PRODUCTIVITY
IMPROVEMENT
Initiated By : - Production
Team
Team Members
CONTENT
SUMMARY
EXISTING
FACILITIES
MODIFIED
FACILITIES
Number Of Stations : 18
Nos
Number Of Stations :
Nos
27
18
Production/ Shift
Nos
: 3
BENEFIT : We can achieve the Leyland RPD (10 Nos) requirement from
single line.
Cost saving
Area Utilization
Before Improvement
Fabrication Line
Layout
PR
FL OC
O ES
W
Inference :
Average cycle
time
90
85
85
80
Cycle time in Min
70
60
60
58
60
60
55
60
52
60
55
60
55
60
50
40
30
cycle time
Target (Min)
20
10
0
Stage
Bottleneck
-1
PREVIO
US
MODIFIE
D
1. Now one new station created
for interior panel fitment.
2. One additional MIG welding
machine and one MIG welder
provided for interior panel
fitment
Bottleneck
2
PREVIO
US
1. Earlier cutting and grinding
both work was being done at
single stage.
2.
MODIFIE
D
1.Now one new station created
for grinding.
2.One additional grinder and one
grinder
man provided for interior panel
fitment.
After Improvement
Fabrication Line
Layout
PR
FL OC
O ES
W
Inference :
Fabrication Line-After
improvement
Cycle time in Min
Average cycle
time
62
60
58
56
54
52
50
48
46
44
60
58
60
60
58
60
60
55
52
52
60
60
55
55
60
52
60
50
cycle time
Target (Min)
Stage
SHIFT
TO TRIM
Top coat
Putty,
sanding,
Masking
Baking
PROCES FLOW
Sealant &
Primer
Finished
Shell
START
FINIS
H
GANG WAY
Putty &
sanding
GANG WAY
220
220
200
Cycle Time in min
150
100
50
120
120
100
120
30
120
120
120
Average
Cycle time
30
Stage
Total manpower
30 Nos. used in 24
hour .
Bottleneck
-1
PREVIO
US
MODIFIE
D
1. Now one new station created
for Putty
sanding.
2. One additional orbit sander
provided provided for putty
sanding.
3.
One additional manpower
added for putty sanding.
Bottleneck
-2
PREVIO
US
MODIFIE
D
1.Now two new stages created
by shifting new baking oven
towards trim line.
2.Fix masking introduced for time
saving.
.
Bottleneck
-3
Black Painting
PREVIO
US
1. Only one manpower was done
black Painting and final touch
up.
MODIFIE
D
1.
Two additional manpower
provided for black painting and
final touch up.
FINISH
Black
painting
Top
coat
Bakin
g
Additional
Oven
GANG WAY
Sanding
&
Masking
Putty
Baking
Sealant &
Primer
Sanding
Putty
START
GANG WAY
Improvements: 2 new stages (*) added and Dedicated Fork lift for Cabin line.
Paint Line-After
Improvement Process
140
120
100
75
80
60
40
30
30
20
0
80 75
stage
Total
manpower 30
Nos. used in
12 hour .
220
220
200
150
120
100
50
120
100 100105
120
120
120
100
120
120
100
80
30
120
30
30
stage
120
100
75
Before
After
75
Target
30
180
180
60
60
process
140
Cycle Time in min
120
100
80
60
220
Target (Min)
40
20
0
stage
Inference : : 2 stages on painting Line are found bottle necked. Action to be has
been taken by bifurcating the stages.
60
60
process
60
60
55
55
58
55
cycle time
Target (Min)
stage
Inference : : 2 stages on painting Line are found bottle necked. Action to be has
been taken by bifurcating the stages.
PROCES FLOW
BEFORE
LAYOUT
FINIS
H
PDI
stage-2
PDI
stage-1
GANG WAY
Shower
Process done
at Near Main
gate
Roof fitment,
FES Trim, All
glasses Fitment
START
GANG WAY
Shower
Chair
& floor
mate
fitmen
t
Door
Assy. and
all lights
fitment
FINISH
GANG WAY
All Glass
and
handles
fitment
pdi
2
pdi
1
Roof
Fitmen
t&
FES
Trim
START
GANG WAY
Improvements: 2 new stages (*) added and Dedicated Fork lift for Cabin line.
Improvement
no-1
Before
Inference :
After
Improvement
no-2
Before
Inference :
After
Improvement
no-3
Before
Inference :
After
Improvement
no-4
Before
Inference :
After
Thanks