You are on page 1of 8

Department of Trade & Industry Philippines

Construction Industry Authority of the Philippines


PHILIPPINE CONTRACTORS ACCREDITATION BOARD
RENEWAL OF REGULAR CONTRACTOR’S LICENSE APPLICATION
PCAB-F-SVD-002b. Revision No. 00, 11/19/2018 | This Form is NOT for sale. Reproduction is Allowed
STE QUALIFICATION REQUIREMENTS

1. A technology professional, such as engineer or architect, duly licensed by the Professional Regulation
Commission (PRC).

2. Holder of a valid PRC ID

3. With three (3) years minimum actual construction experience.

4. A full-time employee of the nominating contractor, not associated professionally or by employment with
any other party, particularly a party engaged in construction or construction-related activities.

5. Have none of the following disqualifications:

a) Involvement, in any capacity, in any construction malperformance of grave consequence, suggestive


of his negligence, incompetence and/or malpractice;

b) Involvement, by himself or in collaboration with any other person or firm, in any act or omission liable
for disciplinary action of which he/she is or the other person or firm was found guilty by the PCAB
Board;

c) Conviction by a court of competent jurisdiction of any offense involving moral turpitude; and

d) If formerly a Sustaining Technical Employee or an Authorized Managing Officer of any construction


firm but disassociated there from, failure to notify the Board of his disassociation in accordance
with paragraph 5 and 6 of the Affidavit of Undertaking.

This is to certify that I have verified with PRC the above stated professional eligibility/registration of the
Sustaining Technical Employee. Affiant herein and found the same to be true and correct.

________VICTOR T. LAGUYO______________
Authorized Managing Officer (AMO)
(Signature over Printed Name)

__________________________________________
Date

AMO must sign here:


AFFIDAVIT OF STE CONSTRUCTION WORK EXPERIENCE
Note: Please use additional sheets if necessary. Renewal of Regular Contractor’s License Application (Corporation/Partnership)
PCAB-F-SVD-002b. Revision No. 00, 11/19/2018
This Form is NOT for sale. Reproduction is Allowed
Republic of the Philippines ) Page 2 of 8
Province of ______________)
City/Municipality of ________) S.S

I, _Federico R. Socia__, single/married, Filipino, of legal age, with postal address at 36 Cebu St., Pael Subdivision Culiat,
Quezon City, having been duly sworn in accordance with law depose and say that the projects enumerated below
constitute my full & complete construction experience.

Name and Work Nature/Scope of Work Project Duration


Complete Address of Employer/ Classification Assignment (mm/dd/yyyy)
Name & Location of Projects Undertaken (GE, GB, SP) (Proj. Engr.)
From To

Nelson Sotto Construction, Corp.


Arellano St., Dagupan City
Project Manager- DPWH Projects

1. By pass road connecting


Mangaldan, Brgy. Anolid to Calasiao GE Project Manager January August
2. By pass road connecting Devenecia Road 2021 2022
To Mangaldan,
3. By pass road Connecting Devenecia
Road to Binmaley.
4. Flood Control Projects along Pantal
River.
5. Uplifting of Malued District Road
6. Flood Controls of Three Major waterways
Of Manaoag Pangasinan.
7.Bay Walk, roads, Culverts, Along
Tondaligan , Dagupan City To San Fabian,
Pangasinan.

737 Builders, Corp.


Cabugao, Ilocos Sur
Project Manager, DPWHProjects

1. Candon Sports Complex GE,GB,SP Project Manager January December


Brgy Bagani. Ubbog, Candon City 2020 2020

December
M. G. Lualhati Const.Corp. GE Project Manager April 2019 2019
Rada Bldg., Quezon City.Ilocos Sur
1. Candon By Pass
2. Twin Bridge , By pass, Candon
City, Ilocos Sur
December
3. Steel Bridge, Brgy. Calumbuyan, Santa G.E. Project Manager April 2019
2019
Ilocos Sur.
December
4. Concrete Bridge Connecting Brgy.
2019
Baballasiaon, Maria Ilocos Sur. GE Project Manager April 2019

V.T. Laguyo Construction, Inc


1 Chico St. P6B Greenwoods Executie
Village Cainta Rizal
Project Manager– Architectural 30 March
and Civil Works Project 01 Sept 2019
1. SGS Philippines 2229 Chino Roces GB, SP Manager/Engineer 2017
Makati City

M,G, Lualhati Construction,


2nd Flr. Rada Bldg. Quezon City
1. Construction of Baballasioan Project Engineer August
Renewal of Regular Contractor’s License Application (Corporation/Partnership)
PCAB-F-SVD-002b. Revision No. 00, 11/19/2018
This Form is NOT for sale. Reproduction is Allowed
Page 3 of 8

La Salle College of Antipolo, GB Project 29 July October


Town and Country Heights San Manager/Engineer 2016 2016
Luis, Antipolo City,
Renovation of Bro. Reche
Building
6.

