4.PCC NE Footing

This document outlines the checklist for the Plain Cement Concrete activity by Arunoday Life Spaces Pvt Ltd, detailing the necessary steps and requirements before commencing work. It includes criteria for site preparation, compaction tests, earthing methodologies, and weather considerations. The checklist emphasizes the importance of adhering to approved drawings and recording various parameters throughout the process.

Uploaded by

smahesh615
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views1 page

4.PCC NE Footing

This document outlines the checklist for the Plain Cement Concrete activity by Arunoday Life Spaces Pvt Ltd, detailing the necessary steps and requirements before commencing work. It includes criteria for site preparation, compaction tests, earthing methodologies, and weather considerations. The checklist emphasizes the importance of adhering to approved drawings and recording various parameters throughout the process.

Uploaded by

smahesh615
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Version date:

Version No: 1.0

Arunoday Life Spaces Pvt Ltd Rev no & date RX / XX.XX.202X


Refference No: ALSPL/CVL/EXE/CHL/04
ACTIVITY - Plain Cement Concrete
PROJECT
Block Level: Checking Start date & time
Grid: Checking End date & time
Ref. Drg. Rev.No, date
Ref.Drg. Rev.No, date
SI No. Description Status
Remarks
Before (Site Er, QC Er.) YES NO NA
1 Work start only with approved GFC’s of above mentioned dwgs. Not with Advance copy?
Any overcut area if more than 150mm, filled & compacted again* Compaction test conducted
2 & pass?...Record compaction % here.....

Any overcut if less than l50mm, no need to fill again. Compact to existing level? Excess
3 height to be casted in column/wall . Any such situation exists*

In case of rains & slus h Form at bottom level of proposed PCC, no need to fill again. Excess
4 height to be casted in culumn/wall. Any such situation exits?

If compaction % is not achieved, as an alternate Wet mix macadam to be used, onIy for area
5 not exceeding 20m2 Any such situation exists ?

If above alternates are not possihle. Discuss & record here the alternate methcd
6 adoped...................................................

Filled up soil in basemen ts, tes ted far coltpaction & passed in test. Record compac tion R<
7 here....
For basement floor PCC, soil filled up & compacted in slope of 1:200 from high point ridge to
8 low point(drain/chamber) or as per dwg*
Check earthing methodology adopt ed. If mat earthing, is it provided as per dwg? (Metal
9 members can be primed but not painted)

10 Check earthing methcdology adopted. I( conventional earthing, block outs provided?


Record Seria| No. & calibration validity of Total Station used for marking Footing/PCC
11 corners...............

12 Footing/raft Survey coordinates cross checked in Autocad by QC Er? Survey Records


generated ?

Mark ings given by Surveyor at site checked randomIy min. 04 points each in Fore noon &
13 After noon by both Site Er, QC Er & counter signed in survey records ?

14 Demarcat'on done for not pouring PCC in drain/chamber locations as per Method statement
15 PCC outer line secured with runner/chan nela.
Level pads/button marks provided either by making button marks with concrete or by driving
16 steel pegs with 01" tape at bottom of peg. Min. 05nos for footing/raft @ spacing not more
than 2.0m c/c
17 Individual button mark thickness captured in dwg & attached here? Record avg. thickness......
18 Polythene sheet provided over proposed PCC area

19 Rain water/Podium Floor Drain Points(FDP) sleeves routeo to surface drains?


20 Weather forecast checked & taurpalin kept at pour area, if there is rain prediction?
21 Quantity of concrete required & grade? Record here....,...... ..,....................................,............

Pour plan attached with contractor & workmen details? Proposed pour area in hatch, grid
22 marks attached/men I to ba Aching plan t with this checklist

Signature of Supervisor Signature of Site Engineer Signature of Manager