NTPC LTD. SIPAT Submitted for the Partial fulfillment of the requirement for the award of the degree of Master of Business Administration (MBA)
2011 DEPARTMENT OF MANAGEMENT STUDIES GURU GHASIDAS VISHWAVIDYALAYA, BILASPUR (C.G.)495009 (A Central University)
DECLARATION
I, Namrata Gupta, a student of MBA II Semester in the year 2010-2011 (Roll No.) hereby declare that, I have undergone training at NTPC Ltd. SIPAT, Bilaspur (C.G.). This report is an original work carried out by me and the report has not been submitted to any other University for the award of any degree or diploma.
Date: Place:
PREFACE
MBA is a stepping stone to management career. In order to achieve practical, positive and concrete results, the classroom learning need to be effectively fed to the realities of the situation existing outside the classroom. This is practically true for management. Human resource is one of the interesting subject which is back bone of every organization. To develop healthy managerial and administrative skills in the potential managers it is necessary that theoretical knowledge must be supplemented with exposure of real environment. Actually it is very vital for the management and it is in the practical training that the measuring of management is itself realized. The report on Employee Benefits at NTPC Ltd. SIPAT is a study about the benefit practices prevailing in NTPC Ltd. to boost the morale of employees and to develop a sense of belongingness and security among them and thereby motivating them to contribute to the attainment of the objectives of the organization.
ACKNOWELDGEMENT
I am truly thankful to all the faculties / guides who imparted the lectures on various subjects/ topics and took us to the plant in a guided study visit along with detailed explaining about the plant and machinery. I specially would like to thank Mr. Wilson Abraham (Manager HR), Mr. N. Surenthiran (Sr. Officer HR), Mr. Abhishek Gupta (ET), Mr.Alok Ranveer (Manager HR) and Mr. Virendra Pratap (Sr. Officer HR) without them I would not have completed my project successfully. I would also like to thank the human resource department / employee development for permitting and organizing the training program for us.
CONTENTS
1. 2. 3. 4. 5. 6. 7. 8. 9.
INTRODUCTION TO NTPC LTD. VISSION AND MISSION OVERVIEW POWER GENERATION AT NTPC DIVERSIFIED GROWTH SUBSIDIARIES FUTURE CAPACITY ADDITIONS NTPC LTD. SIPAT HRM AT NTPC LTD. 22
1 2 3 4 8 10 12 20
26 28 29 29 35 36 39 43 49 53 64 66
69 70
Type Traded as
Electricity 50,188.52 crore (US$11.19 billion)(2010) 8,837.65 crore (US$1.97 billion)(2010) 25,944 (2010) www.ntpc.co.in
Mission
Develop and provide reliable power, related products and services at competitive prices, integrating multiple energy sources with innovative and eco-friendly technologies and contribute to society.
Business Ethics Customer Focus Organizational & Professional Pride Mutual Respect & Trust Innovation & Speed Total Quality for Excellence
OVERVIEW
Indias largest power company, NTPC was set up in 1975 to accelerate power development in India. NTPC is emerging as a diversified power major with presence in the entire value chain of the power generation business. Apart from power generation, which is the mainstay of the company, NTPC has already ventured into consultancy, power trading, ash utilisation and coal mining. NTPC ranked 341st in the 2010, Forbes Global 2000 ranking of the Worlds biggest companies. NTPC became a Maharatna company in May, 2010, one of the only four companies to be awarded this status.
The total installed capacity of the company is 34,854 MW (including JVs) with 15 coal based and 7 gas based stations, located across the country. In addition under JVs, 5 stations are coal based & another station uses naphtha/LNG as fuel. The company has set a target to have an installed power generating capacity of 1,28,000 MW by the year 2032. The capacity will have a diversified fuel mix comprising 56% coal, 16% Gas, 11% Nuclear and 17% Renewable Energy Sources(RES) including hydro. By 2032, non fossil fuel based generation capacity shall make up nearly 28% of NTPCs portfolio. NTPC has been operating its plants at high efficiency levels. Although the company has 17.75% of the total national capacity, it contributes 27.40% of total power generation due to its focus on high efficiency. In October 2004, NTPC launched its Initial Public Offering (IPO) consisting of 5.25% as fresh issue and 5.25% as offer for sale by Government of India. NTPC thus became a listed company in November 2004 with the Government holding 89.5% of the equity share capital. In February 2010, the Shareholding of Government of India was reduced from 89.5% to 84.5% through Further Public Offer. The rest is held by Institutional Investors and the Public.
NTPC Limited is divided in 8 Head Quarters Sr. No. HEADQUARTER CITY 1 2 3 4 5 6 7 8 NCRHQ ER-I, HQ ER-II, HQ NRHQ SR HQ WR-I HQ Hydro HQ WR-II HQ Delhi Patna Bhubaneswar Lucknow Hyderabad Mumbai Delhi Raipur
POWER BURDEN
India, as a developing country is characterized by increase in demand for electricity and as of moment the power plants are able to meet only about 6075% of this demand on an yearly average. The only way to meet the requirement completely is to achieve a rate of power capacity addition (implementing power projects) higher than the rate of demand addition. NTPC strives to achieve this and undoubtedly leads in sharing this burden on the country.
