0% found this document useful (0 votes)
258 views43 pages

1 - CSD Eng & Const. - Company Profile

CSD Engineering and Construction, founded in 2010 by Engr. Chris Mark Salvador Dela Cruz, has evolved into a dynamic company specializing in various construction sectors including roads, bridges, and buildings. The company aims to provide cost-effective solutions and excellent customer service while adhering to high ethical standards. CSD is registered with the Philippine Government Electronic Procurement System and holds a regular contractor's license, ensuring compliance with industry regulations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
258 views43 pages

1 - CSD Eng & Const. - Company Profile

CSD Engineering and Construction, founded in 2010 by Engr. Chris Mark Salvador Dela Cruz, has evolved into a dynamic company specializing in various construction sectors including roads, bridges, and buildings. The company aims to provide cost-effective solutions and excellent customer service while adhering to high ethical standards. CSD is registered with the Philippine Government Electronic Procurement System and holds a regular contractor's license, ensuring compliance with industry regulations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Since its inception in October 8, 2010 with the establishment of CSD Engineering and

Construction, it has grown prominently for its significant projects through a humble beginning
of Engr. Chris Mark Salvador Dela Cruz who started as one-man venture.

The company has always embraced changes within the industry and thrived on innovation,
continuous improvement and best practice and it has developed into a dynamic and forward-
thinking business.

Vision

• To provide a cost-effective perimeter of work, excellent service and customer


satisfaction
• To be a preferred company to deal with due to the quality of the Company, Staff, and
Service

Mission

• Work ethics that rewards individuality, teamwork, honesty and integrity


• Quality of work
• Providing clients professional services by developing appropriate and effective
solutions to their needs within the right time frame and at a competitive and realistic
market related prices

CSD Engineering and Construction encompasses a diverse range of sectors in General


Building and Engineering which include:

• Roads
• Highway pavement and railways
• Airport
• Horizontal structures and bridges
• Irrigation and flood control
• Dam
• Reservoir
• Tunnelling
• Building and industrial plant
• Park, playground and recreational work

With CSD, the flexibility to handle the small project as well as the capability, capacity and
finance to manage large scheme offers the complete construction package from
construction, through to completion. “The total turnkey solution.”

Contact Details

Engr. Chris Mark S. Dela Cruz


Owner / Manager
Mobile: +(63) 917 574 4993
E-Mail Add: chrismarkiss@yahoo.com

Babalag West,
Municipality of Rizal,
Province of Kalinga 3808
Republic of the Philippines
Department of Budget and Management
PROCUREMENT SERVICE
CERTIFICATE OF PHILGEPS REGISTRATION
(Platinum Membership)

THIS IS TO CERTIFY THAT


CSD ENGINEERING AND CONSTRUCTION
PELAGIO ,
Peñablanca , Cagayan , Region II , Philippines

is registered in the Philippine Government Electronic Procurement System (PhilGEPS) on 06-Oct-2011


pursuant to Section 8.5.2 of the Revised Implementing Rules and Regulations of Republic Act No. 9184,
otherwise known as the Government Procurement Reform Act.
This further certifies that CSD ENGINEERING AND CONSTRUCTION has submitted the required eligibility
documents in the PhilGEPS Supplier Registry as listed in Annex A, which document is attached hereto and made
an integral part hereof.
For the purpose of updating this Certificate, all Class “A” eligibility documents covered by Section 8.5.2 of the
Revised Implementing Rules and Regulations of Republic Act No. 9184 supporting the veracity, authenticity and
validity of this Certificate shall remain current and updated. The failure by the prospective Bidder to update this
Certificate with the current and updated Class “A” eligibility documents shall result in the automatic suspension
of its validity until such time that all of the expired Class “A” eligibility documents has been updated.
By submitting this Certificate, the Bidder certifies:

1. the authenticity, genuineness, validity, and completeness of the copy of the original eligibility documents
submitted;
2. the veracity of the statements and information contained therein;
3. that the Certificate is not a guaranty that the named registrant will be declared eligible without first
being determined to be such for that particular bidding, nor is it an evidence that the Bidder has passed
the post-qualification stage; and
4. that any finding of concealment, falsification, or misrepresentation of any of the eligibility documents
submitted, or the contents thereof shall be a ground for disqualification from further participation in the
bidding process, without prejudice to the imposition of appropriate administrative, civil and criminal
penalty in accordance with the laws.

This Certificate is valid until 09-Sep-2025


Issued this 09th day of September 2024.
This is a system generated certificate. No signature is required.

Documentary Stamp Tax Paid Php 30.00


Certificate Reference No: 201110-44537-1156211283 Page 1 of 3
REMINDERS 1

The PhilGEPS office shall not determine the eligibility of merchants. The PhilGEPS office’s evaluation
of the eligibility requirements shall be for the sole purpose of determining the approval or disapproval
of the merchant’s application for registration.

A merchant’s registration and membership in the GOP-OMR is neither contract-specific nor


understood to be tantamount to a finding of eligibility. Neither shall the merchant’s successful
registration in the GOP-OMR be relied upon to claim eligibility for the purpose of participation in any
public bidding.

The determination of the eligibility of merchants, whether registered with the GOP-OMR or not, shall
remain with the Bids and Awards Committee (BAC). The BAC’s determination of validity of the
eligibility requirements shall be conclusive to enable the merchant to participate in the public bidding
process.

Certificate Reference No: 201110-44537-1156211283


Page 2 of 3
¹Refer to Section 4 of the Guidelines for the Use of the Government of the Philippines - Official Merchant's Registry
"Annex A"
List of Eligibility Documents
of
CSD ENGINEERING AND CONSTRUCTION
PELAGIO ,
Peñablanca , Cagayan , Region II , Philippines

DTI Certificate Number : 1697188


Issued By / Signatory : RAMON M LOPEZ
DTI Certificate Registration Date : 15-May-2020
Expiration Date : 09-Oct-2025
Expiration Date : 31-Dec-2024
Permit Number : 20240215190000327
Mayors Permit Place of Issue : PENABLANCA, CAGAYAN
Issued By / Signatory : LGU PENABLANCA, CAGAYAN / MAYOR
WASHINGTON M. TAGUINOD
Issuance Date : 18-Jan-2024
Expiration Date : 29-Aug-2025
TCC Number : 03-013-08-29-R1101-2024-M
Tax Clearance Issued By / Signatory : BIR / MARIA ARACELI C. GONZAGA
Issuance date : 29-Aug-2024
Date of Filing : 13-Apr-2024
Current Asset : 35,056,375.18
Audited Financial Statement Total Asset : 64,467,175.18
Current Liabilities : 0.00
Total Liabilities : 17,800,000.00
Name of Auditor : MA. BELEN BARIAS-LIM
BIR RDO Code : 013
Expiration Date : 25-Jul-2025
Issued By / Signatory : ERNI G. BAGGAO
PCAB License Issuance Date : 25-Jul-2023
License Number : 35282
License First Issue Date : 25-Jul-2011
Principal Classification : GENERAL ENGINEERING
Category : B

Certificate Reference No: 201110-44537-1156211283


Page 3 of 3

Powered by TCPDF (www.tcpdf.org)


Republic of the Philippines
DEPARTMENT OF TRADE & INDUSTRY
CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES
PHILIPPINE CONTRACTORS ACCREDITATION BOARD
Makati City, Metro Manila, Philippines

REGULAR CONTRACTOR’S LICENSE

FORM NUMBER: 47151 Contracting Fiscal Year (CFY): 2023/2025

This certifies that CONTRACTOR’S PARTICULAR


Authorized Managing Officer Signature NOT VALID
WITHOUT
CSD ENGINEERING AND Chris Mark Salvador Dela Cruz SIGNATURE
CONSTRUCTION Organization Type Head Office (Region)

Sole Proprietorship REGION 2 (Cagayan


Valley)
Taxpayer Identification Number (TIN)