7. Philippine Red Cross, Magsaysay


Blvd. Cor MH. Del Pilar Tacloban GB, SP Project 22 April May 2017
City , Construction of Training Manager/Engineer 2016
Center (Trade School

8. Shangri-La Mactan Resort and Spa,


Punta Engano Lapu-Lapu City GB, SP Project Manager/ 01 July 15 July
Cebu, Engineer 2016 2016
Modification of Existing Railing at
Reche Building

9. Bank of Commerce GB Project Manager/ 11 28


Proposed Banilad Cebu Engineer November December
2016 2016
10. Bank of Commerce Proposed GB Project 31 March May 2017
Tanuan Branch Manager/Engineer 2017

11. Bank of Commerce Proposed GB Project 24 March May 2017


Baliuag Branch Manager/Engineer 2017

12. Makati Shangri-la Hotel and Resort- GB, SP Project Manager/ August September
Shangri-la Boracay Engineer 2017 2017
Office located in Makati
Shangri-la

13. Proposed YSA Skin and Body GB, SP Project Manager/ June 2017 5 October
Experts, South Park Mall Engineer 2018

14. Shangri-la Mactan Resorts and Spa GB, SP Project Manager/ 20 June 05 January
Engineer 2017 2018
Preventive Maintenance for Rooms
and Residences
GB, SP Project Manager/ 20 April 18 July
15. Northern Cement Corporation Sison Engineer 2017 2017
Pangasinan
Installation of Bulk Loading Shed
GB, SP Project Manager/ July 2017 October
16. La Salle College of Antipolo Various Engineer 2017
Additional Works for Senior High
Building –Renovation of Basketball
Court and Repair of Bro. Donato
Roofing
GB, SP, GE Project Manager/ 17 March 30May
17. La Salle College of Antipolo. Engineer 2017 2017
Various Additional Works for Senior
High Building
GB, SP Project Manager/ August September
18. La Salle College of Antipolo Fit Out Engineer 2017 2018
Works B1,B2,B3 LSCA, La Salle
College of Antipolo
GB, SP Project Manager/ 2 12
19. La Salle College of Antipolo Engineer September December
Covered Walk Connecting High 2017 2017
School
Renewal of Regular Contractor’s License Application (Corporation/Partnership)
PCAB-F-SVD-002b. Revision No. 00, 11/19/2018
This Form is NOT for sale. Reproduction is Allowed
Page 4 of 8

Sorenas Residence
K.H St., Cor. Ermin Garcia Cubao, Quezon
City
Project April 2010 30 August
1. Construction of Four Store GB Manager/Engineer 2016
Residence

Mr . & Mrs Jerome Legaspi


Tylor St. Phase 1 Royale Tagaytay Alfonso GB Project 15 January 20 April
Cavite City Manager/Engineer 2010 2015

1. Costruction of three Storey


Residence

Mr . & Mrs Myra Juan GB Project 4 August 4


Casanas St., Sampaloc, Manila Manager/Engineer 2008 December
2009
1. Construction of four Story
Residence

Mr . Faustino Tanya GB Project 20 June 12 July


1. Costruction of Office Warehouse Manager/Engineer 2007 2008
and 500 sq.m concrete pavement.

V.T. Laguyo Construction, Inc


1 Chico St. P6B Greenwoods
Executie Village Cainta Rizal

Project Manager– Architectural and


Civil Works
GB Project January May 2004
1. Renovation of Comfort Manager/Engineer 2004
Rooms.Classrooms and
Building at De La Salle
University Taft Manila GB Project 18 May 24
2. Concreting of Warehouse Manager/Engineer 2005 February
pavement and parking at Allied 2005
Domeq Phils. Inc. KM SSA
Paranaque City. GB Project 26 July 18 October
3. Construction of Building Manager/Engineer 2005 2005
Machinaries foundation and
construction of Center Sta. Rosa,
Laguna GB Project 20 October 4 May
4. Construction of building HRM Manager/Engineer 2005 2005
Laboratory & Student Lounge Jose
Rizal University 80 Shaw Blvd.
Mandaluyong City

