IND - SC4 Concourse Plan - R0
IND - SC4 Concourse Plan - R0
THIS DRAWING AND ANY INFORMATION OR DESCRIPTIVE MATTER SET OUT HEREON IS PROPERTY OF MPMRCL AND IS CONFIDENTIAL AND SUBJECT TO COPYRIGHT. IT MUST NOT BE DISCLOSED, LOANED, COPIED OR USED FOR MANUFACTURING, TENDERING OR FOR ANY OTHER PURPOSE WITHOUT WRITTEN PERMISSION OF MPMRCL
140400
13000 13000 17200 17200 17200 17200 17200 13000 13000
1200 1200
ESC-5
LEVEL - CLP TO PLP
WIDTH - 1000
RISE - 6750
LENGTH - 19990
ST-5 02 ST-6 ESC-6
R05.1 R05 LEVEL = CLP TO PLP LEVEL = CLP TO PLP LEVEL - CLP TO PLP
R07 R08 R09 R13
R01.2 RISER = 150MM
4200
RISER = 150MM WIDTH - 1000
DFT FT PS-02 TREAD = 300MM TREAD = 300MM CLR JC REF RISE - 6750 SEC
PROVISION FOR
LOADING / FOB FOR ENTRY/EXIT -2
ENTRY/EXIT - 1 4 m² 13 m² NO. OF STEPS = 45 NO. OF STEPS = 45
7 m² 5 m² 6 m² LENGTH - 19990
15 m²
UNLOADING DECK
21 m²
ATM UP UP
FHC UP UP RET-1 R22
+565.375 m FFL 34 m² S&T MR R21
+565.225 m UFL FRB 18 m²
MDT UP
TER
BSM S&T-01 ES-01 PDWF FHC 51 m²
CUTOUT AT 2 m² 3 m² FHC
TRACK LVL. FHC AFC CUTOUT AT
R02 AFC TRACK LVL.
