0% found this document useful (0 votes)
28 views1 page

KTMD Project Linear Progress Report

The KTMD Project shows progress across various components, with the Weir and Silt Excluder completed at 100%. The Feeder Tunnel is at 40% completion, while the Headraise Channel is at 98%. Overall, the project is advancing with notable completion percentages in several areas, including the Power House at 97%.

Uploaded by

Raheel Shahzad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views1 page

KTMD Project Linear Progress Report

The KTMD Project shows progress across various components, with the Weir and Silt Excluder completed at 100%. The Feeder Tunnel is at 40% completion, while the Headraise Channel is at 98%. Overall, the project is advancing with notable completion percentages in several areas, including the Power House at 97%.

Uploaded by

Raheel Shahzad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

KTMD Project Linear Progress

Sr. No Component Total Completed Balance Percentage Date Remarks

1 Weir 100

2 Silt Excluder 100


Northbound
3 Feeder Tunnel 40 Keitu weir to spera

4 Cut and Cover portion 2000 ft 100 total 2000 ft

5 Headraise Channel (HRC) 4 km 98

- HRC forebay 100

- HRC Spillway 100

6 Power house-4 (PH-4) 97% Civil Works

7 Speraragha (SRC) Canal+Strctr 11 km 71 2 strc under contsr