Progress Report No.2

This progress report details the current status of the Licaros Car Park Building project as of January 24, 2022, including mobilization, permits, and fire protection system installations. It provides a breakdown of various construction tasks with their respective completion percentages and quantities. The report highlights the ongoing work and materials required for the fire protection system across different floors of the building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views4 pages

Progress Report No.2

This progress report details the current status of the Licaros Car Park Building project as of January 24, 2022, including mobilization, permits, and fire protection system installations. It provides a breakdown of various construction tasks with their respective completion percentages and quantities. The report highlights the ongoing work and materials required for the fire protection system across different floors of the building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT : LICAROS CAR PARK BUILDING

OWNER : ONDARRE HOLDING CORPORATION


LOCATION : 171 EDSA, WACK-WACK, MANDALUYONG CITY
SUBJECT : PROGRESS REPORT NO.2
Date : January 24, 2022
PREVIOUS TODAY
Item Description Quantity Unit Weighted
Actual % Weight % Actual % Weight %
1.1 Mobilization / Demobilization 1 lot 0.77% 50.00% 0.38% 50.00% 0.38%
Materials
Manpower
Machines and Heavy Equipment
1.2 Bonds and Insurances 1 lot BY RLC
Surety Bond (20%)
Performance Bond (30%)
Guarantee Bond (10%)
1.3 Permits 1 lot BY RLC
Fire Protection Permit
1.4 Temporary Facilities lot BY RLC
1.4.3. Contractor's Field Office (Kindly Indicate all your requirements. Do not leave anything not
1.5 Utilities During Construction (Power, Water, etc.) lot BY RLC
Temporary Power Supply (from electricy distributor)
Temporary Water Supply
Generator Sets (Back-up)
1.6 PPE's and Other Safety and Security Requirements 1 lot 0.77% 50.00% 0.38% 60.00% 0.46%
1.7 Construction/Engineering Supervision, Coordination Fee and Other Site Operating Expenses 1 lot 1.54% 30.00% 0.46% 40.00% 0.62%
1.8 Submittals, Plans, As built plans and other related documents as needed 1 lot 0.38% 30.00% 0.12% 50.00% 0.19%
1.9 Covid-19 Countermeasure (Optional) 1 lot 0.92% 50.00% 0.46% 70.00% 0.65%

Sub-total 1
IV. FIRE PROTECTION SYSTEM (SUPPLY AND DELIVERY OF MATERIALS, TOOLS, EQUIPMENTS, LABOR, CONSUMABLES AND TESTING)
4.1 Pump Room
4.1.1 Pump House
Supply and Installation of Fire Pump, Fire Pump Controller and other accessories needed to
complete the system
FIRE PUMP (UL Listed & FM Approved), 500 USGPM at 100 PSI TDH 1 set 3.08% 0.00% 0.00% 0.00% 0.00%
FIRE PUMP DRIVER Electric Motor complete with standard features and accessories