942563691
LICENSE PARTICULARS
having complied with all the requirements for licensure License First Issue Date Contractor’s License Number
pursuant to Republic Act No. 4566 (as amended) and
its implementing rules and regulations, is hereby July 25, 2011 35282
authorized to engage in the construction contracting Validity Period of this License/Renewal
business in the Philippines, subject to herein July 01, 2023 to July 25, 2025
limitations of license validity period, classification and Principal Classification and Category
category as prescribed under License Particulars in
the box to the right and to the terms and conditions General Engineering B
annotated at the back hereof. Other Classification/s
General Building
ooooooooooooooooooooooooooo

REGISTRATION PARTICULARS
This further certifies that said licensee, subject to the Registration Date Registration Number
limitations of the above-prescribed license validity
period and registration validity period, kind/s of project June 08, 2023 2079-2023
and size range/s as indicated under Registration Validity Period of this Registration
Particulars in the box to the right hereof, is a PCAB June 08, 2023 to July 13, 2026
registered contractor for government projects. Kinds of Project and Respective Size Ranges

Road, Highway, Pavement, Railways, Airport Horizontal Medium A


Given at Metro Manila, Philippines, on Structures and Bridges
July 25, 2023 Irrigation and Flood Control Small B
Dam, Reservoir & Tunneling Medium A
Water Supply Small B
ERNI G. BAGGAO Port, Harbor and Offshore Engineering Small B
Board Member Building and Industrial Plant Medium A
Park, Playground and Recreational Work Small B
****************************************************************************************************************************

HERBERT D.G. MATIENZO SERGIE T. RETOME


Executive Director Board Secretary

DOCUMENTARY STAMP
TAX PAID (Php 30.00)

IMPORTANT NOTICE: Filing schedule for license renewal application – on or before April 27, 2025
TERMS AND CONDITIONS OF REGULAR LICENSE

1. The Licensee must observe and abide by the provisions of Republic Act No. 4566, as amended by
Presidential Decree No. 1746, its implementing Rules and Regulations, and other orders or instructions
which the Philippine Contractors Accreditation Board shall issue from time to time pursuant to its power
and authority under the law.
2. The License shall be valid during the contracting fiscal year it was issued provided it has not been
suspended, cancelled, or revoked by the Board.
3. The License must be renewed annually on or before the expiration of its validity; otherwise, the contractor
shall be deemed to be operating without a valid license.
4. The License is non-transferable.
5. The Licensee must not submit bids, sign construction contracts nor undertake construction projects after
his/its license has expired and before the same is renewed otherwise the contractor shall be meted the
appropriate disciplinary action and pay additional licensing fee in accordance with the existing schedule.
6. The Licensee's qualification is subject to review at any time to ascertain the contractor's eligibility to the
present classification and category of his license.
7. License category may be upgraded and other classification(s) may be added to the license only upon
formal application by the Licensee together with all the necessary supporting documents.
8. The Licensee must not undertake/implement construction projects which are not within the scope of the
license's classification otherwise may be imposed appropriate disciplinary action and payment of
additional licensing fee in accordance with the existing schedule.
9. The Licensee must immediately notify the Board in writing of the resignation or disassociation of its
Sustaining Technical Employee and must replace the said employee within a period of ninety (90) days
from the date of resignation or disassociation. Failure to notify the Board within 30 days from the date of
resignation of the Sustaining Technical Employee is a ground for immediate revision of the category and
classification(s) of the License.
10. Submission of falsified documents or any misrepresentation or false information in the application for a
license or renewal thereof shall subject the Licensee to administrative disciplinary action without
prejudice to the imposition of penal sanctions provided for by Law.
11. The Licensee must submit to the Board monitoring reports that may be required from time to time.
12. A Licensee who is retiring from the construction business must advise the Board in writing and must
immediately surrender the license to the Board for cancellation.
13. The Licensee must at all times observe and adhere to the letter and spirit of the Code of Ethics of
constructors.
14. The License is valid only when signed by the individual proprietor or the Authorized Managing Officer of
the Licensee.
15. The Licensee must employ only licensed subcontractors and/or specialty contractors.
16. The Licensee shall sub-contract only from a licensed contractor.
17. The Licensee shall only sub-contract from a licensed project owner undertaking by himself, a project for
commercial / industrial use.

CONSTRUCTORS’ CODE OF ETHICS

1. A constructor should be fair and honest in his business dealings, his practices and activities guided by
principles of justice and equity.
2. A constructor should conduct himself with honor and dignity in his relations with his fellow constructors,
fully aware that to speak maliciously of the work reputation or ability of a fellow constructor is highly
unethical, and should cooperate with them for the protection and advancement of the construction industry.
3. A constructor should undertake his construction contracting activities on high ethical level and deliver
quality service and faithful performance of the undertaking
PCABto which owner-clients are entitled.
4. A constructor should not advertise his firm's business in misleading terms and make false representations
which may not only be improper but also immoral.
5. A constructor should refrain from the unfair competition which is a disservice to the construction industry.
6. A constructor should be fair and just to his employees, consider their welfare with sympathy and
understanding.
7. A constructor should not attempt to supplant a fellow constructor who is in the employ of the owner or
prevent a constructor from undertaking that which the owner has engaged him to do as it is a practice
inconsistent with the honor and dignity of the construction contracting industry.
8. A constructor should hold himself dedicated to the proposition that the construction industry should be rid
of participants whose reputation, conduct and practices are inimical to the construction industry.

O.R. Date

Powered by TCPDF (www.tcpdf.org)


Purok 6, Pelagio St., Camasi, Peñablanca, Cagayan
TIN No.: 942-563-691-001
CP NO.: (0917) 574-4993;
E-mail: chrismarkiss@yahoo.com

ORGANIZATIONAL CHART
CHRIS MARK S. DELA CRUZ
AMO / PROJECT MANAGER

PAULINE TATIANA C. DELA CRUZ


PROJECT MANAGER

EDWARD MARTEL B. SALVADOR JOHN MARK T. LEONES ROLAND O. VILARAY DRA. MA. KENNETH D. TUPIÑO
LIAISON OFFICER SECRETARY SAFETY OFFICER HEALTH PERSONNEL

FERDINAND D. CIPRIANO FRANCIS B. GUMABAY


PROJECT ENGINEER ARCHITECT

JEFFREY P. BERNARDO VALENTINE PETER C. PAJDIO


PROJECT ENGINEER MATERIALS ENGINEER

JOHN S. COSTALES KINGSTON JAMES S. DELA CRUZ


ELECTRICAL ENGINEER SANITARY ENGINEER

IVAN WALLY M. RAMOS AMIEL R. SORIANO


SITE ENGINEER INTERIOR DESIGNER

CONSTRUCTION FOREMAN

SKILLED UNSKILLED EQUIPMENT


CARPENTERS FIRST AIDERS ELECTRICIANS DRYWALLERS
LABORERS LABORERS OPERATOR / DRIVER
STATEMENT OF ALL COMPLETED GOVERNMENT AND PRIVATE CONTRACTS

CONTRACT TOTAL CONTRACT VALUE PERCENTAGE OF


NO. NAME OF PROJECT PROCURING ENTITY NATURE OF WORK CONTRACT DATE CONTRACTORS ROLE DATE OF COMPLETION
DURATION AT COMPLETION (Php) ACCOMPLISHMENTS

GOVERNMENT

CONSTRUCTION OF 3-CLASSROOM BUILDING VERTICAL STRUCTURE -


DPWH-KALINGA DEO PLANNED : 100%
1 (PARTIAL) BUILDING – NEW JUNE 11, 2012 90 C.D SOLE CONTRACTOR AUGUST 15, 2012 641,956.40
BULANAO, TABUK CITY, KALINGA ACTUAL: 100%
RIZAL CENTRAL ES, RIZAL, KALINGA CONSTRUCTION

CIS RIZAL, KALINGA CANALIZATION WORKS NIA – KIMP - IMO VERTICAL STRUCTURE - PLANNED : 100%
2 JULY 16, 2012 120 C.D. SOLE CONTRACTOR SEPTEMBER 5, 2012 2,071,181.46
ANDARAYAN, SANTOR, RIZAL, KALINGA BULANAO, TABUK CITY, KALINGA CANALIZATION WORKS ACTUAL: 100%

