What is SIPOC?
Suppliers
Inputs
Process
Outputs
Customers
11 22
5 3
When does What are
the process the
What inputs start? Outputs?
6 are required Who is the
to enable customer
this process? 7 of each
Who
4 output?
6 Ms What is the
supplies
each input? process?
What does
the process What does
expect of each
each input? customer
expect from
When does
each output?
the process
end?
Example of a SIPOC
SIPOC
Suppliers Inputs Process Outputs Customers
(providers of the (resources required (deliverables from (anyone who receives a deliverable
(top level description of activity)
required resources by the process) the process) from the process)
Requirements Requirements
Per specification. On
management/end
Blowmold department Case/lid Size, color, weight Cooler time. Correct quantity
customer
per production code
size, color, weight,
Rotovac liner Screw Machine Scrap less than 1% management
material thickness
Hinge. Drain, pins,
size to spec. quantity Efficiency 110%,
Outside supplier handles, handle Earned hours management
required, color correct 1300 per shift
bracket,
correct spec and
Outside supplier screws
quanity
Cooler assembly
process on Line
Outside supplier Urethane insulation Proper spec material 6
Pack into
temp (110-130
carton.
Maintenance / degrees) Speed ( 5
Production Oven minute cycle)
trained, skilled,
Human Resource Dept Assemblers capable
Production/
Engineering/ pressure 1500 psi,
Maintenance urethane head correct size shot