Supply and Installation of Jockey Pump, Jockey Pump Controller and other accessories needed to
complete the system
JOCKEY PUMP (UL / FM Approved), 500 USGPM at 100 PSI TDH, 440V, ELECTRIC MOTOR DRIVEN 1 set 1.54% 0.00% 0.00% 0.00% 0.00%
JOCKEY PUMP CONTROLLER (UL / FM Approved)
Valves and Ancillaries
a. Supply and Installation of Gate Valve
80 mm diameter 3 pc/s 1.14% 0.00% 0.00% 0.00% 0.00%
b. Supply and Installation of Alarm Check Valve
100 mm diameter 1 pc/s 1.76% 0.00% 0.00% 0.00% 0.00%
c. Supply and Installation of Floor Control Valve
100 mm diameter 7 pc/s 3.78% 0.00% 0.00% 0.00% 0.00%
d. Supply and Installation of Pressure Relief Valve
100 mm diameter 1 pc/s 0.40% 0.00% 0.00% 0.00% 0.00%
e. Supply and Installation of Flow Meter
100 mm diameter 1 pc/s 0.87% 0.00% 0.00% 0.00% 0.00%
f. Supply and Installation of Flushing Connection
100 mm diameter 1 pc/s 0.18% 0.00% 0.00% 0.00% 0.00%
g. Supply and Installation of Pressure Gauge
100 mm diameter 8 pc/s 0.72% 0.00% 0.00% 0.00% 0.00%
PIPES
Supply and installation of black iron (B.I.) pipes sch. 40 including pipe fittings, painting, sleeves,
hangers and supports, sway braces and other miscellaneous items as shown and as required to
complete the system.
a. 100 mm dia. B.I. pipe sch. 40 15 lm 0.57% 0.00% 0.00% 0.00% 0.00%
2.1.b. FIRE PROTECTION PERIMETER
Fire Water Line
Supply and installation of black iron (B.I.) fittings pipes sch. 40 including painting, sleeves,
hangers and supports, sway braces and other miscellaneous items as shown and as
required to complete the system.
b. 150 mm dia. B.I. pipe sch. 40 6 lm 0.38% 0.00% 0.00% 0.00% 0.00%
c. 100 mm dia. B.I. pipe sch. 40 10 lm 0.38% 0.00% 0.00% 0.00% 0.00%
d. 65 mm dia. B.I. pipe sch. 40 10 lm 0.19% 0.00% 0.00% 0.00% 0.00%
Valves and Ancillaries
Supply and installation of OS&Y gate valves
b. 150 mm diameter 1 pc/s 0.45% 0.00% 0.00% 0.00% 0.00%
c. 100 mm diameter 3 pc/s 1.05% 0.00% 0.00% 0.00% 0.00%
FIRE DEPARTMENT CONNECTION (Siamese Twin), Complete Set 1 set/s 0.38% 0.00% 0.00% 0.00% 0.00%
FIREMAN'S SUIT CABINET
a. Fireman's Suit Cabinet - Aluminum Body, Polycarbonate Front Panel unit/s EXCLUDED
b. Fireman's Suit set/s EXCLUDED
c. Fireman's Helmet pc/s EXCLUDED
d. Fireman's Boots pair/s EXCLUDED
e. Axe pc/s EXCLUDED
f. Hydrant Opener pc/s EXCLUDED
g. Nozzle pc/s EXCLUDED
4.2 Ground Floor
Fire Water Line
Supply and installation of black iron (B.I.) pipes sch. 40 including pipe fittings, painting, sleeves,
hangers and supports, sway braces and other miscellaneous items as shown and as required to
complete the system.
a. 150 mm dia. B.I. pipe sch. 40 32 lm 2.01% 0.00% 0.00% 0.00% 0.00%
b. 100 mm dia. B.I. pipe sch. 40 155 lm 5.85% 0.00% 0.00% 0.00% 0.00%
c. 80 mm dia. B.I. pipe sch. 40 10 lm 0.24% 0.00% 0.00% 0.00% 0.00%
d. 40 mm dia. B.I. pipe sch. 40 (for FHC Line) 30 lm 0.28% 0.00% 0.00% 0.00% 0.00%
e. 32 mm dia. B.I. pipe sch. 40 44 lm 0.35% 0.00% 0.00% 0.00% 0.00%
f. 25 mm dia. B.I. pipe sch. 40 370 lm 2.17% 0.00% 0.00% 0.00% 0.00%
Supply and Installation of Sprinkler System
a. Upright Fire Sprinkler 91 pc/s 0.65% 0.00% 0.00% 0.00% 0.00%
b. Pendent Fire Sprinkler 18 set/s 0.12% 0.00% 0.00% 0.00% 0.00%
Supply and Installation of Fire Extinguisher
