Geotechnical Investigation Report Summary
Geotechnical Investigation Report Summary
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Medium Sand in %
Coarse Sand in %
Type of Sampling
Plastic Limit In %
Fine Gravel in %
Liquid Limit In %
Fine Sand in %
Specific gravity
S.P.T N Value
( φ ) in degree
( 0.075mm To
Group of soil
0.002mm)
Void ratio
N0.
Silt in %
SL.
1 At. 0.5 m depth D.S 8.22 2.79 24.21 26.25 15.69 22.84 31 17 14 12.53 --- --- --- --- 2.69 --- 0 --- SC
2 At. 1.5 m depth S.P.T 0 0.53 6.11 26.60 25.54 41.22 32 17 15 13.52 1.860 1.638 --- --- 2.70 --- 20 N=11 CL
3 At. 3.0 m depth S.P.T 0 2.09 12.84 18.38 29.69 37.00 32 17 15 14.02 1.880 1.648 --- --- 2.70 --- 20 N=19 CL
4 At. 4.5 m depth S.P.T 4.11 1.69 11.22 19.55 28.88 34.55 32 18 14 15.20 1.890 1.640 --- --- 2.70 --- 20 N=23 CL
5 At. 6.0 m depth S.P.T 3.46 1.43 13.55 21.44 27.63 32.49 32 18 14 15.87 1.920 1.657 --- --- 2.71 --- 20 N=32 CL
6 At. 7.5 m depth S.P.T 2.44 3.76 14.58 19.96 20.12 39.14 30 16 14 16.02 1.940 1.672 --- --- 2.1 --- 20 N=36 CL
7 At. 9.0 m depth S.P.T 0 4.39 2.51 17.44 29.95 45.71 40 20 20 16.22 1.952 1.679 --- --- 2.72 --- 30 N=37 CI
8 At. 10.5 m depth S.P.T 0 3.44 4.40 27.22 28.63 36.31 32 17 15 17.23 1.975 1.684 --- --- 2.71 --- 20 N=40 CL
9 At. 12.0 m depth S.P.T 0 2.14 21.39 26.04 19.56 30.87 30 16 14 17.42 2.01 1.711 --- --- 2.71 --- 10 N>100 CL
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Contd......
BR. NO.-784, BH-1(AB-2) :-
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, Pt. XI / Pt. XIII) AND IS:1498-1970
Grain size analysis Hydrometer Atterberg’s Limits
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Angle of shearing
(4.75mm To 2.00
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( 0.075mm To
(0.425mm To
Group of soil
(2.0mm To
resistance
0.425mm)
0.001mm)
Clay in %
Void ratio
N0.
Silt in %
mm)
SL.
%
From 12.30 m to
10 CORE ROCK STRATA, CORE RECOVERY=8% & RQD=0% N>100 ---
13.5 m depth
From 13.5 m to
11 CORE ROCK STRATA, CORE RECOVERY=6.66% & RQD=0% N>100 ---
15.0 m depth
From 15.0 m to
12 CORE ROCK STRATA, CORE RECOVERY=10% & RQD=0% N>100 ---
16.5 m depth
From 16.5 m to
13 CORE ROCK STRATA, CORE RECOVERY=6.66% & RQD=0% N>100 ---
18.0 m depth
From 18.5 m to
14 CORE ROCK STRATA, CORE RECOVERY=60% & RQD=15% --- ---
19.5 m depth
From 19.5 m to
15 CORE ROCK STRATA, CORE RECOVERY=53% & RQD=40% --- ---
20.5 m depth
From 20.5 m to
16 CORE ROCK STRATA, CORE RECOVERY=55% & RQD=50% --- ---
21.5 m depth
From 21.5 m to
17 CORE ROCK STRATA, CORE RECOVERY=60% & RQD=55% --- ---
22.5 m depth
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, Pt. XI / Pt. XIII) AND IS:1498-1970
Grain size analysis Hydrometer Atterberg’s Limits
analysis
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( φ ) in degree
( 0.075mm To
Group of soil
0.002mm)
Clay in %
Void ratio
N0.
Silt in %
SL.