UPGRADING (GRAVEL TO PAVED) OF RIZAL


DPWH-CAR ROADS – UPGRADING (GRAVEL PLANNED : 100%
3 NATIONAL ROAD, RIZAL, KALINGA JULY 09, 2012 90 C.D SOLE CONTRACTOR SEPTEMBER 18, 2012 9,409,639.89
ENGINEER’S HILL, BAGUIO CITY TO PAVED) - PCCP ACTUAL: 100%
K0522+327-K0528+928

CONSTRUCTION OF PRESCHOOL - VERTICAL STRUCTURE -


DEPED-CAR PLANNED : 100%
4 KINDERGARTEN SCHOOL BUILDING BUILDING – NEW JULY 02, 2012 90 C.D. SOLE CONTRACTOR SEPTEMBER 21, 2012 745,347.33
WANGAL, LA TRINIDAD, BENGUET ACTUAL: 100%
RIZAL CENTRAL ES, RIZAL, KALINGA CONSTRUCTION

CONSTRUCTION OF ONE STOREY ONE


CLASSROOM SCHOOL BUILDING (TYPE II) EACH VERTICAL STRUCTURE -
DEPED – DIVISION OF KALINGA, PLANNED : 100%
5 AT SAN VICENTE ELEM. SCHOOL AND RIZAL BUILDING – NEW AUGUST 06, 2012 90 C.D. SOLE CONTRACTOR OCTOBER 19, 2012 1,106,646.16
TABUK CITY ACTUAL: 100%
NATIONAL SCHOOL OF ARTS AND TRADES- CONSTRUCTION
SANTOR ANNEX

VERTICAL STRUCTURE -
PACKAGE IX-2012: CONSTRUCTION OF RIZAL DOH – CHD – CAR PLANNED : 100%
6 BUILDING – NEW AUGUST 06, 2012 120 C.D. SOLE CONTRACTOR NOVEMBER 16, 2012 2,187,610.60
RHU LIWAN WEST, RIZAL, KALINGA BGH COMPOUND, BAGUIO CITY ACTUAL: 100%
CONSTRUCTION

PACKAGE VI-2012: REPAIR-UPGRADING OF


DOH – CHD – CAR VERTICAL STRUCTURE PLANNED : 100%
7 JUAN DUYAN MEMORIAL DH, BABALAG WEST, AUGUST 13, 2012 120 C.D. SOLE CONTRACTOR NOVEMBER 16, 2012 1,908,880.59
BGH COMPOUND, BAGUIO CITY BUILDING - REPAIR ACTUAL: 100%
RIZAL, KALINGA

CONSTRUCTION OF MULTI-PURPOSE BUILDING


DPWH – CAGAYAN 3RD DEO, BUILDING-INDUSTRIAL PLANT – PLANNED : 100%
8 MUNICIPAL BUILDING, BRGY. CENTRO, MARCH 27, 2013 60 C.D. SOLE CONTRACTOR MAY 25, 2013 495,361.13
TUGUEGARAO CITY LOW RISE ACTUAL: 100%
AMULUNG, CAGAYAN

COMPLETION OF REGIONAL OFFICE NO. 02


VERTICAL STRUCTURE –
MULTI-PURPOSE BUILDING DPWH – REGIONAL OFFICE NO. 2 PLANNED : 100%
9 PARKING AREA AND AUGUST 14, 2013 60 C.D SOLE CONTRACTOR OCTOBER 13, 2013 2,993,663.60
REGIONAL GOVERNMENT CENTER, CARIG SUR, CARIG SUR, TUGUEGARAO CITY ACTUAL: 100%
BASKETBALL COURT
TUGUEGARAO CITY

1 of 10
STATEMENT OF ALL COMPLETED GOVERNMENT AND PRIVATE CONTRACTS

CONTRACT TOTAL CONTRACT VALUE PERCENTAGE OF


NO. NAME OF PROJECT PROCURING ENTITY NATURE OF WORK CONTRACT DATE CONTRACTORS ROLE DATE OF COMPLETION
DURATION AT COMPLETION (Php) ACCOMPLISHMENTS

COMPLETION OF ABBEG SMALL WATER


VERTICAL STRUCTURE - DAM & PLANNED : 100%
10 IMPOUNDING PROJECT ABBEG, FURAGUI, LGU – SOLANA, CAGAYAN SEPTEMBER 16, 2013 120 C.D SOLE CONTRACTOR DECEMBER 2, 2013 2,327,200.00
IRRIGATION WORKS ACTUAL: 100%
SOLANA, CAGAYAN

CONSTRUCTION OF WATER SANITATION


VERTICAL STRUCTURE – NEW PLANNED : 100%
11 FACILITIES AT CAGAYAN NHS, LINAO NHS, DPWH – CTDEO, TUGUEGARAO CITY OCTOBER 11, 2013 60 C.D SOLE CONTRACTOR DECEMBER 18, 2013 2,844,857.25
CONSTRUCTION ACTUAL: 100%
CATAGGAMAN NHS, TUGUEGARAO, CAGAYAN

CONSTRUCTION OF WATER SANITATION


DPWH – CAGAYAN 3RD DEO, BUILDING-INDUSTRIAL PLANT – PLANNED : 100%
12 FACILITIES (CLUSTERED, ALL OF TUGUEGARAO SEPTEMBER 22, 2013 60 C.D. SOLE CONTRACTOR DECEMBER 22, 2013 3,624,621.67
TUGUEGARAO CITY LOW RISE ACTUAL: 100%
CITY)

VERTICAL STRUCTURE –
CLUSTER 2: CONSTRUCTION OF WATER DPWH – KDEO BULANAO, TABUK PLANNED : 100%
13 BUILDING - NEW NOVEMBER 13, 2013 60 C.D. SOLE CONTRACTOR FEBRUARY 11, 2014 2,844,857.25
SANITATION FACILITIES, RIZAL, KALINGA CITY ACTUAL: 100%
CONSTRUCTION

DPWH – CAGAYAN 3RD DISTRICT


VERTICAL STRUCTURE PLANNED : 100%
14 TUAO MULTI-PURPOSE HALL, TUAO, CAGAYAN ENGINEERING OFFICE, TUGUEGARAO APRIL 02, 2014 120 C.D SOLE CONTRACTOR JULY 31, 2014 2,417,704.69
MULTI-PUSPOSE HALL ACTUAL: 100%
CITY

CONSTRUCTION OF 7M X 18M SCHOOL DPWH – KALINGA DISTRICT


VERTICAL STRUCTURE PLANNED : 100%
15 BUILDING, LIWAN WEST ELEMENTARY SCHOOL ENGINEERING OFFICE, JULY 19, 2014 90 C.D. SOLE CONTRACTOR SEPTEMBER 17, 2014 2,021,757.66
SCHOOL BUILDING ACTUAL: 100%
LIWAN WEST, RIZAL, KALINGA BULANAO, TABUK CITY

CONSTRUCTION OF 7M X 18M SCHOOL DPWH – KALINGA DISTRICT


VERTICAL STRUCTURE PLANNED : 100%
16 BUILDING, CALAOCAN ELEMENTARY SCHOOL ENGINEERING OFFICE, JULY 25, 2014 120 C.D SOLE CONTRACTOR OCTOBER 4, 2014 2,021,757.66
SCHOOL BUILDING ACTUAL: 100%
CALAOCAN, RIZAL, KALINGA BULANAO, TABUK CITY

DPWH – KALINGA DISTRICT


CONSTRUCTION OF SAN PASCUAL BRIDGE, HORIZONTAL STRUCTURE PLANNED : 100%
17 ENGINEERING OFFICE, JULY 28, 2014 180 C.D. SOLE CONTRACTOR DECEMBER 14, 2014 2,825,987.95
RIZAL, KALINGA BRIDGE ACTUAL: 100%
BULANAO, TABUK CITY

CONCRETING-IMPROVEMENT OF SAN QUINTIN DPWH – KALINGA DISTRICT


HORIZONTAL STRUCTURE PLANNED : 100%
18 FARM TO MARKET ROAD, SAN QUINTIN, RIZAL, ENGINEERING OFFICE, NOVEMBER 03, 2014 60 C.D. SOLE CONTRACTOR DECEMBER 19, 2014 1,926,278.44
ROADS ACTUAL: 100%
KALINGA BULANAO, TABUK CITY

