You are on page 1of 5

Level 1 Level 2

1.

3xy
4
9x
5
y
2
=

1
3x
4
y
2
1.

32 2t
2
t
2
8t +16
=

8 t
t 4





2.

15a
2
b
4
25a
3
b
2
5a
2
b
2
=

3b
2
5a 2.

10x
2
25xy +15y
2
7x
2
+ 7xy 14y
2
=nothing cancels





3.

x
4
4x
2
x
3
+2x
2
=

x 2 3.

a
2
b
2
ab

a
2
2ab+b
2
2a
2
b
=

2a
2
2ab
a b







4.

x
2
2x 35
2x
3
3x
2
-
4x
3
9x
7x 49
= 4.

6x
2
+2x 4
5x
-
10x +20x
2
1 4x
2
=



(x +5)(2x +3)
7x


4(3x 2)(x +1)
12x





5.

m
3
mn
2
4m+ 4n
-
2mn +2n
2
n
2
m nm
2
= 5.

x
3
+ x
2
xy
2
y
2
x
2
2xy + y
2
-
xy + y
2
x
2
y +2xy + y
=



m n
2


(x + y)
2
(x y)( x +1)






Level 3 Level 4


1.

5ax
2
30ax 35a
15a
2
x 105a
2
= 1.

6a
2
6b
2
4a
2
+ 8ab + 4b
2
=



x +1
3a


3a 3b
2(a+b)



2.

6r
2
18r
9r
2
+6r 24
-
12r 16
4r
3
12r
2
= 2.

6y
2
y
2
9

3y
2
2y
2
+ 7y + 3
=



2
r(r +2)


4y +2
y 3



3.

4x
2
11x +6
48x
2
27
-
4x
2
9x 9
6 3x
= 3.

xz xw +2yz 2yw
z
2
w
2
-
4z + 4w + xz + wx
16 x
2
=



x +3
9


x +2y
4 x



4.

8t
5
t
2
25

4t
2
7t
2
34t 5
= 4.

x
2
x 12
x
2
2x 15
x
2
+8x +12
x
2
5x 14
=



2t
3
(7t +1)
t +5


x
2
11x +28
(x 5)(x +6)



5.

y
2
y 6
y
2
5y 14
y
2
+ 6y + 5
y
2
6y 7
= 5.

x 4
( )
2
x
2
5x + 4
-
3x
2
+8x 11
5x
2
19x 4
=



y 3
y + 5


3x +11
5x +1


Level 5 Level 6

1.

3a
2
5ab 12b
2
3ab+ 4b
2
3b
2
ab
( )
= 1.

xy -
y
2
4xy
y x

16x
2
y
2
y
4
4x
2
3xy y
2
=


1
b
2


x


2.

4y
2
+ 2y 3
5y +1

3y
2
2y 4
5y +1
= 2.

4
x
+
8
x
2
=



y
2
+ 4y +1
5y +1


4x +8
x
2




3.

x + y
xy
2
+
3x + y
x
2
y
= 3.

3a
4a 20
+
9a
6a 30
=



x
2
+ 4xy + y
2
x
2
y
2


9a
4(a 5)



4.

7
x
2
+ x 2

5
x
2
4x + 3
= 4.

3
m
2
m

5
2m 2
=




2x 31
(x +2)(x 1)(x 3)


6 5m
2m(m 1)



5.

1+
2
x
3
4
= 5.

3
a
1
a

1
3a
=



4x +8
3x


9
2




Level 7 Level 8


1.

x
x 1
+
1
1 x
= 1.

2
x + 5
+
3
4x
=

1

11x +15
4x(x +5)




2.

3
k 1
( )
2

2
3k 3
= 2.

3x 2
4x
2

3x +1
6x
=


112k
3(k 1)
2


6x
2
+ 7x 6
12x
2


3. Solve:

3
4x
+
5
x
=1 3. Solve:

x 1
x 5
=
4
x 5



x =
23
4


C

4. Solve:

5
y 3

30
y
2
9
=1 4. Solve:

x
2
x
2
4
=
x
x +2
+
2x
x 2



y =2

x =0,1


5. Company A can install chairs in a 5. Kristen can type a paper in 8 hours.
theatre in 10 hrs. Company B can install Last month Kristen and Courtney, together,
them in 15 hrs. The owner of the theatre typed the paper in 6 hours. How long would
wants the chairs installed in less than it take Courtney to type the paper on her own?
8 hours. If the companies worked
together, can they install the chairs on
time?

Yes, it will take them 6 hours. 24 hours

Level 9 Level 10

1.

4
1
x
2
2
1
x
= 1.

x
y

y
x
1
y
+
1
x
=


2x +1
x


x y

2.

x +1
x +2
+
1
x
x
x +2
+
1
x
2
= 2.

1
a
a b
a
a +b

1
a
2
b
2
=


x
3
+2x
2
+2x
x
3
+ x +2


ab b
2
a
2
ab 1


3. Solve:

x 2
x 3
=
x 1
x +1
3. Solve:

4a 3 =
a +13
a +1



x =
5
3


a =2,2

4.

x 1
x

3x + 5
2x
= 4.

a
4
b
4
2ab

a
2
+b
2
2a
2
ab 3b
2
=


x 7
2x


(a +b)
2
(a b)(2a 3b)
2ab



5. One watering system needs about 5. The sum of half a number and its
3 times as long to complete a job as reciprocal is the same as 51 divided by
another watering system. When both the number. Find the number.
systems operate at the same time, the
job can be completed in 9 minutes.
How long does it take each system to
do the job alone?

12 minutes and 36 minutes

x =10,10

You might also like