R13
R01.2 RISER = 150MM
4200
RISER = 150MM WIDTH - 1000
DFT FT PS-02 TREAD = 300MM TREAD = 300MM CLR JC REF RISE - 6750 SEC
PROVISION FOR
LOADING / FOB FOR ENTRY/EXIT -2
ENTRY/EXIT - 1 4 m² 13 m² NO. OF STEPS = 45 NO. OF STEPS = 45
7 m² 5 m² 6 m² LENGTH - 19990
15 m²
UNLOADING DECK
21 m²

ATM UP UP
FHC UP UP RET-1 R22
+565.375 m FFL 34 m² S&T MR R21
+565.225 m UFL FRB 18 m²
MDT UP
TER
BSM S&T-01 ES-01 PDWF FHC 51 m²
CUTOUT AT 2 m² 3 m² FHC
TRACK LVL. FHC AFC CUTOUT AT
R02 AFC TRACK LVL.
LF-5
UPS2 R12 R25
LEVEL - CLP TO PLP R23 R20
WIDTH - 2500 EFO 2 TOM 2 R24
3 24 m² TR SER EPR 3
TVM TVM DEPTH -2100
8 m² 20 m² STR
RISE - 6750 29 m² 4 m²
8 m²
ATM
TVM
RWD-03 RWD-04 VM RWD-05 RWD-06 VM RWD-08
R01
B ASS TSS
457 m²
TVM TVM

TVM
R29 +565.375 m FFL R29 R19 +565.675 m FFL R26 04
PCA +565.225 m UFL PCA R28 PASSAGE CUTOUT AT
+565.225 m UFL ODU
03 R27 R04 TR LF-6
BSM TRACK LVL. 4400
1159 m²
+565.375 m FFL LEVEL - CLP TO PLP 1159 m² UPA 2 65 m² 32 m²
UPA 1 EFO 1 WIDTH - 2500
4300 +565.225 m UFL 321 m²
R03 214 m² 8 m² DEPTH -2100
AFC +565.375 m FFL
RISE - 6750
+565.375 m FFL TOM 1 +565.225 m UFL
10500

+565.225 m UFL FHC S&T-02 ES-03


CUTOUT AT 21 m² AFC FHC SDWF FHC
TRACK LVL. 2 m² 3 m² MDT
UP R16 R17 R18
FRB SCR UPS 1 ( S & T) PSG
A. 36 m² 57 m² 17 m² A.
3000 UP UP UP UP 3000
FHC ATM

C FA-05
R01.1 PROVISION FOR ESC-8 R06.1 PS-03 R06 ST-8 01 ST-7 R10 R11 ESC-7 R15 R14
LEVEL - CLP TO PLP LEVEL - CLP TO PLP FOB FOR
LOADING / ENTRY/EXIT - 4 TGT MT LEVEL = CLP TO PLP LEVEL = CLP TO PLP STF-M STF-F CMR STM ENTRY/EXIT - 3
WIDTH - 1000 RISER = 150MM 4100 RISER = 150MM WIDTH - 1000
UNLOADING DECK RISE - 6750 4 m² 14 m² TREAD = 300MM TREAD = 300MM 9 m² 10 m² RISE - 6750 11 m² 10 m²
21 m² LENGTH - 19990 NO. OF STEPS = 45 NO. OF STEPS = 45 LENGTH - 19990

C. B.
2 2
3502 3501

PART A- REFER DRG. NO. IND-L003-RAS-ARC-DRG-SC4-01-2101 PART B- REFER DRG. NO. IND-L003-RAS-ARC-DRG-SC4-01-2102 PART C- REFER DRG. NO. IND-L003-RAS-ARC-DRG-SC4-01-2103
DN