a. CO2 Porable Fire Extinguisher (50kgs) 1 pc/s 0.19% 0.00% 0.00% 0.00% 0.00%
Fire Hose Cabinets
Supply and Installation of EFHC - Surface Mounted - Alumninum Housing Painted Safety Red,
Double Jacketed Fire Hose Alloy Material for Nozzle and Brass material for Valve and Fittings,
with security lock, 1/8 Thk. Clear Glass Panel, with Break Glass Hammer Alloy Body w/ Stainless Chain
a. FHC 2 set/s 0.68% 0.00% 0.00% 0.00% 0.00%
b. Fire Extinguisher 2 pc/s 0.06% 0.00% 0.00% 0.00% 0.00%
4.3 2nd Floor
Fire Water Line
Supply and installation of black iron (B.I.) pipes sch. 40 including pipe fittings, painting, sleeves,
hangers and supports, sway braces and other miscellaneous items as shown and as required to
complete the system.
a. 150 mm dia. B.I. pipe sch. 40 6 lm 0.44% 0.00% 0.00% 20.00% 0.09%
b. 100 mm dia. B.I. pipe sch. 40 135 lm 5.10% 0.00% 0.00% 80.00% 4.08%
c. 80 mm dia. B.I. pipe sch. 40 4 lm 0.10% 0.00% 0.00% 30.00% 0.03%
d. 40 mm dia. B.I. pipe sch. 40 (for FHC Line) 22 lm 0.21% 0.00% 0.00% 30.00% 0.06%
e. 32 mm dia. B.I. pipe sch. 40 35 lm 0.28% 0.00% 0.00% 80.00% 0.22%
f. 25 mm dia. B.I. pipe sch. 40 370 lm 2.17% 0.00% 0.00% 80.00% 1.74%
Supply and Installation of Sprinkler System
. a. Upright Fire Sprinkler 87 pc/s 0.62% 0.00% 0.00% 80.00% 0.50%
b. Pendent Fire Sprinkler 17 set/s 0.12% 0.00% 0.00% 30.00% 0.03%
Fire Hose Cabinets
Supply and Installation of EFHC - Surface Mounted - Alumninum Housing Painted Safety Red,
Double Jacketed Fire Hose Alloy Material for Nozzle and Brass material for Valve and Fittings,
with security lock, 1/8 Thk. Clear Glass Panel, with Break Glass Hammer Alloy Body w/ Stainless Chain
a. FHC 2 set/s 0.68% 0.00% 0.00% 0.00% 0.00%
b. Fire Extinguisher 2 pc/s 0.06% 0.00% 0.00% 0.00% 0.00%
4.4 3rd Floor
Fire Water Line
Supply and installation of black iron (B.I.) pipes sch. 40 including pipe fittings, painting, sleeves,
hangers and supports, sway braces and other miscellaneous items as shown and as required to
complete the system.
a. 150 mm dia. B.I. pipe sch. 40 6 lm 0.44% 70.00% 0.31% 70.00% 0.31%
b. 100 mm dia. B.I. pipe sch. 40 155 lm 5.85% 70.00% 4.10% 92.00% 5.38%
c. 80 mm dia. B.I. pipe sch. 40 4 lm 0.10% 50.00% 0.05% 50.00% 0.05%
d. 40 mm dia. B.I. pipe sch. 40 (for FHC Line) 27 lm 0.25% 30.00% 0.08% 70.00% 0.18%
e. 32 mm dia. B.I. pipe sch. 40 41 lm 0.33% 30.00% 0.10% 70.00% 0.23%
f. 25 mm dia. B.I. pipe sch. 40 367 lm 2.15% 30.00% 0.65% 70.00% 1.51%
Supply and Installation of Sprinkler System
a. Upright Fire Sprinkler 104 pc/s 0.75% 84.00% 0.63% 84.00% 0.63%
b. Pendent Fire Sprinkler 1 set/s 0.01% 0.00% 0.00% 0.00% 0.00%
Fire Hose Cabinets
Supply and Installation of EFHC - Surface Mounted - Alumninum Housing Painted Safety Red,
Double Jacketed Fire Hose Alloy Material for Nozzle and Brass material for Valve and Fittings,
with security lock, 1/8 Thk. Clear Glass Panel, with Break Glass Hammer Alloy Body w/ Stainless Chain
a. FHC 2 set/s 0.68% 0.00% 0.00% 0.00% 0.00%
b. Fire Extinguisher 2 pc/s 0.06% 0.00% 0.00% 0.00% 0.00%
4.5 4th Floor
Fire Water Line
Supply and installation of black iron (B.I.) pipes sch. 40 including pipe fittings, painting, sleeves,
hangers and supports, sway braces and other miscellaneous items as shown and as required to