2 of 10
STATEMENT OF ALL COMPLETED GOVERNMENT AND PRIVATE CONTRACTS

CONTRACT TOTAL CONTRACT VALUE PERCENTAGE OF


NO. NAME OF PROJECT PROCURING ENTITY NATURE OF WORK CONTRACT DATE CONTRACTORS ROLE DATE OF COMPLETION
DURATION AT COMPLETION (Php) ACCOMPLISHMENTS

14PH0004 LOCAL INFRA


DPWH – KALINGA DISTRICT
PROGRAMCONSTRUCTION OF ROAD 2.5KMS)- HORIZONTAL STRUCTURE PLANNED : 100%
19 ENGINEERING OFFICE, NOVEMBER 20, 2014 60 C.D. SOLE CONTRACTOR DECEMBER 27, 2014 1,823,487.80
CASSABANGNANSIBACAN, NAMBUCAYAN, ROADS ACTUAL: 100%
BULANAO, TABUK CITY
TABUK CITY, KALINGA

DPWH – KALINGA DISTRICT


14BD0033 REPAIR/MAINTENANCE OF NBI VERTICAL STRUCTURE PLANNED : 100%
20 ENGINEERING OFFICE, NOVEMBER 28, 2014 60 C.D. SOLE CONTRACTOR DECEMBER 28, 2014 197,017.83
BUILDING, CARIG SUR, TUGUEGARAO CITY BUILDING ACTUAL: 100%
BULANAO, TABUK CITY

13PH0108 PACKAGE 23: CONSTN OF HEALTH


DPWH – KALINGA DISTRICT
FACILITIES VERTICAL STRUCTURE PLANNED : 100%
21 ENGINEERING OFFICE, OCTOBER 15, 2014 90 C.D. SOLE CONTRACTOR JANUARY 13, 2015 2,622,241.67
A)NAMBARAB RHU, TABUK & EXPANSION OF SCHOOL BUILDING ACTUAL: 100%
BULANAO, TABUK CITY
TB DOTS, RIZAL

DPWH – CAGAYAN 3RD DISTRICT


CONSTRUCTION OF BARANGAY HEALTH VERTICAL STRUCTURE PLANNED : 100%
22 ENGINEERING OFFICE, TUGUEGARAO OCTOBER 21, 2014 90 C.D. SOLE CONTRACTOR JANUARY 19, 2015 1,454,018.16
STATION (BHS), PALCA, TUAO, CAGAYAN BUILDING ACTUAL: 100%
CITY

14BD0038 CONSTRUCTION OF BARANGAY DPWH – CAGAYAN 3RD DISTRICT


VERTICAL STRUCTURE PLANNED : 100%
23 HEALTH STATION (BHS), TAGGA, TUGUEGARAO ENGINEERING OFFICE, TUGUEGARAO OCTOBER 21, 2014 90 C.D. SOLE CONTRACTOR JANUARY 19, 2015 1,462,964.87
BUILDING ACTUAL: 100%
CITY CITY

DPWH – CAGAYAN 3RD DISTRICT


14BD0031 REPAIR/MAINT OF DPWH BLDG - VERTICAL STRUCTURE PLANNED : 100%
24 ENGINEERING OFFICE, TUGUEGARAO NOVEMBER 28, 2014 60 C.D. SOLE CONTRACTOR JANUARY 27, 2015 988,249.62
CTDEO, BAGAY ROAD, TUGUEGARAO CITY BUILDING ACTUAL: 100%
CITY

14B00013 RENOVATION OF OLD CASHIER


DPWH –REGION II OFFICE, VERTICAL STRUCTURE PLANNED : 100%
25 BUILDING FOR PMO OFFICE, SAN GABRIEL, OCTOBER 30, 2014 120 C.D. SOLE CONTRACTOR FEBRUARY 28, 2015 220,178.82
TUGUEGARAO CITY BUILDING ACTUAL: 100%
TUGUEGARAO CITY

14PH0083 REPAIR AND MAINTENANCE OF DPWH – KALINGA DISTRICT


HORIZONTAL STRUCTURE – PLANNED : 100%
26 FLOOD CONTROL & DRAINAGE STRUCTURES, ENGINEERING OFFICE, JANUARY 06, 2015 90 C.D. SOLE CONTRACTOR MARCH 07, 2015 979,002.34
FLOOD CONTROL ACTUAL: 100%
CALAOCAN-LIWAN EAST DRAINAGE ALONG KA BULANAO, TABUK CITY

DPWH – KALINGA DISTRICT


15PL0018 LIP - CONST OF TWO (2) CL BUILDING VERTICAL STRUCTURE PLANNED : 100%
27 ENGINEERING OFFICE, MAY 08, 2015 60 C.D. SOLE CONTRACTOR JUNE 22, 2015 1,978,261.81
WITH CR, RIZAL, KALINGA BUILDING ACTUAL: 100%
BULANAO, TABUK CITY

15B00012 CONCRETING OF CULLUNG FARM-TO DPWH – REGIONAL OFFICE 2, RGC,


HORIZONTAL STRUCTURE – PLANNED : 100%
28 MARKET RD. TUAO, CAGAYAN, STA 0+000-STA CARIG SUR, TUGUEGARAO CITY, JUNE 03, 2015 60 C.D. SOLE CONTRACTOR JULY 10, 2015 1,891,746.37
ROAD ACTUAL: 100%
0+241.663, BRGY. CULLUNG, TUAO CAGAYAN

3 of 10
STATEMENT OF ALL COMPLETED GOVERNMENT AND PRIVATE CONTRACTS

CONTRACT TOTAL CONTRACT VALUE PERCENTAGE OF


NO. NAME OF PROJECT PROCURING ENTITY NATURE OF WORK CONTRACT DATE CONTRACTORS ROLE DATE OF COMPLETION
DURATION AT COMPLETION (Php) ACCOMPLISHMENTS

15B00013 CONCRETING OF PATA FARM-TO- DPWH – REGIONAL OFFICE 2, RGC,


HORIZONTAL STRUCTURE – PLANNED : 100%
29 MARKET RD. TUAO, CAGAYAN, STA0+000- CARIG SUR, TUGUEGARAO CITY, JUNE 03, 2015 60 C.D. SOLE CONTRACTOR JULY 10, 2015 3,080,008.44
ROAD ACTUAL: 100%
STA 0+410, BRGY. PATA, TUAO, CAGAYAN CAGAYAN

14BD0129 CONSTRUCTION OF FLOOD CONTROL DPWH – CAGAYAN 3RD DISTRICT


HORIZONTAL STRUCTURE – PLANNED : 100%
30 SYSTEM(GABION), BRGY.BARANCUAG,TUAO, ENGINEERING OFFICE, TUGUEGARAO APRIL 21, 2015 90 C.D. SOLE CONTRACTOR JULY 20, 2015 2,848,343.47
FLOOD CONTROL ACTUAL: 100%
CAGAYAN CITY

15B00011 CONCRETING OF BAGUMBAYAN DPWH – REGIONAL OFFICE 2, RGC,


HORIZONTAL STRUCTURE – PLANNED : 100%
31 FARM-TOMARKET RD. TUAO CAGAYAN, STA CARIG SUR, TUGUEGARAO CITY, JUNE 03, 2015 120 C.D SOLE CONTRACTOR OCTOBER 02, 2015 6,700,795.29
ROAD ACTUAL: 100%
0+000-STA 0+507.80, STA 0+000-STA 0+57 CAGAYAN

15PL0131 CONSTRUCTION OF TWO(2)-CL, 1STY


DPWH – LOWER KALINGA DISTRICT VERTICAL STRUCTURE PLANNED : 100%
32 SCHOOL BLDG., WITH ATTACHED COMFORT DECEMBER 16, 2015 90 C.D SOLE CONTRACTOR MARCH 15, 2016 2,097,261.81
ENGINEERING OFFICE SCHOOL BUILDING ACTUAL: 100%
ROOM, MACUTAY ES, RIZAL, KALINGA