FIRE EXIT REQUIRED IN 2054

CONCOURSE LEVEL PLAN


1 ROOM DATA SCHEDULE ABBREVIATIONS
1 : 200 ESC ESCALATOR
RM ST STAIRCASE
NO. NAME DESCRIPTION AREA LF LIFT
- RET-1 RETAIL AREA 1 34 m² PRM PEOPLE WITH RESTRICTED MOBILITY
- ENTRY/EXIT 03 LIFT LOBBY - 17 m²
EN ENTRY GATE
- ENTRY/EXIT 03 ENTRANCE LOBBY - 21 m²
- ENTRY/EXIT 01 ENTRANCE LOBBY - 21 m² EX EXIT GATE
- ENTRY/EXIT 03 LOBBY - 39 m² F FUTURE GATE
- ENTRY/EXIT 01 LIFT LOBBY - 17 m² W WIDE GATE
- FOB-03 FOOT OVER BRIDGE - 03 44 m² AFC AUTOMATED FARE COLLECTION - IN & OUT
ENTRY/EXIT-01 DG AND PUMP ROOM - ENTRY/EXIT 01 LIFT LOBBY 17 m²
TR TICKET READER
- ENTRY/EXIT 01 LOBBY 40 m²
- FOB 41 m² LDB DISTRIBUTION BOARD
- PF-1 PLATFORM 1 871 m² PDWF PUBLIC DRINKING WATER FOUNTAIN
- PF-2 PLATFORM 2 865 m² SDWF STAFF DRINKING WATER FOUNTAIN
R01 ASS TSS AUXILIARY & TRACTION SUB STATION 457 m² ATM AUTOMATED TELLER MACHINE
FUTURE R01.1 LOADING / UNLOADING DECK - 21 m²
BSM BAGGAGE SCANNER MACHINE
ENTRY/EXIT - 02 R01.2 LOADING / UNLOADING DECK - 21 m²
R02 UPS2 UNINTERRUPTED POWER SUPPLY ROOM 2 24 m² FRB FRISKING BOOTH
3 3
STATION BOX R03 TOM 1 TICKET OPERATING MACHINE ROOM 1 21 m² MDT METAL DETECTOR
R04 EFO 1 EXCESS FARE OFFICE 8 m² VM VENDING MACHINE
R05 FT FEMALE TOILET 13 m² TVM TICKET VENDING MACHINE
R05.1 DFT DISABLED FRIENDLY TOILET 4 m²
FHC FIRE HOSE CABINET
R06 MT MALE TOILET 14 m²
FAP FIRE ALARM PANEL
R06.1 TGT TRANS GENDER TOILET 4 m²
R07 CLR CLEANER ROOM 7 m² TCP TELECOM CONTROL PANEL
R08 JC JANITOR CLOSET 5 m² PSA PSG ALARM PANEL
R09 REF REFUSE ROOM 6 m² PSL PSG LOCAL CONTROL PANEL
R10 STF-M STAFF ROOM - MALE 9 m²
ETS EMERGENCY TRIP SWITCH
R11 STF-F STAFF ROOM - FEMALE 10 m²
SPKS STAFF PROTECTION KEY SWITCH
R12 EFO 2 EXCESS FARE OFFICE 8 m²
R13 SEC SECURITY ROOM 15 m² PESP PLATFORM EMERGENCY STOP PLUNGER
R14 STM STATION MANAGER ROOM 10 m² EIP ESCALATOR ISOLATOR PANEL
R15 CMR COMMON MAINTENANCE ROOM 11 m² LIP LIFT ISOLATOR PANEL
R16 SCR STATION CONTROL ROOM 36 m² TB TRASH BIN
R17 UPS 1 ( S & T) UNINTERRUPTED POWER SUPPLY ROOM 1 57 m²
FD FLOOR DRAINS
R18 PSG PLATFORM SCREEN GATE 17 m²
FUTURE R19 PASSAGE - 65 m²
ENTRY/EXIT-04 R20 EPR ELECTRICAL PANEL ROOM 4 m²
R21 TER TELECOM EQUIPMENT ROOM 51 m²
HATCH LEGEND
R22 S&T MR SIGNALLING & TELECOM MAINTAINANCE 18 m² 450MM LIGHT WEIGHT FILLED FLOOR
ROOM
FIRE /EXIT-01 R23 SER SIGNALLING EQUIPMENT ROOM 29 m²
FIRE EXIT REQUIRED IN 2054 450MM FALSE RAISED FLOOR
R24 STR STORE 8 m²
R25 TOM 2 TICKET OPERATING MACHINE ROOM 2 20 m² ALL LEVELS ARE WITH RESPECT TO UFL
ENTRY/EXIT-03 R26 ODU OUT DOOR UNIT 32 m²
R27 UPA 1 UNPAID CONCOURSE AREA 1 214 m²
OVERALL CONCOURSE LEVEL PLAN R28 UPA 2 UNPAID CONCOURSE AREA 2 321 m²

