AISC Seismic Design-Module5-Buckling Restrained Braced Frames
AISC Seismic Design-Module5-Buckling Restrained Braced Frames
Building Structures
5. Buckling Restrained
Braced Frames
Prepared by:
Michael D. Engelhardt
University of Texas at Austin
with the support of the
American Institute of Steel Construction.
Version 1 - March 2007
Design of Seismic-Resistant
Steel Building Structures
Buckling-Restrained Brace
BucklingRestrained Brace:
Steel Core
+
Casing
Casing
Steel Core
Buckling-Restrained Brace
Casing
BucklingRestrained Brace:
Steel Core
+
Casing
Steel Core
Steel jacket
Mortar
Debonding material
Section A-A
Buckling-Restrained Brace
Buckling-Restrained Brace
BucklingRestrained Brace:
Steel Core
+
Casing
Steel Core
Yielding Segment
Core projection and
brace connection
segment
Py
significantly different
strength in tension and
compression
PCR
buckles in compression
(nonducile)
Py
PCR
yields in compression
(ductile)
Py
Single Diagonal
Inverted V- Bracing
X- Bracing
V- Bracing
16.1
Scope
16.2
Bracing Members
16.3
Bracing Connections
16.4
16.5
16.6
Protected Zone
16.1 Scope
Buckling-restrained braced frames (BRBF) are expected
to withstand significant inelastic deformations when
subjected to the forces resulting from the motions of
the design earthquake.
= 0.9
Yielding Segment
Casing
Purpose of Testing:
Appendix T
Two tests required to qualify brace:
1.
2.
Appendix T
Appendix T
Subassemblage Test Specimen: Axial + Rotational Loading
Appendix T
Scale Requirements for Test Specimens:
1.
2.
Appendix T
Definitions:
b
=
total brace axial deformation for the brace
test specimen
=
total brace end rotation for the
subassemblage test specimen
bm
=
value of deformation quantity, b,
corresponding to the design story drift
by
=
value of deformation quantity, b, at first
significant yield of the test specimen
Appendix T
When calculating bm, the design story drift shall not be
taken less that 0.01 story height
Cd E
Design story drift = larger of
Appendix T
Loading Sequence
2 cycles at:
b = by
2 cycles at:
b = 0.5 bm
2 cycles at:
b = 1.0 bm
2 cycles at:
b = 1.5 bm
2 cycles at:
b = 2.0 bm
Appendix T
Acceptance Criteria for Test Specimens:
Appendix T
Example of Results for Brace Test Specimen
Tmax
-2bm
Cmax
2bm
Determine from
Appendix T brace
tests
Tmax
Fysc Asc
Cmax
Tmax
Determine from
Appendix T brace
tests
Ry Pysc
Ry Pysc
Ry Pysc
Beam-to-column connections:
simple framing
b/t ps
Ry Pysc
Ry Pysc
Ry Pysc
Ry Pysc
Ry Pysc
Ry Pysc
Splice Requirements:
1.
2.
3.
Protected Zones
Protected Zones
Section 16
16.1
Scope
16.2
Bracing Members
16.3
Bracing Connections
16.4
16.5
16.6
Protected Zone