15PL0079 CONSTRUCTION OF SCHOOL


BUILDING 2- STRY.6 CLASSROOM, MACUTAY- DPWH – LOWER KALINGA DISTRICT VERTICAL STRUCTURE PLANNED : 100%
33 DECEMBER 04, 2015 150 C.D SOLE CONTRACTOR MAY 02, 2016 8,592,552.40
PALAO NATIONAL HIGH SCHOOL LIWAN RIZAL, ENGINEERING OFFICE SCHOOL BUILDING ACTUAL: 100%
KALINGA

15PL0170 COMPLETION OF SPRING REST DPWH – LOWER KALINGA DISTRICT VERTICAL STRUCTURE - PLANNED : 100%
34 JANUARY 07, 2016 120 C.D SOLE CONTRACTOR MAY 06, 2016 974,599.06
AREA/FIELD OFFICE ENGINEERING OFFICE BUILDING ACTUAL: 100%

KALINGA APAYAO STATE COLLEGE-


CONSTRUCTION OF RIZAL CAMPUS LIBRARY VERTICAL STRUCTURE PLANNED : 100%
35 RIZAL CAMPUS, MARCH 13, 2014 360 C.D. SOLE CONTRACTOR AUGUST 23, 2016 6,969,643.62
BUILDING PHASE IV SCHOOL BUILDING ACTUAL: 100%
BULANAO, TABUK CITY

LOCAL INFRASTRUCTURE PROGRAM – DPWH – KALINGA DISTRICT


HORIZONTAL STRUCTURE – PLANNED : 100%
36 REPLACENENT OF BULO BRIDGE, RIZAL, ENGINEERING OFFICE, APRIL 04, 2016 120 C.D SOLE CONTRACTOR AUGUST 23, 2016 4,723,769.65
BRIDGE ACTUAL: 100%
KALINGA BULANAO, TABUK CITY

17B00043 PROPOSED CONSTRUCTION OF


BUREAU OF LOCAL GOVERNMENT FINANCE DPWH – REGIONAL OFFICE 2, RGC,
VERTICAL STRUCTURE - PLANNED : 100%
37 (BLGF) PERIMETER FENCE AND GATE, REGIONAL CARIG SUR, TUGUEGARAO CITY, MAY 08, 2017 60 C.D. SOLE CONTRACTOR JUNE 25, 2017 1,084,601.76
BUILDING ACTUAL: 100%
GOVERNMENT CENTER, CARIG SUR, CAGAYAN
TUGUEGARAO CITY, PROVINCE OF CAGAYAN

4 of 10
STATEMENT OF ALL COMPLETED GOVERNMENT AND PRIVATE CONTRACTS

CONTRACT TOTAL CONTRACT VALUE PERCENTAGE OF


NO. NAME OF PROJECT PROCURING ENTITY NATURE OF WORK CONTRACT DATE CONTRACTORS ROLE DATE OF COMPLETION
DURATION AT COMPLETION (Php) ACCOMPLISHMENTS

FY 2016 DEPED SCHOOL BUILDING PROGRAM,


BATCH CONSTRUCTION OF SENIOR HIGH DPWH -
VERTICAL STRUCTURE - PLANNED : 100%
38 SCHOOL CLASSROOM – GOV. BENJAMIN APAYAO FIRST DISTRICT MAY 04, 2017 150 C.D. SOLE CONTRACTOR SEPTEMBER 21, 2017 8,086,797.04
SCHOOL BUILDING ACTUAL: 100%
LEGUIAB SR. MEM. NHS-MAIN, CONNER ENGINEERING OFFICE ,APAYAO
APAYAO

DPWH – REGIONAL OFFICE 2, RGC,


17B00051 REPAIR/MAINTENANCE OF PRC VERTICAL STRUCTURE - PLANNED : 100%
39 CARIG SUR, TUGUEGARAO CITY, JULY 26, 2017 120 C.D. SOLE CONTRACTOR OCTOBER 24, 2017 980,977.60
BUILDING, CARIG, TUGUEGARAO CITY BUILDING ACTUAL: 100%
CAGAYAN

17B00053 REPAIR MAINTENANCE OF VARIOUS


DPWH BUILDINGS (OLD SUPPLY OFFICE/GUARD DPWH – REGIONAL OFFICE 2, RGC,
VERTICAL STRUCTURE - PLANNED : 100%
40 HOUSE/GUEST HOUSE, CFMD OLD BUILDING, CARIG SUR, TUGUEGARAO CITY, SEPTEMBER 01, 2017 60 C.D. SOLE CONTRACTOR OCTOBER 31, 2017 992,971.31
BUILDING ACTUAL: 100%
OLD CASHIER OFFICE), NURSERY COMPOUND, CAGAYAN
SAN GABRIEL, TUGUEGARAO CITY

17B00055 REPAIR/MAINTENANCE OF GENDER DPWH – REGIONAL OFFICE 2, RGC,


VERTICAL STRUCTURE - PLANNED : 100%
41 BLDG., NURSERY COMPOUND, SAN GABRIEL, CARIG SUR, TUGUEGARAO CITY, SEPTEMBER 25, 2017 60 C.D. SOLE CONTRACTOR NOVEMBER 24, 2017 285,995.92
BUILDING ACTUAL: 100%
TUGUEGARAO CITY CAGAYAN

17B00044 PROPOSED CONST'N OF ONE(1) DPWH – REGIONAL OFFICE 2, RGC,


VERTICAL STRUCTURE - PLANNED : 100%
42 STOREY OFFICE BLDG., NAT'L LABOR RELATIONS CARIG SUR, TUGUEGARAO CITY, JULY 04, 2017 150 C.D. SOLE CONTRACTOR DECEMBER 01, 2017 5,386,844.70
BUILDING ACTUAL: 100%
COMMISSION REG'L ARBITRATION , NLRC CAGAYAN

17B00054 REPAIR/MAINTENANCE OF REG'L DPWH – REGIONAL OFFICE 2, RGC,


VERTICAL STRUCTURE - PLANNED : 100%
43 OFFICE BLDG. & PARKING LOT, DPWH REG'L CARIG SUR, TUGUEGARAO CITY, SEPTEMBER 13, 2017 120 C.D. SOLE CONTRACTOR JANUARY 01, 2018 3,458,137.89
BUILDING ACTUAL: 100%
OFFICE 02, CARIG SUR, TUGUEGARAO CAGAYAN

17B00057 REPAIR/MAINTENANCE OF
DPWH – REGIONAL OFFICE 2, RGC,
REGIONAL OFFICE BUILDING (PLANNING AND VERTICAL STRUCTURE - PLANNED : 100%
44 CARIG SUR, TUGUEGARAO CITY, OCTOBER 11, 2017 90 C.D. SOLE CONTRACTOR JANUARY 19, 2018 1,871,971.09
DESIGN DIVISION), NURSERY COMPOUND, BUILDING ACTUAL: 100%
CAGAYAN
SAN GABRIEL, TUGUEGARAO CITY

5 of 10
STATEMENT OF ALL COMPLETED GOVERNMENT AND PRIVATE CONTRACTS

CONTRACT TOTAL CONTRACT VALUE PERCENTAGE OF


NO. NAME OF PROJECT PROCURING ENTITY NATURE OF WORK CONTRACT DATE CONTRACTORS ROLE DATE OF COMPLETION
DURATION AT COMPLETION (Php) ACCOMPLISHMENTS

17PL0176 CONSTRUCTION OF ONE(1) STOREY


TWO(2) CLASSROOM SCHOOL BUILDING WITH
DPWH – LOWER KALINGA DISTRICT VERTICAL STRUCTURE - PLANNED : 100%
45 ATTACHED COMFORT ROOM, RIZAL NATIONAL DECEMBER 01, 2017 90 C.D. SOLE CONTRACTOR MARCH 01, 2018 3,289,367.18
ENGINEERING OFFICE BUILDING ACTUAL: 100%
SCHOOL ARTS & TRADES, SANTOR ANNEX,
RIZAL, KALINGA

