Work Permit - Science Playzone

The document is a work permit for renovations at Science Play Zone Trading Corp. in Pieceland Corporation, detailing the scope of work, which includes demolition, drywall installation, plumbing, electrical works, and furniture installation. It lists the workers involved, tools and materials required, and specifies the work duration from September 23, 2024, to October 23, 2024, with a total of 30 working days. The permit includes approval sections for various departments and notes that it can be revoked for violations of the approved plans.

Uploaded by

carldandyprimo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
111 views5 pages

Work Permit - Science Playzone

The document is a work permit for renovations at Science Play Zone Trading Corp. in Pieceland Corporation, detailing the scope of work, which includes demolition, drywall installation, plumbing, electrical works, and furniture installation. It lists the workers involved, tools and materials required, and specifies the work duration from September 23, 2024, to October 23, 2024, with a total of 30 working days. The permit includes approval sections for various departments and notes that it can be revoked for violations of the approved plans.

Uploaded by

carldandyprimo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PIECELAND CORPORATION

MARVIN PLAZA BUILDING , 2153 Chino Roces Ave, Maka City


Telephone no. (+632) 846-119 loc. 109
EMERGENCY PERMIT NUMBER:
WORK PERMIT MINOR WORKS
MAJOR WORKS
TENANT: UNIT: AUTOHORIZED REPRESENTATIVE:
L6
SCIENCE PLAY ZONE TRADING CORP. JOJIE BARTOLOME

Nature of work: NOTE:

renova on
HOTWORKS A Fire Ex nguisher and pail of water should be
placed at all mes beside the MAPP Gas.
SCOPE OF WORK:
1. Demoli on Of Exis ng Wall, Flooring and Ceiling
2. Transporta on Of Construc on Materials
3. Hauling Of Debris
4. Dry Wall Works
a. Installa on Of Concrete Zocalo for Toilet Par on
b. Installa on Of Dry Wall Frame
c. Waterproofing Of Concrete (using Membrane Type
water Proofing / tes ng for 24 Hours)
d. Installa on of Gypsum Board
e. Installa on of Acous c Mineral Wool for Sound
Proofing (ACCU Room)
f. Installa on of PVC Panel on Walls
5. Ceiling Works
a. Prep for Ceiling and installa on of temp Plas c
Par on
b. Pain ng of Ceiling (using Airless Paint Spryer)
6. Toilet Works
a. Installa on Of Concrete Zocalo for Toilet Par on
b. Waterproofing Of Concrete (using cemen ous
waterproofing / tes ng for 24 Hours)
c. Installa on of Sewer, Vent and Water Pipes (tes ng
for 24 Hours)
d. Installa on Of Insulated Flooring and Concrete
Floor
e. Waterproofing Of Concrete (using cemen ous
waterproofing / tes ng for 24 Hours)
f. Installa on Of Dry Wall (Using Hardiflex/Concrete
Board)
g. Installa on Of Floor and Wall Tiles
h. Installa on Of Toilet Ceiling (Using MR Gypsum
Board)
7. Kitchen
a. Installa on Of Concrete Zocalo for Kitchen Table
b. Installa on of kitchen modular Cabinet
c. Installa on of PVC table top
d. Installa on of Kitchen Sink and Grease Trap
e. Installa on of back Slash
8. Glass Door
a. Installa on of Aluminum Door jamb
b. Installa on of Tempered Glass Door
c. Installa on of Finger Print / A endance with Door
Lock Access
d. Installa on of Transparent Smoke S cker
9. Data Cable
a. Installa on of Raceway, PVC pipes and Hanger
b. Installa on of Data Cable
c. Installa on of Data Cabinet
10. Electrical Works
a. Installa on of EMT pipes and hanger for Electrical
Rough-in
b. Installa on of Electrical wires
c. Installa on of Electrical Fixtures
d. Installa on of Breaker and Balancing of Electrical
Amperes.
e. Tes ng and Commissioning
11. Sign Board Works
a. Installa on of Back-Panel
b. Installa on of 3d Sign-Board
12. Mechanical Works
a. Installa on of Ceiling Casse e Type FCU
b. Installa on of ACCU and Hanger
c. Installa on of Copper Pipe and Insula on
d. Tes ng and Commissioning
13. FDAS and Fire Protec on
a. Installa on of Sole Type Smoke Detector
b. Installa on of Fire Ex nguisher
14. Sash Work
a. Installa on of Modular Cabinet
15. Furniture Installa on
a. Delivery of Office Furniture
b. Installing of Furnitures

