You are on page 1of 1

THANGAL STATION GOWRI ASHRAM STATION THIRUVOTTIYUR STATION

℄ OF PLATFORM
6243.291

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
160000

10000 10000 10000 12500 12500 12500 12500 12500 12500 12500 12500 10000 10000 10000

AA BB CC DD EE
48725 48726 48727 48728 48729

D-01.2
O-06.1
2575x1975
A
O-06.2
PART-1
2575x1975
STA-01 6585 4

9000

9800
48711
W 1800 FFL+21.260m

7180
DN O-03.1
T 300 UP
R 150 D-04.1 FOURTH FLOOR LEVEL
STA-F1 D-05.1
B W 1800
T 300 D-06.1
10785
R 150
B2 TOC+21.210m
7900

PD-09
O-06.5 FOURTH FLOOR LEVEL

13425
130 sqm
STA-07 2575x1975 EXPANSION JOINT
C DN W 1800 5935 3875
4700

T 300
PLATFORM ABOVE DN PLATFORM ABOVE

2800
R 150 FFL+21.260m
D

1800
3130

UP FOURTH FLOOR LEVEL


D'
7270

FFL+21.260m
FOURTH FLOOR LEVEL
E

223
0
L2 280 L2

00
48735 48735
7270

0 O-06.7 O-06.3
280 2575x1975 2575x1975 TRACK CENTER
STA-10 D-01.6 O-06.4 LINE ABOVE
F W 1800 2575x1975
STA-08
T 300 1060

2000
W 1800
5455

5255
R 150 UP

2000
86285

PLATFORM ABOVE T 300 UP DN. PLATFORM ABOVE

8780
R 150 10000
F'

4800
6075 2795 2465 4200 2000 4200 10310 STA-F2

8285
6810

EXPANSION JOINT W 1800

7815
2800 O-03.2 4000 T 300
19060 R 150
D-05.5
G L1
DN. UP
L1
48730 D-01.4 48730
D-04.5 14400 STA-06
W 2400
9500

T 300

FFL+21.260m B2 R 150
STA-05
H FOURTH FLOOR LEVEL W 2400
5910 T 300
TOC+21.210m R 150

9010
8500

FOURTH FLOOR LEVEL

29825
PD-10
420 sqm
D-06.3
J
D-02
10200
8500

D-06.4 800
ABOVE
D-04.4

6300
K PART-2 D-05.4
48712 D-01.3
8250

DN.