17PL0230 CONSTRUCTION OF ONE(1) STOREY


DPWH – LOWER KALINGA DISTRICT VERTICAL STRUCTURE - PLANNED : 100%
46 ONE(1) UNIT REGULAR WORKSHOP, MACUTAY DECEMBER 11, 2017 90 C.D. SOLE CONTRACTOR MARCH 11, 2018 2,802,424.38
ENGINEERING OFFICE BUILDING ACTUAL: 100%
PALAO NHS, RIZAL, KALINGA

17PL0231 CONSTRUCTION OF ONE(1) STOREY


ONE(1) UNIT TVL & OTHER LABORATORY DPWH – LOWER KALINGA DISTRICT VERTICAL STRUCTURE - PLANNED : 100%
47 DECEMBER 11, 2017 SOLE CONTRACTOR MARCH 11, 2018 3,342,884.91
WORKSHOPS BUILDINGS FOR SHS, RNSAT, ENGINEERING OFFICE BUILDING ACTUAL: 100%
RIZAL, KALINGA

17BD0177 - CONSTRUCTION OF ONE (1)


STOREY TWO (2) CL. SCHOOL BUILDING WITH DPWH – CAGAYAN 3RD DISTRICT
VERTICAL STRUCTURE - PLANNED : 100%
48 TOILET, PACAC GRANDE ENGINEERING OFFICE, TUGUEGARAO DECEMBER 22, 2017 120 C.D. SOLE CONTRACTOR MARCH 17, 2018 2,547,376.13
SCHOOL BUILDING ACTUAL: 100%
NATIONAL HIGH SCHOOL, CITY
AMULUNG, CAGAYAN

17BD0185 CONSTRUCTION OF ONE (1) STOREY


DPWH – CAGAYAN 3RD DISTRICT
ONE (1) CL. UNIQUE WORKSHOP BUILDING, VERTICAL STRUCTURE - PLANNED : 100%
49 ENGINEERING OFFICE, TUGUEGARAO DECEMBER 22, 2017 90 C.D. SOLE CONTRACTOR MARCH 17, 2018 3,057,841.94
PENABLANCA EAST NATIONAL HIGH SCHOOL, SCHOOL BUILDING ACTUAL: 100%
CITY
PENABLANCA, CAGAYAN

17BD0186 CONSTRUCTION OF ONE (1) STOREY


DPWH – CAGAYAN 3RD DISTRICT
TWO (2) CL. SCHOOL BUILDING WITH TOILET, VERTICAL STRUCTURE - PLANNED : 100%
50 ENGINEERING OFFICE, TUGUEGARAO DECEMBER 22, 2017 90 C.D. SOLE CONTRACTOR MARCH 17, 2018 2,505,231.83
PENABLANCA EAST NATIONAL HIGH SCHOOL, SCHOOL BUILDING ACTUAL: 100%
CITY
PENABLANCA, CAGAYAN

17BD0183 – CONSTRUCTION OF ONE STOREY


DPWH – CAGAYAN 3RD DISTRICT
THREE (3) CL SCHOOL BUILDING WITH TOILET, VERTICAL STRUCTURE - PLANNED : 100%
51 ENGINEERING OFFICE, TUGUEGARAO DECEMBER 22, 2017 120 C.D. SOLE CONTRACTOR MARCH 22, 2018 3,490,033.84
ENRILE EAST CENTRAL SCHOOL, ENRILE, SCHOOL BUILDING ACTUAL: 100%
CITY
CAGAYAN

6 of 10
STATEMENT OF ALL COMPLETED GOVERNMENT AND PRIVATE CONTRACTS

CONTRACT TOTAL CONTRACT VALUE PERCENTAGE OF


NO. NAME OF PROJECT PROCURING ENTITY NATURE OF WORK CONTRACT DATE CONTRACTORS ROLE DATE OF COMPLETION
DURATION AT COMPLETION (Php) ACCOMPLISHMENTS

17BD0180 – CONSTRUCTION OF ONE STOREY


DPWH – CAGAYAN 3RD DISTRICT
THREE (3) CL SCHOOL BUILDING WITH TOILET, VERTICAL STRUCTURE - PLANNED : 100%
52 ENGINEERING OFFICE, TUGUEGARAO DECEMBER 22, 2017 120 C.D. SOLE CONTRACTOR MARCH 22, 2018 3,490,033.84
ENRILE EAST CENTRAL SCHOOL, ENRILE, SCHOOL BUILDING ACTUAL: 100%
CITY
CAGAYAN

17BD0179 – CONSTRUCTION OF ONE STOREY


DPWH – CAGAYAN 3RD DISTRICT
THREE (3) CL SCHOOL BUILDING WITH TOILET, VERTICAL STRUCTURE - PLANNED : 100%
53 ENGINEERING OFFICE, TUGUEGARAO DECEMBER 22, 2017 120 C.D. SOLE CONTRACTOR MARCH 27, 2018 3,490,033.84
ENRILE EAST CENTRAL SCHOOL, ENRILE, SCHOOL BUILDING ACTUAL: 100%
CITY
CAGAYAN

18BD0009 RE AD - CONSTRUCTION OF
DPWH – CAGAYAN 3RD DISTRICT
NATIONAL COMMISSION ON INDIGENOUS VERTICAL STRUCTURE - NEW PLANNED : 100%
54 ENGINEERING OFFICE, TUGUEGARAO FEBRUARY 07, 2018 360 C.D SOLE CONTRACTOR MARCH 06, 2019 10,552,385.73
PEOPLES (NCIP), REGIONAL OFFICE 2 BUILDING, BUILDING ACTUAL: 100%
CITY
CARIG, TUGUEGARAO CITY, CAGAYAN

18BD0012 CONSTRUCTION OF MULTIPURPOSE DPWH – CAGAYAN 3RD DISTRICT


VERTICAL STRUCTURE - PLANNED : 100%
55 BUILDING, BRGY. PACAC PEQUENO, AMULUNG, ENGINEERING OFFICE, TUGUEGARAO FEBRUARY 04, 2018 120 C.D. SOLE CONTRACTOR MAY 04, 2018 1,900,656.70
BUILDING ACTUAL: 100%
CAGAYAN, 3RD LD CITY

CY 2017 BASIC EDUCATIONAL FACILITIES FUND, DPWH -


VERTICAL STRUCTURE - PLANNED : 100%
56 CONSTRUCTION OF 1 STY-2 CL DAGA ES, APAYAO FIRST DISTRICT JANUARY 02, 2018 150 C.D. SOLE CONTRACTOR MAY 22, 2018 2,879,803.88
SCHOOL BUILDING ACTUAL: 100%
CONNER APAYAO ENGINEERING OFFICE ,APAYAO

18PL0094 REBLOCKING OF DAMAGED PCCP DPWH – LOWER KALINGA DISTRICT HORIZONTAL STRUCTURE - PLANNED : 100%
57 APRIL 25, 2018 90 C.D. SOLE CONTRACTOR JULY 11, 2018 971,859.95
ALONG RIZAL NATIONAL ROADS ENGINEERING OFFICE ROAD ACTUAL: 100%

18PL0068 ASSET PRESERVATION OF NAT'L RD -


REHABILITATION / RECONSTRUCTION /
UPGRADING OF DAMAGED PAVED NAT'L RD
DPWH – LOWER KALINGA DISTRICT HORIZONTAL STRUCTURE - PLANNED : 100%
58 INCLUDING DRAINAGEcBASED ON PAVEMENT FEBRUARY 26, 2018 150 C.D. SOLE CONTRACTOR JULY 04, 2018 20,411,516.77
ENGINEERING OFFICE ROAD ACTUAL: 100%
MANAGEMENT SYSTEM/HDM-4: RIZAL
NATIONAL ROAD (LIWAN WEST - BABALAG -
MACUTAY SECTION)

LOCAL ACCESS ROAD CONSTRUCTION IN HORIZONTAL STRUCTURE - PLANNED : 100%


59 LGU - PAMPLONA, CAGAYAN SEPTEMBER 14, 2017 300 C.D. SOLE CONTRACTOR JULY 14, 2018 14,887,996.99
CASITAN-ALLASITAN, PAMPLONA, CAGAYAN ROAD ACTUAL: 100%