1 At. 0.5 m depth D.S 0 0.20 26.67 48.92 24.21 21 --- NP 9.22 --- --- --- --- 2.67 --- 0 --- SM
2 At. 1.5 m depth S.P.T 1.99 4.52 77.73 15.70 0.06 17 --- NP 9.57 1.760 1.606 --- --- 2.64 --- 0 N=14 SP
3 At. 3.0 m depth S.P.T 0 1.54 2.01 25.42 25.55 45.48 40 20 20 15.33 1.921 1.665 --- --- 2.70 --- 30 N=17 CI
4 At. 4.5 m depth S.P.T 1.22 2.64 13.12 16.03 29.66 37.33 40 21 19 16.10 1.954 1.683 --- --- 2.70 --- 30 N=21 CI
5 At. 6.0 m depth S.P.T 9.10 4.92 80.12 3.02 2.84 18 --- NP 9.45 1.815 1.658 --- --- 2.65 --- 0 N=27 SP
6 At. 7.5 m depth S.P.T 0.19 0 47.98 49.72 2.11 18 --- NP 9.30 1.860 1.701 --- --- 2.64 --- 0 N=42 SP
From 8.0 m to
7 CORE ROCK STRATA, CORE RECOVERY=10% & RQD=0% N>100 ---
9.0 m depth
From 9.0 m to
8 CORE ROCK STRATA, CORE RECOVERY=8.66% & RQD=0% N>100 ---
10.5 m depth
Contd......
BR. NO.-784, BH-2(P-6) :-
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, Pt. XI / Pt. XIII) AND IS:1498-1970
Grain size analysis Hydrometer Atterberg’s Limits
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Angle of shearing
(4.75mm To 2.00
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( 0.075mm To
(0.425mm To
Group of soil
(2.0mm To
resistance
0.425mm)
0.002mm)
Clay in %
Void ratio
N0.
Silt in %
mm)
SL.
%
From 11.0 m to
10 CORE ROCK STRATA, CORE RECOVERY=45% & RQD=12% --- ---
12.0 m depth
From 12.0 m to
11 CORE ROCK STRATA, CORE RECOVERY=50% & RQD=20% --- ---
13.0 m depth
From 13.0 m to
12 CORE ROCK STRATA, CORE RECOVERY=55% & RQD=50% --- ---
14.0 m depth
From 14.0 m to
13 CORE ROCK STRATA, CORE RECOVERY=60% & RQD=30% --- ---
15.0 m depth
From 15.0 m to
14 CORE ROCK STRATA, CORE RECOVERY=70% & RQD=50% --- ---
16.0 m depth
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( φ ) in degree
( 0.075mm To
Group of soil
0.002mm)
Clay in %
Void ratio
N0.
Silt in %
SL.
1 At. 0.5 m depth D.S 5.53 15.54 72.43 6.05 0.45 17 --- NP 9.55 --- --- --- --- 2.64 --- 0 --- SP
2 At. 1.5 m depth S.P.T 8.74 11.91 68.07 10.76 0.52 17 --- NP 9.45 1.775 1.620 --- --- 2.64 --- 0 N=18 SP
3 At. 3.0 m depth S.P.T 6.66 12.44 69.09 11.01 0.80 18 --- NP 9.25 1.786 1.634 --- --- 2.66 --- 0 N=20 SP
4 At. 4.5 m depth S.P.T 0 0 39.22 47.26 13.52 19 --- NP 8.55 1.832 1.687 --- --- 2.68 --- 0 N=38 SM
5 At. 6.0 m depth S.P.T 0 0.43 18.89 62.99 17.69 20 --- NP 8.45 1.884 1.737 --- --- 2.68 --- 0 N=46 SM
6 At. 7.5 m depth S.P.T 0 0.12 20.00 56.70 23.18 21 --- NP 8.23 1.920 1.773 --- --- 2.67 --- 0 N=55 SM
From 8.0 m to
7 CORE ROCK STRATA, CORE RECOVERY=10% & RQD=0% N>100 ---
9.0 m depth
From 9.0 m to
8 CORE ROCK STRATA, CORE RECOVERY=50% & RQD=32% --- ---
10.0 m depth
Contd......
BR. NO.-784, BH-3(P-5) :-
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, Pt. XI / Pt. XIII) AND IS:1498-1970
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Angle of shearing
(4.75mm To 2.00
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( 0.075mm To
(0.425mm To
Group of soil
(2.0mm To
resistance
0.425mm)
0.002mm)
Clay in %
Void ratio
N0.
Silt in %
mm)
SL.
%
From 10.0 m to
09 CORE ROCK STRATA, CORE RECOVERY=56% & RQD=20% --- ---
11.0 m depth
From 11.0 m to
10 CORE ROCK STRATA, CORE RECOVERY=62% & RQD=55% --- ---
12.0 m depth
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( φ ) in degree
( 0.075mm To
Group of soil
0.001mm)
Clay in %
Void ratio
N0.
Silt in %
SL.
