Project Background

Context
With increase in enquiries and level of operations, PI is embarking on the next phase of the
growth journey in Fine Chemicals segment
In this context, managing various engineering projects (new and modifications) and its timely &
on-budget handover to operations is key to its success (delivery).
Therefore, there is a need to automate manual tasks/ processes/ templates which are run today
through emails/ spreadsheets/ word documents/ etc.
There is a need for real-time monitoring and review of projects at various stages in its lifecycle.

Solution
Infionic Enterprise Suites Product & Portfolio Management solution provides a platform to
handle these projects and their handover to operations while also interfacing with various other
functions TAG, OPS, EHS, R&D, PD.
Provides a high-level view of project progress and status to the Management on a real-time basis.
Provides a detailed view of project activities and status for personnel involved in day-to-day
handling of engineering projects
Project managers will be able to manage projects effectively by allocating, tracking, reviewing,
submitting various deliverables through this web-based application making it easier to use.
Improves collaboration by ensuring role based access to all team members to provide individual
updates on a real-time basis
Due to the suites ability to integrate with SAP, it will reduce duplication of work.

Infionic Enterprise Suite 3


Mission

To establish a project management framework by building a web-based

application for Engineering Projects which will address the following

High-level visibility of status and progress of each project

Enhanced planning capabilities thereby providing the ability to get insights into variance

Automation of manual processes/ templates/ etc.

Application having user-friendly interface

Plan, Allocate, track, review, submit, and share information about cost, deliverables and

timeline

Optimize project management resources

Infionic Enterprise Suite 4


Scope of Work Process Flow

Infionic Enterprise Suite 5


Data Management and Flow between IES & SAP

Infionic Enterprise Suite 6


Project Delivery Methodology

Finalize
Requirements

Customize/Configure
Product

User
Acceptance
Test

Rollout

Infionic Enterprise Suite 7


Requirements Phase

Functionality discussions: Based on the understanding of the


various processes, we would facilitate requirements gathering
sessions to go through all the flows (including UI and data migration
requirements). These sessions would lead to a detailed list of
functionality from the End-users perspective.

Study of existing technical infrastructure: A study of the existing


systems and infrastructure would be conducted, with the client IT
personnel involved. This study would be conducted to understand:
The functionality of the existing systems
The interfaces with the proposed system
The technical platforms/APIs availability etc

Documentation of Functional Requirements: Infionic team, after


conducting the detailed functionality discussions and the technology
study will document the requirements and will obtain a sign-off on
the same from the client.

Infionic Enterprise Suite 8


Customization Phase

Integrated technical Design: The high level and low-level design will
be completed to identify how Infionic Enterprise Suite will interact
with other existing systems

Creative Design: The UI needs to be designed as per the needs of the


client. Any changes to the UI design will be completed in this phase.

Module-wise Customization: The complete module-wise


customization will be completed along with unit testing. All the
modules need to be integrated with the UI requirements. The
interfacing with third -party systems (if any) will also be built here.

Integration: After the customizaiton is completed and these are unit


tested, the various modules will be integrated to form the final product.

Integrated Testing: The integrated solution will be tested completely


before rolling out.

Infionic Enterprise Suite 9


UAT & Roll Out Phases

User Acceptance Test


User Acceptance Testing: Users will go through the final tool to verify
that it meets functional requirements and that the service level
agreements are met.
Bug fixes: Any issues that come out of UAT will be fixed and the users
will verify the same
Data Migration: Any data that needs to be migrated will be done in
this phase

Rollout
End User Training: Users will be trained on the new tool and reference
material will be provided.
Deployment: Tool will be deployed in client premises and will be
ready to be used in production mode once

Infionic Enterprise Suite 10


Implementation Timeline

Wk0 Wk6 Wk12 Wk18 Wk24

Requirements

3Aug

ProductCustomization

UAT,Training&Rollout
ofApplication

* Based on our current understanding, we estimate the project timeline to be 22 weeks. The plan will be
revised after the requirements gathering phase and the team will try to reduce the timeline as much as
possible

Infionic Enterprise Suite 11


Project Team

PI Infionic

Steering Account
Committee Director

Client
Project
Project Manager IT Coordinator Engagement
Coordinator
Manager

Business
Project Team IT Team
Analysts

Functional Development
Experts Team

Infionic Enterprise Suite 12


Phase-wise Project Team Involvement

Phase Infionic PI Industries

Requirements Project Manager Functional Experts to provide


Gathering Business Analyst requirements
Technical Architect as needed Project manager to Sign off on
requirements
IT Coordinator
Customization Technical Development Team Functional Experts & Project
Testing Engineer Manager on an as needed basis to
Project Manager provide clarifications
Business Analyst IT team for customizations required
on SAP Side
UAT Technical Development Team for PI designated people to conduct
fixing issues UAT
Testing Engineer IT Team to coordinate integration
Project Manager testing
Business Analyst
Training & Roll Out Project Manager End users who need training
Business Analyst Project manager for sign-off on go-
Deployment team live
IT team for deployment
IT Coordinator

Infionic Enterprise Suite 13


Communication Plan

Type Frequency Participants


Status Review Every Week PI Project Manager
Meeting PI Project Coordinator
PI IT Coordinator
Infionic Project Manager
Infionic Business Analyst
Infionic Technical Architect
Project Review Every Other week PI Steering Committee
Meeting PI Project Manager
PI Project Coordinator
PI IT Coordinator
Infionic Account Director
Infionic Project Manager

Infionic Enterprise Suite 14


Change Management Process

Type Approving Authority

Change with no schedule & Cost PI Project Manager


impact

Change with Schedule Impact but PI Project manager in consultation with Project Coordinator
not cost impact and IT Coordinator

Change with Cost Impact PI project manager in consultation with Steering Committee

Infionic Enterprise Suite 15


Additional Expectations

Stakeholders Additional Expectations

Management

Projects

Operations

TAG

EHS

Infionic Enterprise Suite 16


Infionic Enterprise Suite (IES) :
Connecting Information Ions

CRM+
ERP

PPM
HRM

Infionic Enterprise Suite 17


High-level Scope of work
Phase Current Status Future Status

SAP Manual SAP Infionic Manual

Planning - P&ID Manual Same as current


Initial Layout manual

Budgeting Final WBS Details in Excel


based
budgeting
added

Scheduling 2 level WBS Micro-scheduling is in


defined excel based on high0level
schedule

Planning - Detailed engg. Package


Detail manual

Procurement Procurement is Same as


done in SAP current

Execution WBS updated Site Activity


with actuals at Scheduling(SAS)
month end Monitoring based on SAS
Cost Tracking

Verification PSSR only for new


equipment
HAZOP Verification
QA/QC
Project handover / takeover

Closure Project
Capitalization
Infionic Enterprise Suite 18