7 of 10
STATEMENT OF ALL COMPLETED GOVERNMENT AND PRIVATE CONTRACTS

CONTRACT TOTAL CONTRACT VALUE PERCENTAGE OF


NO. NAME OF PROJECT PROCURING ENTITY NATURE OF WORK CONTRACT DATE CONTRACTORS ROLE DATE OF COMPLETION
DURATION AT COMPLETION (Php) ACCOMPLISHMENTS

FY 2017 BEFF CONSTRUCTION OF CLASSROOMS


DPWH -
BATCH 13 CONSTRUCTION OF 1STY-WORKSHOP VERTICAL STRUCTURE - PLANNED : 100%
60 APAYAO FIRST DISTRICT JANUARY 02, 2018 240 C.D. SOLE CONTRACTOR AUGUST 01, 2018 6,438,194.60
BLDG. GOV. BENJAMIN LEGUIAB SR. MEM. NHS- SCHOOL BUILDING ACTUAL: 100%
ENGINEERING OFFICE ,APAYAO
MAIN (SCIENCE LAB), CONNER APAYAO

FY 2017 BEFF CONSTRUCTION OF CLASSROOMS


DPWH -
BATCH 13 CONSTRUCTION OF 1STY-WORKSHOP VERTICAL STRUCTURE - PLANNED : 100%
61 APAYAO FIRST DISTRICT JANUARY 02, 2018 240 C.D. SOLE CONTRACTOR AUGUST 01, 2018 6,029,512.50
BLDG. GOV. BENJAMIN LEGUIAB SR. MEM. NHS- SCHOOL BUILDING ACTUAL: 100%
ENGINEERING OFFICE ,APAYAO
MAIN (ICT BUILDING), CONNER APAYAO

18BB0140 CONSTRUCTION AND COMPLETION


DPWH - CAGAYAN 1ST DISTRICT VERTICAL STRUCTURE - PLANNED : 100%
62 OF TWOSTOREY 6-CL SCHOOL BUILDING (9.5M AUGUST 02, 2018 120 C.D. SOLE CONTRACTOR DECEMBER 19, 2018 13,033,750.00
ENGINEERING OFFICE SCHOOL BUILDING ACTUAL: 100%
X 36.00M), MOCAG ES, BAGGAO, CAGAYAN

18BB0139 CONSTRUCTION AND COMPLETION


OF TWO STOREY 6-CL SCHOOL DPWH - CAGAYAN 1ST DISTRICT VERTICAL STRUCTURE - 2 PLANNED : 100%
63 JULY 24, 2018 140 C.D. SOLE CONTRACTOR DECEMBER 19, 2018 13,003,804.98
BUILDING (9.5M X36.00M), ENGINEERING OFFICE STOREY SCHOOL BUILDING ACTUAL: 100%
ARIDOWEN ES, STA. TERESITA, CAGAYAN

18BD0002 CONSTRUCTION OF TWO (2)


DPWH – CAGAYAN 3RD DISTRICT
CLASSROOMS SCHOOL BUILDING, PEÑABLANCA VERTICAL STRUCTURE - PLANNED : 100%
64 ENGINEERING OFFICE, TUGUEGARAO JANUARY 31, 2018 120 C.D. SOLE CONTRACTOR APRIL 15, 2019 1,969,988.90
WEST CENTRAL ELEMENTARY SCHOOL, SCHOOL BUILDING ACTUAL: 100%
CITY
BRGY. CENTRO, PEÑABLANCA, CAGAYAN

CARIG-INFRA-2018-07-002- SUBGRADE
PREPARATION AND PCCP CONCRETING OF
CAGAYAN STATE UNIVERSITY - CARIG HORIZONTAL STRUCTURE - PLANNED : 100%
65 VARIOUS PORTIONS OF THE CAMPUS ROAD NOVEMBER 15, 2018 180 C.D. SOLE CONTRACTOR OCTOBER 19, 2019 5,844,765.68
CAMPUS, TUGUEGARAO CITY ROAD ACTUAL: 100%
NETWORK CAGAYAN STATE UNIVERSITY -
CARIG CAMPUS, TUGUEGARAO CITY

19B00047 - REPAIR-MAINTENANCE OF DPWH


DPWH – REGIONAL OFFICE 2, RGC,
BUILDING – PDD (EMPLOYEES QUARTERS AND VERTICAL STRUCTURE - PLANNED : 100%
66 CARIG SUR, TUGUEGARAO CITY, SEPTEMBER 09, 2019 90 C.D. SOLE CONTRACTOR NOVEMBER 15, 2019 686,823.21
GENDER BUILDING), NURSERY COMPOUND, BUILDING ACTUAL: 100%
CAGAYAN
SAN GABRIEL, TUGUEGARAO CITY, CAGAYAN

8 of 10
STATEMENT OF ALL COMPLETED GOVERNMENT AND PRIVATE CONTRACTS

CONTRACT TOTAL CONTRACT VALUE PERCENTAGE OF


NO. NAME OF PROJECT PROCURING ENTITY NATURE OF WORK CONTRACT DATE CONTRACTORS ROLE DATE OF COMPLETION
DURATION AT COMPLETION (Php) ACCOMPLISHMENTS

19B00048 - REPAIR-MAINTENANCE OF DPWH


DPWH – REGIONAL OFFICE 2, RGC,
BUILDING – MATERIALS LABORATORY VERTICAL STRUCTURE - PLANNED : 100%
67 CARIG SUR, TUGUEGARAO CITY, SEPTEMBER 09, 2019 60 C.D. SOLE CONTRACTOR OCTOBER 31, 2019 487,866.98
BUILDING, DPWH REGIONAL OFFICE NO. 02, BUILDING ACTUAL: 100%
CAGAYAN
CARIG SUR, TUGUEGARAO CITY, CAGAYAN

19B00049 - REPAIR-MAINTENANCE OF DPWH


DPWH – REGIONAL OFFICE 2, RGC,
BUILDING – MAIN BUILDING, DPWH REGIONAL VERTICAL STRUCTURE - PLANNED : 100%
68 CARIG SUR, TUGUEGARAO CITY, SEPTEMBER 13, 2019 90 C.D. SOLE CONTRACTOR NOVEMBER 15, 2019 790,394.41
OFFICE NO. 02, CARIG SUR, TUGUEGARAO CITY, BUILDING ACTUAL: 100%
CAGAYAN
CAGAYAN

19PL0030 - CONSTRUCTION-IMPROVEMENT OF
ACCESS ROADS LEADING TO TRADES,
INDUSTRIES AND ECONOMIC ZONES - ROAD
FROM SITIO ACEGA, KINAMA, RIZAL TO TUAO DPWH – LOWER KALINGA DISTRICT HORIZONTAL STRUCTURE - PLANNED : 100%
69 JUNE 06, 2019 210 C.D. SOLE CONTRACTOR DECEMBER 06, 2019 17,008,068.80
CONNECTING RIZAL NATIONAL RD (BABALAG- ENGINEERING OFFICE ROAD ACTUAL: 100%
SAN FRANCISCO SECTION) AND KINAMA IN
SUPPORT OF SUGARCANE PROCESSING AND
BANANA CHIPS PROCESSING, RIZAL, KALINGA

18BB0141 CONSTRUCTION AND COMPLETION


OF TWOSTOREY 12 CLASSROOMS SCHOOL
BUILDING (2-REGULAR WORKSHOP, 2 SCI.LAB., DPWH - CAGAYAN 1ST DISTRICT VERTICAL STRUCTURE - PLANNED : 100%
70 AUGUST 02, 2018 150 C.D. SOLE CONTRACTOR JANUARY 28, 2019 27,168,106.00
2-ICT LAB.) (9.5M X 64.00M), CALAOAGAN ENGINEERING OFFICE SCHOOL BUILDING ACTUAL: 100%
DACKEL NHS-CAPISSAYAN ANNEX, CALAOAGAN
DACKEL, GATTARAN, CAGAYAN