1 At. 0.5 m depth D.S 10.61 10.69 68.52 9.09 1.09 17 --- NP 9.60 --- --- --- --- 2.64 --- 0 --- SP
2 At. 1.5 m depth S.P.T 14.44 9.73 65.99 8.96 0.88 17 --- NP 10.50 1.750 1.583 --- --- 2.65 --- 0 N=11 SP
3 At. 3.0 m depth S.P.T 13.75 11.54 65.68 8.06 0.97 18 --- NP 10.61 1.780 1.609 --- --- 2.64 --- 0 N=18 SP
4 At. 4.5 m depth S.P.T 10.61 8.65 69.75 10.03 0.96 18 --- NP 9.30 1.820 1.665 --- --- 2.65 --- 0 N=36 SP
5 At. 6.0 m depth S.P.T 3.79 12.97 72.94 9.62 0.68 18 --- NP 9.63 1.892 1.725 --- --- 2.65 --- 0 N=46 SP
6 At. 7.0 m depth S.P.T 0 1.42 82.92 12.82 2.84 19 --- NP 9.86 1.930 1.756 --- --- 2.65 --- 0 N>100 SP
From 7.5 m to
7 CORE ROCK STRATA, CORE RECOVERY=60% & RQD=30% --- ---
8.5 m depth
From 8.5 m to
8 CORE ROCK STRATA, CORE RECOVERY=70% & RQD=40% --- ---
9.5 m depth
Contd......
BR. NO.-784, BH-4 (P-3) :-
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, Pt. XI / Pt. XIII) AND IS:1498-1970
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Bulk density in gm/cc.
( less than 0.002mm)
Type of soil collected
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Angle of shearing
(4.75mm To 2.00
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( 0.075mm To
(0.425mm To
Group of soil
(2.0mm To
resistance
0.425mm)
0.001mm)
DFS in %
Clay in %
Void ratio
N0.
Silt in %
mm)
SL.
%
From 9.5 m to
10 CORE ROCK STRATA, CORE RECOVERY=63% & RQD=45% --- ---
10.5 m depth
From 10.5 m to
11 CORE ROCK STRATA, CORE RECOVERY=85% & RQD=83% --- ---
11.5 m depth
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
(4.75mm To 2.00 mm)
( 0.075mm To 0.002
Sample Collected at
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( φ ) in degree
Group of soil
Clay in %
Void ratio
N0.
Silt in %
mm)
SL.
1 At. 0.5 m depth D.S 3.01 4.27 82.17 6.00 4.55 18 --- NP 9.27 --- --- --- --- 2.64 --- 0 --- SP
2 At. 1.5 m depth S.P.T 1.96 5.23 86.48 5.18 1.15 17 --- NP 9.88 1.765 1.606 --- --- 2.64 --- 0 N=16 SP
3 At. 3.0 m depth S.P.T 3.67 4.29 83.49 7.55 1.00 17 --- NP 10.11 1.782 1.618 --- --- 2.65 --- 0 N=21 SP
4 At. 4.5 m depth S.P.T 5.60 6.07 80.19 7.53 0.61 17 --- NP 10.36 1.792 1.623 --- --- 2.65 --- 0 N=26 SP
5 At. 6.0 m depth S.P.T 6.01 4.21 81.81 7.57 0.40 18 --- NP 10.55 1.832 1.657 --- --- 2.66 --- 0 N=33 SP
6 At. 7.5 m depth S.P.T 3.06 5.78 84.21 6.58 0.37 19 --- NP 11.01 1.936 1.743 --- --- 2.64 --- 0 N>100 SP
From 8.0 m to
7 CORE ROCK STRATA, CORE RECOVERY=63% & RQD=50% --- ---
9.0 m depth
From 9.0 m to
8 CORE ROCK STRATA, CORE RECOVERY=58% & RQD=45% --- ---
10.0 m depth
Contd......
BR. NO.-784, BH-5(P-2) :-
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, Pt. XI / Pt. XIII) AND IS:1498-1970
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Bulk density in gm/cc.
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Angle of shearing
(4.75mm To 2.00
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( 0.075mm To
(0.425mm To
Group of soil
(2.0mm To
resistance
0.425mm)
0.002mm)
Clay in %
Void ratio
N0.
Silt in %
mm)
SL.
%
From 10.0 m to
10 11.0 m depth
CORE ROCK STRATA, CORE RECOVERY=65% & RQD=62% --- ---
From 11.0 m to
11 12.0 m depth
CORE ROCK STRATA, CORE RECOVERY=80% & RQD=75% --- ---
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Type of Sampling
Coarse Sand in %
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( φ ) in degree
( 0.075mm To
Group of soil
0.002mm)
Clay in %
Void ratio
N0.
Silt in %
SL.
