Months CRSM *CRM Prod. Loss-(MT) MTD To Be.

(MT)
July'17 313.3 228.10 10,561.03 12,888.20 23,449.23
Aug'17 179.8 37.80 1,750.14 16,524.69 18,274.83
Sept'17 130 13.80 638.94 18,652.76 19,291.70
Oct'17 121.9 16.60 768.58 20,075.84 20,844.42
Nov'17 181.6 64.60 2,990.98 17,387.00 20,377.98
Total 926.6 360.90 16,709.67 85,528.50 102,238.17
Average DT/Mth = 72.18 Hrs

*Downtime calculation based on following assumption:


• Total Hours available in a month = 30*24 = 720
• Allowable Downtime (Hrs.) @ 85 % Efficiency = 720*0.15 = 108/Month
• As per 60:40 criteria (CRM:SPM) allowable DT for Rolling Operation= 0.6*108 =65 Hrs
• 65 Hrs/Month has been deducted from the actual downtime observed during month in Rolling
operation.
Months CRSM *CRM Prod. Loss-(MT) MTD To Be. (MT)
July'16 183.7 97 4491.1 11020.41 15511.508
Aug'16 149.3 37.1 1717.73 16939.85 18657.576
Sept'16 113.2 9.6 444.48 20860.98 21305.459
Oct'16 105.1 2.5 115.75 20076.9 20192.648
Nov'16 145.3 54.3 2514.09 22110.12 24624.21
Total 696.60 200.5 9,283.15 91008.25 100291.401
Average DT/Mth = 40.1 Hrs
Months Major Issues DT (Hrs.)
July'17 RGC Issue 216
Power failure 20
Aug'17 DTR communication issue 14
DTR OBB issue 13
DTR bolt shear 7
Sept'17 ETR mandrel Overhauling 5
Mill Bottom Tripping 2
ETR table issue 6
Oct'17 DTR bolt tightening 5
Emulsion valve issue 5
HMI server Upgradation 30
Nov'17 Oil Leakages 6
Push Up Cyclinder Issue 5

You might also like