DELHI ENGINEERING SOLUTION
A-43 Ramdutt Enclave ,Uttam Nagar, New Delhi-110059
Project: Experion the Heartsong Sector 108
NO. STANDARD CHECK REMARKS
A PRE-PLASTERING PREPARATION
1 Setting out as per base reference line/drawing Y N NA
2 Sufficient level pegs provided and wall alignment is acceptable Y N NA
3 All first fixed joinery items are fixed accordingly Y N NA
4 All concealed M&E services are complete and ready. M&E Y N NA
Engineer confirmed to proceed
5 Protection provided to installed components/ finishes Y N NA
6 Wire mesh provided between RC structure and brickwork Y N NA
7 Mortar spread on the walls yet to be plastered is cleaned Y N NA
8 Architectural items such as corner beads, U-grooves, copings and Y N NA
sides of jamb are completed prior to plastering work
9 All finished works are well protected prior to plastering work Y N NA
10 Checked wall's moisture content is acceptable and ensured Y N NA
wetting of substrate before plastering, use Moisture Meter
B CEMENT MORTAR MIXING & DURING PLASTERING
1 Correct and clean sand material is used with plastering cement Y N NA
mortar mix ratio as per specification
2 Adequate lighting provided at work area Y N NA
3 Verticality and minimum thickness for plastering is maintained Y N NA
4 Where applicable, cement slurry or lime finish is done after all N NA
minor unevenness is covered by rough finish in thin layers
5 Plastering is started from the top and gradually worked Y N NA
downwards to the floor
6 Mortar is consumed within the initial setting time for cement of Y N NA
not more than 30 minutes
7 Plaster is roughened with stick broom/brush for area where Y N NA
second layer of plaster is specified
8 Edges/corners of all doors/windows opening are completed along Y N NA
with plastering
9 Grooves provided as per drawings otherwise at the junction of Y N NA
two different materials with prior approval from OIC
10 For joint to be left, it is cut straight with edges chamfered Y N NA
11 Curing started 12 hours after plastering Y N NA
C FINAL PLASTERING FINISHES
1 Visually acceptable smooth surface with no scratches Y N NA
2 Checked the evenness, line, plumb etc., using straight edge with Y N NA
respect to button marks
3 All button marks are carefully removed and properly finished Y N NA
after all checking
4 Checked there is no surface damage or cracks and surface is free Y N NA
from major defects
Signature of Site Engineer Signature of EDPL