1 At. 0.5 m depth D.S 1.06 6.32 83.09 7.72 1.81 18 --- NP 9.10 --- --- --- --- 2.64 --- 0 --- SP
2 At. 1.5 m depth S.P.T 3.22 5.32 85.55 5.30 0.61 17 --- NP 9.32 1.755 1.603 --- --- 2.64 --- 0 N=12 SP
3 At. 3.0 m depth S.P.T 3.51 6.41 84.45 4.31 1.32 18 --- NP 9.52 1.780 1.625 --- --- 2.65 --- 0 N=19 SP
4 At. 4.5 m depth S.P.T 3.67 4.29 83.49 7.55 1.00 18 --- NP 10.10 1.790 1.625 --- --- 2.65 --- 0 N=23 SP
5 At. 6.0 m depth S.P.T 3.97 2.68 72.85 18.93 1.57 18 --- NP 10.85 1.823 1.644 --- --- 2.66 --- 0 N=33 SP
6 At. 7.5 m depth S.P.T 0 1.67 91.64 5.64 1.05 19 --- NP 11.22 1.864 1.675 --- --- 2.64 --- 0 N=41 SP
7 At. 9.0 m depth S.P.T 5.73 3.97 67.20 22.17 0.93 17 --- NP 11.79 1.930 1.726 --- --- 2.64 --- 0 N=52 SP
From 9.5 m to
8 CORE ROCK STRATA, CORE RECOVERY=51% & RQD=40% --- ---
10.5 m depth
Contd......
BR. NO.-784, BH-6(P-1) :-
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, Pt. XI / Pt. XIII) AND IS:1498-1970
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( φ ) in degree
Group of soil
Clay in %
Void ratio
N0.
Silt in %
SL.
From 10.5 m to
9 CORE ROCK STRATA, CORE RECOVERY=58% & RQD=42% --- ---
11.5 m depth
From 11.5 m to
10 CORE ROCK STRATA, CORE RECOVERY=65% & RQD=50%. --- ---
12.5 m depth
From 12.5 m to
11 CORE ROCK STRATA, CORE RECOVERY=70% & RQD=65%. --- ---
13.5 m depth
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Type of Sampling
Coarse Sand in %
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( φ ) in degree
( 0.075mm To
Group of soil
0.002mm)
Clay in %
Void ratio
N0.
Silt in %
SL.
1 At. 0.5 m depth D.S 2.10 3.34 78.63 12.41 3.52 18 --- NP 8.26 --- --- --- --- 2.64 --- 0 --- SP
2 At. 1.5 m depth S.P.T 1.22 2.75 80.21 11.26 4.56 18 --- NP 8.97 1.738 1.594 --- --- 2.64 --- 0 N=06 SP
3 At. 3.0 m depth S.P.T 0.75 2.63 82.15 6.21 8.26 19 --- NP 9.85 1.745 1.588 --- --- 2.65 --- 0 N=11 SP-SM
4 At. 4.5 m depth S.P.T 0.52 2.10 80.55 6.98 9.85 19 --- NP 10.12 1.768 1.605 --- --- 2.65 --- 0 N=15 SP-SM
5 At. 6.0 m depth S.P.T 0.18 2.52 85.10 0.78 11.42 20 --- NP 10.49 1.815 1.642 --- --- 2.65 --- 0 N=26 SP-SM
From 7.0 m to
6 CORE ROCK STRATA, CORE RECOVERY=20% & RQD=0% ----
8.0 m depth
From 8.0 m to
7 CORE ROCK STRATA, CORE RECOVERY=20% & RQD=16% ----
9.0 m depth
From 9.0 m to
8 CORE ROCK STRATA, CORE RECOVERY=35% & RQD=20% ----
10.0 m depth
Contd......
BR. NO.-784, BH-8(P-4) :-
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, Pt. XI / Pt. XIII) AND IS:1498-1970
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Angle of shearing
(4.75mm To 2.00
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( 0.075mm To
(0.425mm To
Group of soil
(2.0mm To
resistance
0.425mm)
0.001mm)
Clay in %
Void ratio
N0.
Silt in %
mm)
SL.
%
From 10.0 m to
09 CORE ROCK STRATA, CORE RECOVERY=37% & RQD=34% ---
11.0 m depth
From 11.0 m to
10 CORE ROCK STRATA, CORE RECOVERY=42% & RQD=37% ---
12.0 m depth
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Type of Sampling
Coarse Sand in %
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( φ ) in degree
( 0.075mm To
Group of soil
0.001mm)
Clay in %
Void ratio
N0.
Silt in %
SL.
