Project Management

PERFORMANCE MAYO 2011 MAYO 2013

SACHA FIELD

HSE/SQ Performance Review PM Rio Napo

MAYO 2013

FOR INTERNAL USE ONLY

OK , THERE IS A SMALL CHANGE. RED BAG HAS THE SANDWICHES AND THE GREEN BAG IS YOUR PARACHUTE

Programa Stop Work Authority


Dar a todos los empleados la autoridad y responsabilidad para intervenir o detener una tarea sin miedo de represalias si ellos observan actos o condiciones insegura en el Sitio de Trabajo, o tienen una preocupacin referente a un riesgo de HSE.
Suplir cualquier otro programa de SWA provisto a Halliburton bajo un contrato o acuerdo de operacin en el sitio de trabajo. Cuando mltiples acuerdos o estndares proveen SWA, los empleados de Halliburton y contratistas debern utilizar el estndar mas seguro aplicable.

PM Ecuador - HSE Incident Rates


October Recordable Incidents *
00 - Fatal Incident 00 - LTI 00 - Restricted Work Cases 00 - Medical Cases 00 - RVI 00 - Recordable Environmental Incident
2011 Miles Driven Hours Worked Total STOP/ECO Alerts By PSL BAR Mth 00 YTD 00 531.062 0 By Facilities Argentina Mth 31,452 0 Mth 00 YTD 307,856 0 YTD 00

5.0 4.0 3.0

4.31 3.23

0.45

2.0
1.0 0.0
2010

TRIR
0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0
2 0

2.59

2.16

1.86 1.63 1.45 1.30


0 0 0 0

Oct 11 Nov 11 Dec 11 Jan 12 Feb 12 Mar 12 Apr 12 May 12 Jun 12 Jul 12 Aug 12 Sept 12 Oct 12

* Details on the next slides

0.12
3.0 2.5 2.0 1.5

2.15

LTIR
0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0
2010

1.62 1.29 1.08 0.93 0.81 0.72 0.65


0 0 0 0

1.0 0.5
0.0

Oct 11 Nov 11 Dec 11 Jan 12 Feb 12 Mar 12 Apr 12 May 12 Jun 12 Jul 12 Aug 12 Sept 12 Oct 12

B&C
CMT C&PM HCT HDBS Landmark PE SDS T&SS

00
00 00 00 00 00 00 00 00

00
00 03 00 00 00 00 00 00

Bolivia
Brazil Colombia Ecuador Mexico Peru Suriname Trinidad Venezuela

00
00 00 00 00 00 00 00 00

00
00 00 03 00 00 00 00 00
0.0
2010 Oct 11 Nov 11 Dec 11 Jan 12 Feb 12 Mar 12 Apr 12 May 12 Jun 12 Jul 12 Aug 12 Sep 12 Oct 12

1.0 0.8 0.6 0.4 0.2

0.23

RVIR
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Rate Incident Number

WP
Contract

00
00

00
00

PM Ecuador - HSE Summary


LTI Subcontractor. During cementing of well Sacha 300V, two employees from a subcontractor were in the mud tanks area moving hoses. They support on the hand rail that fails, falling the two employees from a height of approximately 2.5m to the ground. They were moved to a medical center for evaluation and no fractures were founded. They were diagnosed with lumbar trauma and prescribe resting.

RHS 582169 Ecuador Mar

RWC

RHS 582300 Ecuador Mar

Subcontractor employee was painting a BOP he slipped and fell trapping his finger between the floor and the stair he was using causing a 3cm injury on his third finger that required stitches for treatment.

STOP ECO PARTICIPATION

FOR INTERNAL USE ONLY

STOP ECO TENDENCY BY BEHAVIOR

FOR INTERNAL USE ONLY

DESEMPEO HSE

FOR INTERNAL USE ONLY