LF-5
UPS2 R12 R25
LEVEL - CLP TO PLP R23 R20
WIDTH - 2500 EFO 2 TOM 2 R24
3 24 m² TR SER EPR 3
TVM TVM DEPTH -2100
8 m² 20 m² STR
RISE - 6750 29 m² 4 m²
8 m²
ATM
TVM
RWD-03 RWD-04 VM RWD-05 RWD-06 VM RWD-08
R01
B ASS TSS
457 m²
TVM TVM
TVM
R29 +565.375 m FFL R29 R19 +565.675 m FFL R26 04
PCA +565.225 m UFL PCA R28 PASSAGE CUTOUT AT
+565.225 m UFL ODU
03 R27 R04 TR LF-6
BSM TRACK LVL. 4400
1159 m²
+565.375 m FFL LEVEL - CLP TO PLP 1159 m² UPA 2 65 m² 32 m²
UPA 1 EFO 1 WIDTH - 2500
4300 +565.225 m UFL 321 m²
R03 214 m² 8 m² DEPTH -2100
AFC +565.375 m FFL
RISE - 6750
+565.375 m FFL TOM 1 +565.225 m UFL
10500
C FA-05
R01.1 PROVISION FOR ESC-8 R06.1 PS-03 R06 ST-8 01 ST-7 R10 R11 ESC-7 R15 R14
LEVEL - CLP TO PLP LEVEL - CLP TO PLP FOB FOR
LOADING / ENTRY/EXIT - 4 TGT MT LEVEL = CLP TO PLP LEVEL = CLP TO PLP STF-M STF-F CMR STM ENTRY/EXIT - 3
WIDTH - 1000 RISER = 150MM 4100 RISER = 150MM WIDTH - 1000
UNLOADING DECK RISE - 6750 4 m² 14 m² TREAD = 300MM TREAD = 300MM 9 m² 10 m² RISE - 6750 11 m² 10 m²
21 m² LENGTH - 19990 NO. OF STEPS = 45 NO. OF STEPS = 45 LENGTH - 19990
C. B.
2 2
3502 3501
PART A- REFER DRG. NO. IND-L003-RAS-ARC-DRG-SC4-01-2101 PART B- REFER DRG. NO. IND-L003-RAS-ARC-DRG-SC4-01-2102 PART C- REFER DRG. NO. IND-L003-RAS-ARC-DRG-SC4-01-2103
DN
NOTES: NOTES: WALL LEGEND : REFERENCES DRAWINGS & DOCUMENTS : KEY PLAN BHAWARSHALA STATION BOX KEY PLAN MPMRCL
SUPER CORRIDOR 1 E2
SQUARE
1. ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS ARE IN METERS. 8. FHC IS TO BE PROVIDED AT TOP LANDING OR AS APPROVED BY FIRE AUTHORITIES. FOR DES. NAME SIGN
1. WT 01 200 THK. CONCRETE BLOCK WORK
2. THE WORK SHALL BE EXECUTED AS PER SHOP / WORKING DRAWINGS PREPARED BY 9. ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH RELEVANT 01) ALIGNMENT DRAWING : 8402-IND-L003-PLAN R5
SUPER CORRIDOR 2 MR 10 ROAD
ENTRY/EXIT-01 C B ENTRY/EXIT-02 (FUTURE)
THE CONTRACTOR BASED ON THE GFC DRAWINGS AND AS CONSENTED FOR "NO STRUCTURAL & E&M DWGs. 02) FINISHING DETAILS : IND-L003-RAS-ARC-DRG-T03-ZZ-1001/1002/1005
2. WT 02 200 THK. AAC BLOCK WORK
OBJECTION" BY THE ENGINEER 10. 150MM FLOOR FINISH UNLESS OTHERWISE MENTIONED. 03) DOOR & WINDOW DETAILS : IND-L003-RAS-ARC-DRG-T03-ZZ-9001 TO 9005 GM/CIVIL
3. E&M DETAILS SHOWN IN THE DRAWINGS ARE INDICATIVE ONLY. REFER RESPECTIVE 11. AS PER INFORMATION AVAILABLE FOR RAILWAY BRIDGE NO. 566, HIGH FLOOD LEVEL IS 04) RAILING DETAILS (RL01-RL12 ) : IND-L003-RAS-ARC-DRG-T03-ZZ-9301 TO 9304
3. WT 03 100 THK. CONCRETE BLOCK WORK SUPER CORRIDOR 3
DETAILED DRAWINGS OF E&M. FOLLOWED AS 537.14 M. E3 E4
SR. DGM/
4. MASONRY OPENINGS ARE EXCLUDING PLASTER FINISH. 12. LIFT FRONT WALL IS IN BLOCK WORK. DIMENSIONS TO BE CONFIRMED BY VENDOR. SUPER CORRIDOR 4
A
PART A PART B PART C A E&M
5. PLINTH LEVEL FOR ENTRY EXIT MIGHT VARY AS PER SITE CONDITION. 13. LOCATION OF LIFT HOOKS HAS BEEN SHOWN ON DRAWING. LOAD HOOKS SHALL BE
6. FRONT WALLS WITH BRICKS / BLOCKS AT ALL LIFT LANDINGS SHALL BE CONSTRUCTED PROVIDED BY VHS CONTRACTOR. GENERAL CONSULTANTS SUPER CORRIDOR 5
AFTER FIXING OF LIFT DOORS, CONTROL PANEL ETC. IN CONSULTATION WITH LIFT
REFER TO THE COMMENTS PROVIDED BY DVE N
VENDOR. CHECKED NAME SIGN C B
7. SHAFT AT GROUND LEVEL WILL HAVE PLINTH OF 150 MM ABOVE FINISHED FLOOR LEVEL SUPER CORRIDOR 6
E1
AND DOOR WILL HAVE 150 MM UP STAND ABOVE SHAFT PLINTH LEVEL. DY. PD/PD ENTRY/EXIT-03
ARCHITECTURAL
ENTRY/EXIT-04 (FUTURE)
GANDHI NAGAR SQUARE
REVISIONS CONTRACTOR & DETAILED DESIGN CONSULTANT (DDC): QUALITY ASSURANCE CIVIL & STRUCTURAL EMPLOYER : PROJECT :