COAL
BASED(Owned
by NTPC) 1. Singrauli 2. Korba 3. Ramagundam 4. Farakka 5. Vindhyachal 6. Rihand 7. Kahalgaon 8. NCTPP, Dadri 9. Talcher Kaniha 10. Feroze Gandhi, Unchahar 11. Talcher Thermal 12. Simhadri 13. Tanda 14. Badarpur 15. Sipat Total
STATE Uttar Pradesh Chhattisgarh Andhra Pradesh West Bengal Madhya Pradesh Uttar Pradesh Bihar Uttar Pradesh Orissa Uttar Pradesh Orissa Andhra Pradesh Uttar Pradesh Delhi Chhattisgarh
COMMISSIONED CAPACITY(MW) 2,000 2,600 2,600 2,100 3,260 2,000 2,340 1,820 3,000 1,050 460 1,500 440 705 1,660 27,535
2. Auraiya 3. Kawas 4. Dadri 5. Jhanor-Gandhar 6. Rajiv Gandhi CCPP Kayamkulam 7. Faridabad Total
GAS BASED JOINT VENTURES: COAL BASED STATE Maharashtra COMMISSIONED CAPACITY 1940 1940
HYDRO BASED POWER PROJECTS (Under Implementation) NTPC has increased thrust on hydro development for a balanced portfolio for long term sustainability. The first step in this direction was taken by initiating investment in Koldam Hydro Electric Power Project located on Satluj river in Bilaspur district of Himachal Pradesh. Other hydro project under construction is Tapovan Vishnugad. On all these projects construction activities are in full swing.
HYDRO BASED
STATE
1. Koldam (HEPP) Himachal Pradesh 2. Tapovan Vishnugad (HEPP) Uttarakhand Singrauli CW Discharge(Small 3. Uttar Pradesh Hydro) Total
DIVERSIFIED GROWTH
As per new corporate plan, NTPC plans to become a 75 GW company by the year 2017 and envisages to have an installed capacity of 128 GW by the year 2032 with a well diversified fuel mix comprising 56% coal, 16% gas, 11% nuclear energy, 9% renewable energy and 8% hydro power based capacity. As such, by the year 2032, 28% of NTPCs installed generating capacity will be based on carbon free energy sources. Further, the coal based capacity will increasingly be based on high-efficient-low-emission technologies such as Super-critical and Ultra-Super-critical. Along with this growth, NTPC will utilize a strategic mix of options to ensure fuel security for its fleet of power stations. Looking at the opportunities coming its way, due to changes in the business environment, NTPC made changes in its strategy and diversified in the business adjacencies along the energy value chain. In its pursuit of diversification NTPC has developed strategic alliances and joint ventures with leading national and international companies. NTPC has also made long strides in developing its Ash Utilization business.
HYDRO POWER: In order to give impetus to hydro power growth in the country and
to have a balanced portfolio of power generation, NTPC entered hydro power business with the 800 MWs Koldam hydro project in Himachal Pradesh. Two more projects have also been taken up in Uttarakhand. A wholly owned subsidiary, NTPC Hydro Ltd., is setting up hydro projects of capacities up to 250 MW.
RENEWABLE ENERGY: In order to broad base its fuel mix NTPC has plan of
capacity addition of about 1,000 MW through renewable resources by 2017.
COAL MINING: In a major backward integration move to create fuel security, NTPC
has ventured into coal mining business with an aim to meet about 20% of its coal requirement from its captive mines by 2017. The Government of India has so far allotted 7 coal blocks to NTPC, including 2 blocks to be developed through joint venture route.
POWER TRADING: 'NTPC Vidyut Vyapar Nigam Ltd.' (NVVN), a wholly owned
subsidiary was created for trading power leading to optimal utilization of NTPCs assets. It is the second largest power trading company in the country. In order to facilitate power trading in the country, National Power Exchange Ltd., a JV of NTPC, NHPC, PFC and TCS has been formed for operating a Power Exchange.
ASH BUSINESS: NTPC has focused on the utilization of ash generated by its power
stations to convert the challenge of ash disposal into an opportunity. Ash is being used as a raw material input by cement companies and brick manufacturers. NVVN is engaged in the business of Fly Ash export and sale to domestic customers. Joint ventures with cement companies are being planned to set up cement grinding units in the vicinity of NTPC stations.
SUBSIDIARIES
To take over Muzaffarpur Thermal Power Station (2*110MW), a subsidiary company named Vaishali Power Generating Company Limited (VPGCL) was incorporated on September 6, 2006 with NTPC contributing 51% of equity and balance equity was contributed by Bihar State Electricity Board. This company was formed to renovate the existing unit and run the plant. The second unit has been successfully re-synchronised on October 17, 2007 after 4 years of being idle. Renovation and modernisation of the first unit is under progress. The company was rechristened as Kanti Bijlee Utpadan Nigam Limited on April 10, 2008.