2 R29 PCA PAID CONCOURSE AREA 1159 m²

4 1 : 500 GOOD FOR CONSTRUCTION 4

NOTES: NOTES: WALL LEGEND : REFERENCES DRAWINGS & DOCUMENTS : KEY PLAN BHAWARSHALA STATION BOX KEY PLAN MPMRCL
SUPER CORRIDOR 1 E2
SQUARE
1. ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS ARE IN METERS. 8. FHC IS TO BE PROVIDED AT TOP LANDING OR AS APPROVED BY FIRE AUTHORITIES. FOR DES. NAME SIGN
1. WT 01 200 THK. CONCRETE BLOCK WORK
2. THE WORK SHALL BE EXECUTED AS PER SHOP / WORKING DRAWINGS PREPARED BY 9. ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH RELEVANT 01) ALIGNMENT DRAWING : 8402-IND-L003-PLAN R5
SUPER CORRIDOR 2 MR 10 ROAD
ENTRY/EXIT-01 C B ENTRY/EXIT-02 (FUTURE)
THE CONTRACTOR BASED ON THE GFC DRAWINGS AND AS CONSENTED FOR "NO STRUCTURAL & E&M DWGs. 02) FINISHING DETAILS : IND-L003-RAS-ARC-DRG-T03-ZZ-1001/1002/1005
2. WT 02 200 THK. AAC BLOCK WORK
OBJECTION" BY THE ENGINEER 10. 150MM FLOOR FINISH UNLESS OTHERWISE MENTIONED. 03) DOOR & WINDOW DETAILS : IND-L003-RAS-ARC-DRG-T03-ZZ-9001 TO 9005 GM/CIVIL
3. E&M DETAILS SHOWN IN THE DRAWINGS ARE INDICATIVE ONLY. REFER RESPECTIVE 11. AS PER INFORMATION AVAILABLE FOR RAILWAY BRIDGE NO. 566, HIGH FLOOD LEVEL IS 04) RAILING DETAILS (RL01-RL12 ) : IND-L003-RAS-ARC-DRG-T03-ZZ-9301 TO 9304
3. WT 03 100 THK. CONCRETE BLOCK WORK SUPER CORRIDOR 3
DETAILED DRAWINGS OF E&M. FOLLOWED AS 537.14 M. E3 E4
SR. DGM/
4. MASONRY OPENINGS ARE EXCLUDING PLASTER FINISH. 12. LIFT FRONT WALL IS IN BLOCK WORK. DIMENSIONS TO BE CONFIRMED BY VENDOR. SUPER CORRIDOR 4
A
PART A PART B PART C A E&M
5. PLINTH LEVEL FOR ENTRY EXIT MIGHT VARY AS PER SITE CONDITION. 13. LOCATION OF LIFT HOOKS HAS BEEN SHOWN ON DRAWING. LOAD HOOKS SHALL BE
6. FRONT WALLS WITH BRICKS / BLOCKS AT ALL LIFT LANDINGS SHALL BE CONSTRUCTED PROVIDED BY VHS CONTRACTOR. GENERAL CONSULTANTS SUPER CORRIDOR 5
AFTER FIXING OF LIFT DOORS, CONTROL PANEL ETC. IN CONSULTATION WITH LIFT
REFER TO THE COMMENTS PROVIDED BY DVE N
VENDOR. CHECKED NAME SIGN C B
7. SHAFT AT GROUND LEVEL WILL HAVE PLINTH OF 150 MM ABOVE FINISHED FLOOR LEVEL SUPER CORRIDOR 6
E1
AND DOOR WILL HAVE 150 MM UP STAND ABOVE SHAFT PLINTH LEVEL. DY. PD/PD ENTRY/EXIT-03
ARCHITECTURAL
ENTRY/EXIT-04 (FUTURE)
GANDHI NAGAR SQUARE

REVISIONS CONTRACTOR & DETAILED DESIGN CONSULTANT (DDC): QUALITY ASSURANCE CIVIL & STRUCTURAL EMPLOYER : PROJECT :

The responsibility of control, check and verification of accuracy,


174 / 2 Shakti Nagar,
Alkapuri, Opposite correctness, completeness, integration and full compliance of Contract GEO-TECHNICAL SIGN
MADHYA PRADESH INDORE METRO RAIL YELLOW LINE PACKAGE IN03
Gate -1, Bhopal
462024
provisions in respect of design analysis and drawing rests with Design &
Build Contractor.
METRO RAIL CORP.
DDC DVE Contractor
TRACK
LIMITED (MPMRCL) DRAWING TITLE :
5 Oz Plaza , 2nd Floor , Viman Nagar, Off
Nagar Road , Pune 411014 SWATI Digitally signed ELAYAR ELAYARAJA MEP SUPER CORRIDOR 4 5
by SWATI AE Digitally

ARCHITECTURAL-CONCOURSE LEVEL PLAN


signed by AE
Tel : 020 41068686 KESHAV KESHAV Chidananda AJA SUBRAMANI
GENERAL CONSULTANTS :
Email :pune@assytem.com
SIGN
MEHWALA
MEHWA Date: Chida Date: 2023.04.21
2023.04.12 SUBRA 02:26:20 SIGNALING NAME
LA
2023.04.11
15:54:24 +05'30' nanda +05'30'
00:15:18
MANI +05'30'
DESIGN VERIFICATION ENGINEER (DVE) : The responsibility of control, check and DRAWING NO. : REVISION DWG STATUS

Indian Institute of Technology Madras


verification of accuracy,correctness,
integration and full compliance of DATE 10/04/2023 10/04/2023 10/04/2023 TELECOM IND-L003-RAS-ARC-DRG-SC4-01-2100
IIT P.O., Chennai 600 036 consultancy contract provisions in
respect of design analysis NAME SKM SM AEC SCALE : DATE : 24/01/2022
R0 W
R0 10/04/2023 FIRST ISSUE INDIA
and drawing rests with design & built POWER SUPPLY & TRACTION DATE
REV. DATE. BRIEF DESCRIPTION contractor. PREPARED BY CHECKED BY APPROVED BY APPROVED BY ISSUED BY DB ENGINEERING & CONSULTING GMBH - GEODATA ENGINEERING S.P.A - LOUIS BERGER SAS PRELIMINARY DWG (P), DEFINITIVE DWG (D), CONSTRUCTION REFERENCE DWG (C), WORKING DRAWING (W), AS BUILT DWG (B), SHOP DWG (S), MANUFACTURED DWG (M) SHEET SIZE - A1
E D C B A

You might also like