Kick-Off Meeting For FC Engineering Project Management System
Kick-Off Meeting For FC Engineering Project Management System
Management System
CONFIDENTIALITY
The concepts and methodologies contained herein are proprietary to Infionic Inc.. Duplication, reproduction
or disclosure of information in this document without the express written permission of Infionic is
prohibited.
Context
With increase in enquiries and level of operations, PI is embarking on the next phase of the
growth journey in Fine Chemicals segment
In this context, managing various engineering projects (new and modifications) and its timely &
on-budget handover to operations is key to its success (delivery).
Therefore, there is a need to automate manual tasks/ processes/ templates which are run today
through emails/ spreadsheets/ word documents/ etc.
There is a need for real-time monitoring and review of projects at various stages in its lifecycle.
Solution
Infionic Enterprise Suites Product & Portfolio Management solution provides a platform to
handle these projects and their handover to operations while also interfacing with various other
functions TAG, OPS, EHS, R&D, PD.
Provides a high-level view of project progress and status to the Management on a real-time basis.
Provides a detailed view of project activities and status for personnel involved in day-to-day
handling of engineering projects
Project managers will be able to manage projects effectively by allocating, tracking, reviewing,
submitting various deliverables through this web-based application making it easier to use.
Improves collaboration by ensuring role based access to all team members to provide individual
updates on a real-time basis
Due to the suites ability to integrate with SAP, it will reduce duplication of work.
Enhanced planning capabilities thereby providing the ability to get insights into variance
Plan, Allocate, track, review, submit, and share information about cost, deliverables and
timeline
Finalize
Requirements
Customize/Configure
Product
User
Acceptance
Test
Rollout
Integrated technical Design: The high level and low-level design will
be completed to identify how Infionic Enterprise Suite will interact
with other existing systems
Rollout
End User Training: Users will be trained on the new tool and reference
material will be provided.
Deployment: Tool will be deployed in client premises and will be
ready to be used in production mode once
Requirements
3Aug
ProductCustomization
UAT,Training&Rollout
ofApplication
* Based on our current understanding, we estimate the project timeline to be 22 weeks. The plan will be
revised after the requirements gathering phase and the team will try to reduce the timeline as much as
possible
PI Infionic
Steering Account
Committee Director
Client
Project
Project Manager IT Coordinator Engagement
Coordinator
Manager
Business
Project Team IT Team
Analysts
Functional Development
Experts Team
Change with Schedule Impact but PI Project manager in consultation with Project Coordinator
not cost impact and IT Coordinator
Change with Cost Impact PI project manager in consultation with Steering Committee
Management
Projects
Operations
TAG
EHS
CRM+
ERP
PPM
HRM
Closure Project
Capitalization
Infionic Enterprise Suite 18