8. Rihand III(2X500) 9. Vindhyachal-IV (2X500) 10. Muzaffarpur Expansion (2x195) JV with BSEB 11. Nabinagar TPP-JV with Railways (4 x 250) 12. Barh II (2 X 660) 13. Barh I (3 X 660) Hydro 1. Koldam HEPP ( 4 x 200) 2. Tapovan Vishnugad HEPP (4 x 130) 3. Singrauli CW Discharge(Small Hydre) Total
Uttar Pradesh Madhya Pradesh Bihar Bihar Bihar Bihar Himachal Pradesh Uttarakhand Uttar Pradesh
NTPC Sipat is located 22 Kms from the city of Bilaspur, Chattisgarh. NTPC Sipat is situated in Sipat Village which comes under the jurisdiction of Sipat Kotwali Police Station. The following are the major facts about NTPC Sipat:-
Capacity
: :
Dipika Mines of SECL Korba. By dedicated Merry Go Round System (Approx 42KM)
Source Water
Higher Thermal Efficiency of Boiler over consumption Conservation of Natural Resources& Ecology.
State of the Art Technology for Environment Management. ESP with high efficiency of 99.98% 275 meter High Chimney. 100 meter wide green belt around the project site. Sub-merged ash dyke. Plantation of 15 lakh trees on different stages.
Land acquired:
Private 2282 acres + Govt. 2050 acres = Total 4332 acres
GUJRAT MADHYA PRADESH CHHATISGARH RAILWAYS GOA DAMAN AND DIU DADRA AND NAGAR HAVELI UNALLOCATED Total
State-run power major NTPC has started the first super critical 660 MW (not commercialized) unit at Sipat plant in Chhattisgarh. The plant, located in Bilaspur, has an installed capacity of 2,980 MW. With the commissioning of 660 MW, NTPC's installed capacity has increased to 34,854 MW, while the total operational capacity at Sipat plant is now 1,660 MW. The Sipat project has three units of 660 MW in stage I and 2 units of 500 MW in stage II, which are already operational. "The project shall have an installed capacity of 2,980 MW on completion of both the stages. NTPC has an operational capacity of over 8,000 MW in Western Region and work is progressing for over 4,000 MW capacity at Mouda, Vindhyachal, Sipat and Solapur. According to the statement given by the company, the company is focused on introduction of high efficiency supercritical and ultra super-critical coal-based power plants. The entity has floated tenders for 9 units each of 660 MW and 800 MW for its upcoming projects in 12th plan. "These supercritical units will achieve much higher generation efficiency and are critical components of NTPC's low carbon growth strategy," it added. The NTPC official said the Chhattisgarh government has begun supplying 120 million cusecs of water from its Hasdev Bango canal. This will continue for three years and in return the company would pay Rs.720 million annually to Chhattisgarh as water tax. In the meantime, the Central Water Commission will do a survey and submit the feasibility report for construction of an anicut on river Mahanadi, about 50 km from Sipat, to help the NTPC find a permanent solution to its water problems.
and growth of all its employees as individuals and not just as employees. Currently NTPC employ approximately 26,000 people . Competence building, Commitment building, Culture building and Systems building are the four building blocks on which its HR systems are based.
NTPCS HR VISION
"To enable our people to be a family of committed world class professionals."
RECRUITMENT
NTPC believes in the philosophy of 'Grow your own timber'. Its 'Executive Trainee' scheme was introduced in 1977 with the objective of raising a cadre of home grown professionals. First Division Graduate Engineers/ Post graduates are hired through nationwide open competitive examinations and campus recruitments. Hiring is followed by 52 weeks of fully paid induction training.
management system comprises PERFORMANCE MANAGEMENT, CAREER PATHS and LEADERSHIP DEVELOPMENT.
QUALITY OF WORK-LIFE
NTPC is proud of its systems for providing a good quality of work-life for its employees. In addition to providing beautiful and safe work places, NTPC encourages a culture of mutual respect and trust amongst peers, superiors and subordinates. Away from hectic city life, NTPC townships provide an environment of serenity, natural beauty and close community living. Numerous welfare and recreation facilities including schools, hospitals and clubs are provided at the townships to enhance quality of life & the well being of employees and their families. An entire range of benefits, from child care leave to post retirement medical benefits are extended to employees to meet any exigency that may arise in a person's life.
knowledge in the form of learning and experiences of employees to be captured and summarized for future reference.
SEEKING FEEDBACK
NTPC actively seek and encourage employee feedback to ensure that its HR interventions and practices remain relevant and meaningful. IT regularly conducts Employee Satisfaction and Organizational Climate Surveys.
AWARDS
NTPC derives immense satisfaction from the awards it receives and the resulting recognition they bestow. The awards are key indicators and milestones on its HR journey, and reinforce its HR philosophy and practices. NTPC has been awarded No.1, Best Workplace in India among large organizations for the year 2010, by the Great Places to Work Institute, India Chapter in collaboration with The Economic Times. The concept of
Corporate Social Responsibility is deeply ingrained in NTPC's culture. Through its expansive CSR initiatives, NTPC strives to develop mutual trust with the communities that surround its power stations.