NAME OF WORKERS:

 Regular and Alternate


1. Kenneth Tanalgo
2. Joseph Binaday
3. Nimrod Cacaldo
4. Rodel Ilagan
5. Darylle Herrera
6. Ismael Punjong
7. Jerald Dave Castro
8. Eric Ramos
9. Rhey Balington
10. Romeo Oracion
11. Price Baylon
12. Balong Felera
13. Jake Pasacan
14. Edison Ignacio
15. Jimmy Dan Niño
16. Paul Cacaldo
17. Kenneth Ibajan
18. Antonio Gomia
19. Jerry Asilum
20. Nick Wahingon
21. Rogelio Ebajan
 Special Contractor
1. Glass Installer
2. Cabinet Installer
3. Furniture Installer
ITEMIZED LIST OF TOOLS and MATERIALS:
1. Hand Tools
a. Hammer
b. Raw Bar
c. Screw and Philip Screw Drivers
d. Cu ng Tools ( Saw, Knife, etc.)
e. PPE Plas c Type and Gas Masks
f. Gun Tacker and Nail Gun
g. Furring Crimper
h. Trash Collec on bags and bins
i. Covering Sheets and Twine
2. Power Tools
a. Drill Bit – 5
b. Wireless Drill Bit – 5
c. Grinder – 5
d. Cutoff Machine – 2
e. Circular Saw – 3
f. Airless Spry Painter – Big – 1 / Small – 2
g. Hole Saw – 3
h. Glass Cleaner – 2
i. Data Monitoring Equipment – 1 set
j. Air Monitoring Equipment – 1 set
k. Mechanical Equipment – 1 set
l. Electric Fan - 3
m. Portable Ven la on Fan – 3
n. Pain ng Tools (Roller and Brush)
o. Volt/Amp Tester - 3
p. Merger Tester - 1
q. Impact Driver - 5
r. Miter Saw -1
s. Jig Saw - 1
t. Table Saw - 1
u. Oscilla ng Mul Tool – 3
v. Tile Cu er - 2
w. Leveler (Laser and Manual) - 5
x. Stud Finder - 1
y. Hammer Drill - 3
z. Heat Gun - 2
aa. Power Sander – 3
bb. Pneuma c Tools – 10
cc. Air Pump -1
dd. Wet/Dry Vacuum -4
ee. Tile Grout Float - 2
ff. Plunge Router - 3
gg. Dust Extractor - 2
hh. Digital Mul meter - 5
ii. Wire Stripper -3
jj. Fish Tape and Wire Puller - 4
kk. Ladder – 4
ll. Claps – 10
mm. Rivet gun - 5
nn. Chalk Line -4
oo. Studs and Drywall Li er -2
pp. Sanding Block -3
qq. Angle Finder - 3
rr. Emergency Tool Kit
ss. Portable Workbench – 1 set
. Joint Compound Mixer – 1
uu. Torch and Gas – 2 sets

Work Dura on: From 09/23/2024 To: 10/23/2024


Total Number of days: (Calendar Days) 30 days
Working hour(s): 6:00am to 6:00pm 6:00pm to 6:00am
Total number of personal to work for the project: at-list 30 person
Requested By: In Case of Contractor, Endorsed By:

Jojie Bartolome Larry Palafox


NAME NAME
DESIGNATION: OWNER DESIGNATION:
DATE: 09 26 2024 DATE:
RECOMMEDING APPROVALS APPROVED BY: FOR RELEASE
FINANCE / ACTG. DEPT. ENGINNERING DEPT. Received by:
CIVIL ELECTRICAL

BUILDING ADMINISTRATOR NAME


DATE DATE DATE DATE DATE

Note:
This work permit shall be revoked if viola ons are found on the implementa on of the approved plans, Validty of work
permit is dependent to updated account,

You might also like