complete the system.
a. 150 mm dia. B.I. pipe sch. 40 6 lm 0.43% 0.00% 0.00% 0.00% 0.00%
b. 100 mm dia. B.I. pipe sch. 40 155 lm 5.44% 0.00% 0.00% 0.00% 0.00%
c. 80 mm dia. B.I. pipe sch. 40 4 lm 0.10% 0.00% 0.00% 0.00% 0.00%
d. 40 mm dia. B.I. pipe sch. 40 (for FHC Line) 27 lm 0.30% 0.00% 0.00% 0.00% 0.00%
e. 32 mm dia. B.I. pipe sch. 40 41 lm 0.40% 0.00% 0.00% 0.00% 0.00%
f. 25 mm dia. B.I. pipe sch. 40 367 lm 1.86% 0.00% 0.00% 0.00% 0.00%
Supply and Installation of Sprinkler System
a. Upright Fire Sprinkler 104 pc/s 0.75% 10.00% 0.07% 10.00% 0.07%
b. Pendent Fire Sprinkler 1 set/s 0.01% 0.00% 0.00% 0.00% 0.00%
Fire Hose Cabinets
Supply and Installation of EFHC - Surface Mounted - Alumninum Housing Painted Safety Red,
Double Jacketed Fire Hose Alloy Material for Nozzle and Brass material for Valve and Fittings,
with security lock, 1/8 Thk. Clear Glass Panel, with Break Glass Hammer Alloy Body w/ Stainless Chain
a. FHC 2 set/s 0.68% 0.00% 0.00% 0.00% 0.00%
b. Fire Extinguisher 2 pc/s 0.06% 0.00% 0.00% 0.00% 0.00%
4.6 5th Floor
Fire Water Line
Supply and installation of black iron (B.I.) pipes sch. 40 including pipe fittings, painting, sleeves,
hangers and supports, sway braces and other miscellaneous items as shown and as required to
complete the system.
a. 150 mm dia. B.I. pipe sch. 40 6 lm 0.44% 0.00% 0.00% 0.00% 0.00%
b. 100 mm dia. B.I. pipe sch. 40 155 lm 5.44% 0.00% 0.00% 0.00% 0.00%
c. 80 mm dia. B.I. pipe sch. 40 4 lm 0.10% 0.00% 0.00% 0.00% 0.00%
d. 40 mm dia. B.I. pipe sch. 40 (for FHC Line) 27 lm 0.30% 0.00% 0.00% 0.00% 0.00%
e. 32 mm dia. B.I. pipe sch. 40 41 lm 0.40% 0.00% 0.00% 0.00% 0.00%
f. 25 mm dia. B.I. pipe sch. 40 367 lm 1.86% 0.00% 0.00% 0.00% 0.00%
Supply and Installation of Sprinkler System
a. Upright Fire Sprinkler 104 pc/s 0.75% 0.00% 0.00% 0.00% 0.00%
b. Pendent Fire Sprinkler 1 set/s 0.01% 0.00% 0.00% 0.00% 0.00%
Fire Hose Cabinets
Supply and Installation of EFHC - Surface Mounted - Alumninum Housing Painted Safety Red,
Double Jacketed Fire Hose Alloy Material for Nozzle and Brass material for Valve and Fittings,
with security lock, 1/8 Thk. Clear Glass Panel, with Break Glass Hammer Alloy Body w/ Stainless Chain
a. FHC 2 set/s 0.68% 0.00% 0.00% 0.00% 0.00%
b. Fire Extinguisher 2 pc/s 0.06% 0.00% 0.00% 0.00% 0.00%
4.7 6th Floor
Fire Water Line
Supply and installation of black iron (B.I.) pipes sch. 40 including pipe fittings, painting, sleeves,
hangers and supports, sway braces and other miscellaneous items as shown and as required to
complete the system.
a. 150 mm dia. B.I. pipe sch. 40 6 lm 0.44% 0.00% 0.00% 0.00% 0.00%
b. 100 mm dia. B.I. pipe sch. 40 155 lm 5.44% 0.00% 0.00% 0.00% 0.00%
c. 80 mm dia. B.I. pipe sch. 40 4 lm 0.10% 0.00% 0.00% 0.00% 0.00%
d. 40 mm dia. B.I. pipe sch. 40 (for FHC Line) 27 lm 0.30% 0.00% 0.00% 0.00% 0.00%
e. 32 mm dia. B.I. pipe sch. 40 41 lm 0.40% 0.00% 0.00% 0.00% 0.00%
f. 25 mm dia. B.I. pipe sch. 40 367 lm 1.86% 0.00% 0.00% 0.00% 0.00%
Supply and Installation of Sprinkler System
a. Upright Fire Sprinkler 104 pc/s 0.75% 0.00% 0.00% 0.00% 0.00%
b. Pendent Fire Sprinkler 1 set/s 0.01% 0.00% 0.00% 0.00% 0.00%
Fire Hose Cabinets
Supply and Installation of EFHC - Surface Mounted - Alumninum Housing Painted Safety Red,