Atty.& Mrs. Felix Catadena


Bonuan Boquid, Dagupan City
Project April 2003 December
1. Construction of Unit Townhouse GB Manager/Engineer 2003
Renewal of Regular Contractor’s License Application (Corporation/Partnership)
PCAB-F-SVD-002b. Revision No. 00, 11/19/2018
This Form is NOT for sale. Reproduction is Allowed
Page 5 of 8

Mr. & Mrs. Jose Socia


San Manuel, Pangasinan
Project August March
1. Construction of 3 Floors of GB Manager/Engineer 2002 2003
Piggery Farm

Mrs. Vicky J. Rosario


Poblacion Sta.Barbara Pangasinan
Project January July 2002
1. Construction of 12 Units GB Manager/Engineer 2002
Townhouse

Mr. Rustico Del Rosario


#38 Mahogany St. Greenpark Village
Pasig City
1. Construction of two storey, four GB Project March December
Bedrooms Residence Manager/Engineer 2001 2001

Ma. Gheslane Evangelista


12 Arias St. San Miguel Manila
Project July 2000 February
1. Construction of Six door, Two GB Manager/Engineer 2001
Storey Townhouses

Mrs. Weedy Venus


287 San Francisco St. Bo. Kapitolyo
Pasig City
Project November July 2000
1. Construction of four door, Two GB Manager/Engineer 1999
(2) storey Townhouses

Modular Construction
Panay St. Quezon City
Project September October
1. Construction of 7 Doors, Two GB Manager/Engineer 1998 1999
(2) storey Townhouses,
Jupiter St. Conggresional
Village Quezon City

Colmbia Crystal Condo


38 Colubia St. cor 15th Ave. Cubao,
Quezon City
1. Construction of 80 units, four GB,SP-ES Project April 1996 August
storey condominium with 440 Manager/Engineer 1998
sq.m Parking area and four
level elevator

M.A Aragon Construction


Bacoor Cavite

1. Construction of 34 ft. GB Project July 1995 March


concrete Bridge Tanza Cavite Manager/Engineer 1996
2. Widening of four km. road
GB Project May 1994 July 1995
Renewal of Regular Contractor’s License Application (Corporation/Partnership)
PCAB-F-SVD-002b. Revision No. 00, 11/19/2018
This Form is NOT for sale. Reproduction is Allowed
Page 6 of 8
pavement and widening of Manager/Engineer
concrete bridge along JP
Rizal St. Makati City

REB. Construction
97-A West Avenue Quezon City

1. Construction of 10 GB Project Engineer October April 1994


Classrooms, two storey 1993
School Building Bonifacio
Elementary School Caloocan
City
2. Construction of 12
Classrooms, Two storey GB Project Engineer July 1993 October
school Building Tore Hills 1993
Elementary School Project 8,
Quezon City
3. Construction of 8.5 kms. GE Project Engineer September July 1993
Brgy. Road Pavement, 1992
Poblacion San Miguel,.
Bulacan
4. Construction of Six Units GB Project Engineer July 1991 September
ATEP Farm Structure. RCAT 1992
Bo. Sampaloc Tanay Rizal

LCN Construction Inc.


Antipolo Rizal

1. Construction of 75 1 ft. self GB Project Engineer September May 1990


standing transmission tower 1989
and radio room office
building Beverly Hills,
Antipolo Rizal
2. Construction of 10.75 kms. GE Project Engineer May 1988 December
Road pavement, culverts, 1998
open canal
3. Construction of 40 Units low GB Project Engineer December October
cost housing units. Leris 1998 1998
Country Homes,
Antipolo,Rizal

REB Construction
97-A West Ave. Quezon City

1. Construction of 6.20 Earthen


Road and drainages both GB Project Engineer October April 1994
sides Rizal College of 1993
Agriculture and Technology.
BO Sampaloc Tanay Rizal

That I authorize the PCAB to verify and investigate any or all information in this affidavit from whatever sources PCAB
may consider appropriate;

That I am executing this affidavit to attest to the truth of the foregoing.

FURTHER AFFIANT SAYETH NAUGHT.

_____FEDERICO R. SOCIA_______
Affiant
Renewal of Regular Contractor’s License Application (Corporation/Partnership)
PCAB-F-SVD-002b. Revision No. 00, 11/19/2018
This Form is NOT for sale. Reproduction is Allowed
Page 7 of 7
SUBSCRIBED AND SWORN to before me this ________ day of ___________________________________ 20_____
at ______________________________________________________________; affiant exhibited his/her Community
Tax Certificate No. _______________ issued at __________ _____ on ______________________.

NOTARY PUBLIC
Until December 31, 20 ___

Doc. No
Page No.
Book No.
Series of 20 _____.