5200
STA-F3
W 2400
UP T 300
L R 150

AA BB CC DD EE
FOURTH FLOOR LEVEL PLAN 48725 48726 48727 48728 48729

SCALE 1:300
GENERAL NOTES

1. ALL LEVELS ARE IN METERS AND ALL THE DIMENSIONS ARE IN MILLIMETERS.
2. GROUND LEVELS, WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN
WALL SCHEDULE ABBREVIATIONS:- REVISION LOG B2 :
FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE.
LEGEND :- AFC AUTOMATIC FAIR COLLECTION 1. ES-01- ONE LIFT REMOVED AND ONE LIFT
3. RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO
STRUCTURAL DESIGN. HOWEVER DIMENSIONS OF ALL INTERNAL ELEMENTS LIKE RCC ROOM SCHEDULE SEC. / ELEV. NAME 1 150 THK. RCC WALL CL CENTER LINE RELOCATE,
CMRL CHENNAI METRO RAIL LIMITED 2. STAIRCASE ADDED REPLACED REMOVED LIFT,
WALLS AND COLUMNS SHALL BE RESTRICTED TO THE MAXIMUM SIZES SHOWN IN THE
2 400 THK. RCC WALL 3. FIRE ESCAPE STAIRCASE REARRANGED
ARCHITECTURAL DRAWINGS. Room Tag Room ID Description E&M ELECTRICAL AND MECHANICAL KEY PLAN
4. ALL MINIMUM INTERNAL CLEARANCES ARE MANDATORY. WALL AND SLAB THICKNESS DRAWING NUMBER ES ENTRY
D-01 Plumbing Shaft Plumbing Shaft 3 300 THK. RCC WALL
SHOULD BE INCREASED OUTSIDE,AS REQUIRED BY DESIGN. ESC ESCALATOR NOTE : THANGAL STATION GOWRI ASHRAM STATION THIRUVOTTIYUR STATION
D-02 FHC Fire Hose Cabinet FFL FINISH FLOOR LEVEL 1. REFER SEPARATE DRAWINGS FOR ENTRY
5. LOCATION AND NOS. OF MAIN COLUMNS SHALL BE AS PER CO-ORDINATED AND RCC WORK 4 200 THK. BLOCK WALL
CONFIRMED STRUCTURAL LAYOUT BY CONTRACTOR. D-04 Electrical Shaft Electrical Shaft LDB LIGHT DISTRIBUTION BOARD STRUCTURE DETAILS
6. INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M 5 300 THK. BLOCK WALL RCC REINFORCED CEMENT CONCRETE 2. FOR WALL TYPE AROUND LIFT SHAFT, LIFT
D-05 S&T Shaft S&T Shaft BLOCK WORK
DESIGN. STA STAIRCASE MATRIX REV-10 TO BE FOLLOWED AS FINAL
D-06 HVAC Shaft HVAC Shaft 6 100 THK. BLOCK WALL TS TRACK STEPS
7. ESCALATOR AND LIFT SIZES ARE INDICATIVE AND FINAL SIZES SHALL BE AS PER
MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO O-03 UnPaid Concourse area UnPaid Concourse area SUNKEN SLAB TOC TOP OF CONCRETE
7 250 THK. RCC WALL
BE AS PER E&M DRAWINGS.
8. REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. O-06 Lift Lift COLUMN 8 230 THK. RCC WALL
9. ACTUAL SIZES OF CUTOUTS AND OPENINGS IN STRUCTURAL SLABS AND WALLS SHALL PD Property Development Property Development
REFERENCE DRAWINGS GENERAL ARRANGEMENT DRAWING
10.
BE AS PER SEM DRAWINGS.
FOR FINISHES REFER FINISHES DRAWING SCHEDULE AND REPORT. STA Public Staircase Public Staircase DRAWING NUMBER DRAWING TITLE
GOOD FOR CONSTRUCTION
11. WATER TANKS AND SUMP PITS AS PER MEP DETAIL DRAWINGS. DDC101-DD-SGA-AR-DW-48703 SCHEDULE AND LEGEND IT IS CERTIFIED THAT THIS DOCUMENT HAS BEEN
12. FOR RAISED FLOOR STAIRCASE TREAD 300MM & RISER 150MM. DDC101-DD-SGA-AR-DW-48770 THIRD LEVEL PLAN
13. FOR EQUIPMENT LAYOUT REFER MEP DRAWINGS. DDC101-DD-SGA-AR-DW-48790 DOOR AND WINDOW SCHEDULE DESIGNED AND CHECKED IN ACCORDANCE WITH DDC DDC101-CHENNAI METRO PH-1 EXTENSION
DDC101-DD-SGA-AR-DW-48894 OPENING CUTOUT SCHEDULE QUALITY ASSURANCE PLAN WASHERMANPET TO WIMCO NAGAR

SYSTRA MVA CONSULTING (INDIA) PVT.LTD.


ELEVATED STATION -4
S220/X/XXXX/XXX/XXXX

B2 REFER REVISION LOG MCR SSA KAS 01-10-2020 CHENNAI METRO RAIL LTD. 5TH FLOOR, GURU ANGAD BHAWAN, MCR
THIRUVOTRIYUR THERADI METRO -STT (GOWRI ASHRAM-SGA)
B1 REFER REVISION LOG MCR SSA KAS 20-03-2020
ADMINISTRATIVE BUILDING, 71, NEHRU PLACE, NEW DELHI-110019 FOURTH FLOOR / LINKBRIDGE LEVEL PLAN
CMRL DEPOT, POONAMALLEE HIGH ROAD, PH: 26422844, 26413310 FAX: 26224204 SSA
B0 GFC SUBMISSION MCR SSA KAS 27-01-2020 KOYAMBEDU, CHENNAI - 600107 (INDIA)
SUBSIDIARY OF:
KAS AS SHOWN 09-08-2018 CONSTRUCTION REFERENCE DRAWING
A0 CRD SUBMISSION -FIRST ISSUE HCH SSA KAS 09-08-2018 SYSTRA S.A. - 72-76 RUE HENRY FARMAN 75015
PARIS, FRANCE
DDC101-DD-SGA-AR-DW-48710 B2