19PL0004 IMPROVEMENT OF LOCAL ROAD,


DPWH – LOWER KALINGA DISTRICT HORIZONTAL STRUCTURE - PLANNED : 100%
71 CAPAPA-AN, BRGY. LIWAN WEST, RIZAL, JUNE 13, 2019 60 C.D. SOLE CONTRACTOR SEPTEMBER 10, 2019 1,868,502.81
ENGINEERING OFFICE ROAD ACTUAL: 100%
KALINGA

18BD0126: CONSTRUCTION OF THREE (3)


STOREY TWELVE (12) CLASSROOM SCIENCE
DPWH -
LABORATORY -TWO (2) CLASSROOM TWO (2)
CAGAYAN THIRD DISTRICT VERTICAL STRUCTURE - 3 PLANNED : 100%
72 CLASSROOM REGULAR WORKSHOP BUILDING AUGUST 08, 2018 190 C.D. SOLE CONTRACTOR SEPTEMBER 23, 2020 29,686,430.08
ENGINEERING OFFICE STOREY SCHOOL BUILDING ACTUAL: 100%
AND TWO (2) CLASSROOM ICT BUILDING,
SAN GABRIEL, TUGUEGARAO CITY
CABBO NATIONAL HIGH SCHOOL,
PEÑABLANCA, CAGAYAN

9 of 10
STATEMENT OF ALL COMPLETED GOVERNMENT AND PRIVATE CONTRACTS

CONTRACT TOTAL CONTRACT VALUE PERCENTAGE OF


NO. NAME OF PROJECT PROCURING ENTITY NATURE OF WORK CONTRACT DATE CONTRACTORS ROLE DATE OF COMPLETION
DURATION AT COMPLETION (Php) ACCOMPLISHMENTS

21BD0105 - CONSTRUCTION OF NATIONAL


COMMISSION ON INDIGENOUS PEOPLES (NCIP)
DPWH -
REGIONAL OFFICE NO. 02 GOVERNMENT
CAGAYAN THIRD DISTRICT VERTICAL STRUCTURE - PLANNED : 100%
73 BUILDING (COMPLETION) LOCATED AT MAY 24, 2021 210 C.D. SOLE CONTRACTOR DECEMBER 08, 2021 9,900,000.00
ENGINEERING OFFICE BUILDING ACTUAL: 100%
REGIONAL GOVERNMENT CENTER, CARIG SUR,
SAN GABRIEL, TUGUEGARAO CITY
TUGUEGARAO CITY, CAGAYAN

PRIVATE

Vertical Structure
Construction of two storey residential building Reynor Bernalte PLANNED : 100%
1 - Building – New October 17, 2011 120 C.D. SOLE CONTRACTOR February 20, 2012 695,228.80
Babalag West, Rizal, Kalinga Babalag West, Rizal, Kalinga ACTUAL: 100%
Construction

Vertical Structure
Construction of onestorey, three-bedroom Jocelyn A. Peralta PLANNED : 100%
2 - Building – New August 10, 2011 210 C.D. SOLE CONTRACTOR January 30, 2012 1,591,690.19
residential building Liwan East, Rizal, Kalinga Liwan East, Rizal, Kalinga ACTUAL: 100%
Construction
Matilde Sales Implementing
INFINITEA ROBINSON’S PLANNED : 100%
3 Caritan Sur, Tuguegarao City, and Execution of - 60 C.D. SOLE CONTRACTOR 2017 2,000,000.00
PLACE 2ND FLOOR ACTUAL: 100%
Cagayan Interior Design
Matilde Sales Implementing
INFINITEA ROBINSON’S PLANNED : 100%
4 Caritan Sur, Tuguegarao City, and Execution of - 120 C.D. SOLE CONTRACTOR 2019 6,000,000.00
PLACE 2ND FLOOR ACTUAL: 100%
Cagayan Interior Design

Matilde Sales Implementing


INFINITEA ROBINSON’S PLANNED : 100%
5 Caritan Sur, Tuguegarao City, and Execution of - 60 C.D. SOLE CONTRACTOR 2019 4,000,000.00
PLACE 2ND FLOOR ACTUAL: 100%
Cagayan Interior Design

10 of 10
Capacity/Performance Motor No. / Proof of ownership
Description Model/Year Size
Plate No. Location Condition
Body No. Lessor/Vendor
LIST OF EQUIPMENTS

BACKHOE PC 200 1 cu.m. N/A 35591 Rizal, Kalinga Good, Running Deed of Sale/DR

Komatsu Excavator PC
BACKHOE 0.40 cu.m. N/A PC40-7 Rizal, Kalinga Good, Running Purchased - OR/CR
40

HD820-6 /
BACKHOE KATO HD82O N/A Rizal, Kalinga Good, Running Purchased - AR
KWJ21E1PF0005604

BULLDOZER Komatsu Galeo D21A-8 N/A TPB3-250 Rizal, Kalinga Good, Running Purchased-AR

CONCRETE SCREEDER 2015 N/A N/A J916785 Rizal, Kalinga Good, Running Purchased - CI

E13CUB-11595 / FS1EKX-
DUMPTRUCK Hino 6 cyl. - Rizal, Kalinga Good, Running Purchased - OR/CR
10327

DUMPTRUCK Isuzu Giga 12 cu. Yd RGZ 488 12PE1-141560 Rizal, Kalinga Good, Running OR/CR

CXZ81K1-3006113 / 10PE1-
DUMPTRUCK Isuzu Giga / 2012 10 cu. / 10 cyl. RMN 420 Rizal, Kalinga Good, Running Purchased - OR
162035

DUMPTRUCK Isuzu Giga / 2015 10 cu. / 6 cyl. APA6063 6WF1-114579 Rizal, Kalinga Good, Running Purchased - AR

WD61547170707059107 /
DUMPTRUCK Sinotruck A7 6 cyl. - Rizal, Kalinga Good, Running Delivery Receipt
LZZ5ELSD4HA261761

CXG0 0955 THOH 00272 /


PAYLOADER XGMA 3 cu.m. N/A Rizal, Kalinga good, running Purchased/DR
C918I000125

CXG00955CH0H01169 /
PAYLOADER XGMA 3 cu.m. N/A Rizal, Kalinga good, running Purchased/DR
C917A002371

ROAD ROLLER Volvo 10.5 tons AWB 744 / CUX 859 Rizal, Kalinga good, running Certification

GD7O5R-1-2069 / NH220-
ROAD GRADER Komatsu - N/A Rizal, Kalinga Good, Running Purchased - DR
26145036

TRANSIT MIXER Fuso / 2004 8 cyl. 30110 8DC11-503497 Rizal, Kalinga good, running Purchased - OR/CR

Page 1 of 2
Capacity/Performance Motor No. / Proof of ownership
Description Model/Year Size
Plate No. Location Condition
Body No. Lessor/Vendor
LIST OF EQUIPMENTS
10PE1-188418 /
TRANSIT MIXER Isuzu 10 cyl - Rizal, Kalinga Good, Running Deed of Sale OR, CR
JALCXZ81K33000280
6HH1-208423 / FRR33H2 -
TRUCK MOUNTED CRANE Isuzu 7000 / 6 cyl. 30109 Rizal, Kalinga Good, Running Delivery Receipt
3000514

SERVICE TRUCK Suzuki / 2015 . 090103 FGA-7038358 Rizal, Kalinga Good, Running Purchased - OR / CR

SERVICE TRUCK Isuzu Elf / 2004 PHD 606 319377 Rizal, Kalinga Good, Running Deed of Assignment of Rights

LOWBED TRAILER Trailer Heavy 13500 AUA 8083 JGS41M-3A-95147 Rizal, Kalinga Good, Running Purchased - OR / CR

E13CTM-10526 /
TRACTOR HEAD Hino 10290 ABB5614 Rizal, Kalinga Good, Running Purchased - OR / CR
CHDSH1EEPXXX10137

751750111518 /
COMPACTOR BOMAG 8 tons N/A Rizal, Kalinga Good, Running Purchased - DR
BW131ACW-2

6M70-318988 / FT50JLX-
TANKER FUSO / 2006 6 cyl. 30106 Rizal, Kalinga Good, Running Purchased - OR / CR
520067