Refference No: ALSPL/CVL/EXE/CHL/04
ACTIVITY - Plain Cement Concrete
PROJECT
Block Level: Checking Start date & time
Grid: Checking End date & time
Ref. Drg. Rev.No, date
Ref.Drg. Rev.No, date
SI No. Description Status
Remarks
Before (Site Er, QC Er.) YES NO NA
1 Work start only with approved GFC’s of above mentioned dwgs. Not with Advance copy?
Any overcut area if more than 150mm, filled & compacted again* Compaction test conducted
2 & pass?...Record compaction % here.....
Any overcut if less than l50mm, no need to fill again. Compact to existing level? Excess
3 height to be casted in column/wall . Any such situation exists*
In case of rains & slus h Form at bottom level of proposed PCC, no need to fill again. Excess
4 height to be casted in culumn/wall. Any such situation exits?
If compaction % is not achieved, as an alternate Wet mix macadam to be used, onIy for area
5 not exceeding 20m2 Any such situation exists ?
If above alternates are not possihle. Discuss & record here the alternate methcd
6 adoped...................................................
Filled up soil in basemen ts, tes ted far coltpaction & passed in test. Record compac tion R<
7 here....
For basement floor PCC, soil filled up & compacted in slope of 1:200 from high point ridge to
8 low point(drain/chamber) or as per dwg*
Check earthing methodology adopt ed. If mat earthing, is it provided as per dwg? (Metal
9 members can be primed but not painted)
10 Check earthing methcdology adopted. I( conventional earthing, block outs provided?
Record Seria| No. & calibration validity of Total Station used for marking Footing/PCC
11 corners...............
12 Footing/raft Survey coordinates cross checked in Autocad by QC Er? Survey Records
generated ?
Mark ings given by Surveyor at site checked randomIy min. 04 points each in Fore noon &
13 After noon by both Site Er, QC Er & counter signed in survey records ?
14 Demarcat'on done for not pouring PCC in drain/chamber locations as per Method statement
15 PCC outer line secured with runner/chan nela.
Level pads/button marks provided either by making button marks with concrete or by driving
16 steel pegs with 01" tape at bottom of peg. Min. 05nos for footing/raft @ spacing not more
than 2.0m c/c
17 Individual button mark thickness captured in dwg & attached here? Record avg. thickness......
18 Polythene sheet provided over proposed PCC area
19 Rain water/Podium Floor Drain Points(FDP) sleeves routeo to surface drains?
20 Weather forecast checked & taurpalin kept at pour area, if there is rain prediction?
21 Quantity of concrete required & grade? Record here....,...... ..,....................................,............
Pour plan attached with contractor & workmen details? Proposed pour area in hatch, grid
22 marks attached/men I to ba Aching plan t with this checklist
Signature of Supervisor Signature of Site Engineer Signature of Manager