Traction Distribution
APDJ Division
N. F. Railway
Administrative structure of Division
Sr.DEE/TRD/APDJ
(B. C. Chakraborti)
ADEE/TRD/APDJ
(N. Nandi)
Nov’22 2282000 -
Nov’22 3047250 -
Energy Consumption in TSS
SN TSS Month Unit Rate Total Energy Charge Total Demand Total amount
Consumption (in Rs.) (in Rs.) charge (in Rs.)
(KWH) (in Rs.)
For
SN Example
Month : Unit Consumption (KWH) Rate Total Energy Charge Total Demand Total amount Saving
(in Rs.) (in Rs.) charge (in Rs.) (in Rs.)
(in Rs.)
16884360
2 New rule 1922000 5.86 11262920 - 11262920
As per new rule power factor of the respective TSS are not
mentioned. So, it is difficult to calculate PF rebate.
DISTRIBUTION OF TOOLS AND PLANTS IN CONNECTION WTH RE WORK OF RQJ-NBQ SECTION
Demand Supplied
SN Description To be given BD Van DQG NOQ Depot GOGH BD Van DQG Depot NOQ Depot GOGH Total Supplied
by RVNL Depot Depot Depot
Balanced to be supplied
20 Portable electric drill 21.0 mm 1-ph, 230 v (for drilling rails for 3 0 1 1 1 0 1 2 0 3 0
bonding)
Demand Supplied
SN Description To be given by BD DQG NOQ GOGH BD Van DQG Depot NOQ Depot GOGH Depot Total Supplied
RVNL Van Depo Depot Depot
t
Balanced to be
supplied
25 Stretcher 4 1 1 1 1 0 1 1 0 2 2
36 Steel sling with eye each end 19 mm dia 36 6 10 10 10 0 4 24 (6 nos. each 24 (6 nos. each 52 0
of 1 mtr, 1.5 of 1 mtr, 1.5
(916mmx1.5 mtr) mtr, 2 mtr, mtr, 2 mtr,
3 mtr) 3 mtr)
a. 1.0 mtr long
37 Slewing gadget 10 1 3 3 3 0 0 0 0 0 10
40 Micrometer (Digital) 3 0 1 1 1 0 1 4 0 5 0
43 Loaded Trolleys 12 0 4 4 4 0 0 1 1 2 10
44 Engineering ratchet 6 0 2 2 2 0 0 0 0 0 6
46 Tilly lamps 12 0 4 4 4 0 0 0 0 0 12
Demand Supplied
SN Description To be BD Van DQG NOQ Depot GOGH Depot BD Van DQG NOQ GOGH Total Supplied
given by Depot Depot Depot Depot
RVNL
Balanced to be supplied
4 Binoculers 3 0 1 1 1 0 1 1 0 2 1
5 Vernier Callipers 6 0 2 2 2 0 2 4 0 6 0
7 Emergency telephone 21 0 7 7 7 0 0 0 0 0 21
8 Multimeter 3 0 1 1 1 0 2 0 0 2 1
1 1/2" square drive socket set containng 19 sockets with 6 9 0 3 3 3 0 1 1 (46 pcs ) 0 2 7
attachments
9 3 0 1 1 1 0 0 0 0 0 3
Hand Barrel Pump
10 3 0 1 1 1 0 0 0 2 2 1
SN Switching Post
Place
1 SP Salbari (SXX), Samuktala RD (SMTA) & Kokrajhar (KOJ)
2 NFR-200056 DMW/ Patiala NOQ OHE cum PSI Depot Commissioned on 03.08.2021
3 NFR-210016 DMW/ Patiala GOGH OHE cum PSI Depot Commissioned on 14.07.2021
Total 590 -
Proposed OHE Cum PSI Depot with TW Shed in Alipurduar
Division,
N. F. Railway (BG-III & BG-IV) under IRCON’s scope
TWD Gr-I 3 0 3
TWD Gr-II 3 0 3
TWD Gr-III 0 4 -4
Total TWD 8 4 4
Helper/TRD 76 19 57
February-22
65 Hrs 50 Min 54 Hrs 19 Min 54 Hrs 49 Min 83%
March-2022
52 Hrs 05 Min 40 Hr 31 Min 43 Hrs 10 Min 83%
April-2022
58 Hrs 45 Min 45 Hrs 02 Min 49 Hrs 40 Min 84%
May-2022
47 Hrs 41 Min 36 Hrs 41 Min 38 Hrs 42 Min 81%
June-2022
80 Hrs 10 Min 62 Hrs 00 Min 71 Hrs 03 Min 88%
JULY-2022
157 Hrs 41 Min 105 Hrs 03 Min 131 Hrs 05 Min 83%
August-2022
165 Hrs 45 Min 107 Hrs 41 Min 118 Hrs 35 Min 72%
September-2022
154 Hrs 45 Min 92 Hrs 35 Min 106 Hrs 38 Min 69%
October-2022
6855 Min 3944 Min 4405 Min 64%
NOV-2022
7704 Min 6014 Min 6261 Min 81%
DEC-2022
Till-21/12/2022 3750 Min 2393 Min 2552 Min %