1 At. 0.5 m depth D.S 4.34 1.52 10.50 26.44 22.63 34.57 30 16 14 13.21 --- --- --- --- 2.70 --- 20 ---- CL
2 At. 1.5 m depth S.P.T 3.89 1.18 7.52 30.47 21.54 35.40 32 17 15 14.23 1.858 1.626 --- --- 2.70 --- 10 N=11 CL
3 At. 3.0 m depth S.P.T 0 0.16 5.55 39.69 22.30 32.30 31 17 14 14.59 1.876 1.637 --- --- 2.70 --- 10 N=18 CL
4 At. 4.5 m depth S.P.T 7.57 0.98 5.85 26.15 21.44 38.01 32 17 15 15.63 1.925 1.664 --- --- 2.71 --- 10 N=27 CL
5 At. 6.0 m depth S.P.T 0 0 69.42 30.49 0.09 17 --- NP 9.20 1.820 1.666 --- --- 2.64 --- 0 N=32 SP
6 At. 7.5 m depth S.P.T 0 0 72.94 26.91 0.15 17 --- NP 10.78 1.842 1.662 --- --- 2.64 --- 0 N=41 SP
7 At. 9.0 m depth S.P.T 0 0 79.91 19.81 0.28 18 --- NP 9.99 1.920 1.747 --- --- 2.65 --- 0 N=78 SP
8 At. 10.5 m depth S.P.T 0 0 69.24 29.70 1.06 18 --- NP 9.89 1.950 1.774 --- --- 2.65 --- 0 N>100 SP
9 At. 12.0 m depth S.P.T 0 0 71.24 26.09 2.67 19 --- NP 9.78 --- --- --- --- 2.65 --- 0 N>100 NOTE*
Contd......
BR. NO.-784, BH-7(AB-1) :-
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project
Consultant: Geotechnical Investigation Report Client :
Job No.: 87
Chief Project Manager/II, Rail Vikash Nigam
BHUBANESWA DOC. No.: SMC/1902 Limited, Visakhapatnam
TEST CONDUCTED AS PER IS: 2720 (Pt. I, Pt. II, Pt. III, Pt. IV, Pt. V, Pt. XI / Pt. XIII) AND IS:1498-1970
Grain size analysis Hydrometer Atterberg’s Limits
Cohesion ( C ) Kgf/cm2
Plastic Limit In %
Medium Sand in %
Liquid Limit In %
Coarse Sand in %
Type of Sampling
Angle of shearing
(4.75mm To 2.00
Fine Gravel in %
Fine Sand in %
Specific gravity
S.P.T N Value
( 0.075mm To
(0.425mm To
Group of soil
(2.0mm To
resistance
0.425mm)
0.001mm)
Clay in %
Void ratio
N0.
Silt in %
mm)
SL.
%
10 At. 13.5 m depth S.P.T 0 0.54 68.96 30.00 0.50 18 --- NP 9.55 --- --- --- --- 2.64 --- 0 N>100 NOTE*
From 14.0 m to
11 CORE ROCK STRATA, CORE RECOVERY=10% & RQD=0% N>100 ---
15.0 m depth
From 15.0 m to
12 CORE ROCK STRATA, CORE RECOVERY=8% & RQD=0% N>100 ---
16.5 m depth
From 17.0 m to
13 CORE ROCK STRATA, CORE RECOVERY=56% & RQD=42% --- ---
18.0 m depth
From 18.0 m to
14 CORE ROCK STRATA, CORE RECOVERY=50% & RQD=30% --- ---
19.0 m depth
From 19.0 m to
15 CORE ROCK STRATA, CORE RECOVERY=53% & RQD=0% --- ---
20.0 m depth
From 20.0 m to
16 CORE ROCK STRATA, CORE RECOVERY=40% & RQD=30% --- ---
21.0 m depth
From 21.0 m to
17 CORE ROCK STRATA, CORE RECOVERY=85% & RQD=30% --- ---
22.0 m depth
From 22.0 m to
18 CORE ROCK STRATA, CORE RECOVERY=76% & RQD=70% --- ---
23.0 m depth
NOTE*-From 12.0 m to 14.0 m depth, a highly weathered sand stone stratum exists from which core samples couldn’t be collected only washed out samples have
been collected.
Name of Project: Geotechnical Investigation including soil exploration and submission of bore log data and standard Test reports, Preparation &
obtaining approval of GAD including Design of structural details with proof check by IIT/NIT/Govt. Universities for Major Bridges and
preparation & obtaining approval of GAD for Minor Bridges of suit 25 T Axle loads in the section between Jimidipeta- Vizianagram of
East Coast Railway in connection with TIG-VZM 3rd line Project