Double Jacketed Fire Hose Alloy Material for Nozzle and Brass material for Valve and Fittings,
with security lock, 1/8 Thk. Clear Glass Panel, with Break Glass Hammer Alloy Body w/ Stainless Chain
a. FHC 2 set/s 0.68% 0.00% 0.00% 0.00% 0.00%
b. Fire Extinguisher 2 pc/s 0.06% 0.00% 0.00% 0.00% 0.00%
4.8 7th Floor
Fire Water Line
Supply and installation of black iron (B.I.) pipes sch. 40 including pipe fittings, painting, sleeves,
hangers and supports, sway braces and other miscellaneous items as shown and as required to
complete the system.
a. 150 mm dia. B.I. pipe sch. 40 6 lm 0.44% 0.00% 0.00% 0.00% 0.00%
b. 100 mm dia. B.I. pipe sch. 40 155 lm 5.44% 0.00% 0.00% 0.00% 0.00%
c. 80 mm dia. B.I. pipe sch. 40 4 lm 0.10% 0.00% 0.00% 0.00% 0.00%
d. 40 mm dia. B.I. pipe sch. 40 (for FHC Line) 27 lm 0.30% 0.00% 0.00% 0.00% 0.00%
e. 32 mm dia. B.I. pipe sch. 40 41 lm 0.40% 0.00% 0.00% 0.00% 0.00%
f. 25 mm dia. B.I. pipe sch. 40 367 lm 1.86% 0.00% 0.00% 0.00% 0.00%
Supply and Installation of Sprinkler System
a. Upright Fire Sprinkler 104 pc/s 0.75% 0.00% 0.00% 0.00% 0.00%
b. Pendent Fire Sprinkler 1 set/s 0.01% 0.00% 0.00% 0.00% 0.00%
Fire Hose Cabinets
Supply and Installation of EFHC - Surface Mounted - Alumninum Housing Painted Safety Red,
Double Jacketed Fire Hose Alloy Material for Nozzle and Brass material for Valve and Fittings,
with security lock, 1/8 Thk. Clear Glass Panel, with Break Glass Hammer Alloy Body w/ Stainless Chain
a. FHC 2 set/s 0.68% 0.00% 0.00% 0.00% 0.00%
b. Fire Extinguisher 2 pc/s 0.06% 0.00% 0.00% 0.00% 0.00%
Sub-total 4
V. MECHANICAL / HVAC WORKS
5.2 FANS AND BLOWERS
Exhaust Fans
Supply and installation of exhaust fans complete with all necessary supports, accessories,
electrical wires, conduits, controls, and other materials as shown and as required to complete
the system
a. 90 CFM, Wall Mounted Exhaust Fan, Direct Driven 1 set/s 0.25% 0.00% 0.00% 0.00% 0.00%
b. 50 CFM, Wall Mounted Exhaust Fan, Direct Driven 12 set/s 1.84% 0.00% 0.00% 0.00% 0.00%
HVAC Ducts and Casings
Fresh Air Duct
Supply and installation of galvanized iron (G.I.) duct, complete with accessories, supports,
hangers, and other miscellaneous items as shown and as required to complete the system
a. Ga. 22 28 sq.m 0.89% 0.00% 0.00% 0.00% 0.00%
Exhaust Air Duct
Supply and installation of galvanized iron (G.I.) duct, complete with accessories, supports,
hangers, and other miscellaneous items as shown and as required to complete the system
a. Ga. 22 28 sq.m 0.89% 0.00% 0.00% 0.00% 0.00%
5.3 Air Nozzle
Supply and installation of Air Nozzle complete all necessary supports, accessories,
electrical wires, conduits, controls, and other materials as shown and as required to complete
the system
a. Air Nozzle 12 set/s 0.35% 0.00% 0.00% 0.00% 0.00%
5.4 Air Nozzle Pipes
Supply and installation of air nozzle pipes and fittings complete with accessories, supports,
hangers, and other miscellaneous items as shown and as required to complete the system
a. 32 mm dia 12 lm 0.12% 0.00% 0.00% 0.00% 0.00%
b. 25 mm dia 84 lm 0.68% 0.00% 0.00% 0.00% 0.00%
c. 15 mm dia 93 lm 0.68% 0.00% 0.00% 0.00% 0.00%

Sub-total 5 PREVIOUS TODAY


100.00% 7.78% 17.40%