You are on page 1of 4

Laporan Produksi Bulan September 2022 (BSS 1D)

Plan Coal 65000


Plan OB 980000
SR 15.08

BSS 1D
1 2 3 4 5 6 7
Coal daily 1001.04 1245.58 1819.4 1767.97 0 1523.38 1599.22
OB daily 18225 30200 31550 38400 10225 28725 26225
SR 18.21 24.25 17.34 21.72 - 18.86 16.40

Laporan Produksi Bulan September 2022 (MJU 1E)

Plan Coal
Plan OB
SR 0.00

MJU 1E
1 2 3 4 5 6 7
Coal daily 723.72 665.12 450.86
OB daily
SR
Tanggal
8 9 10 11 12 13 14 15 16
1487.39 110.18 1679.89 1545.87 0 0 2177.12 2044.38 2324.21
27700 17250 27850 23450 20400 21400 22100 22750 27350
18.62 156.56 16.58 15.17 - - 10.15 11.13 11.77

Total Produksi MJU & BSS

Kontraktor Produksi
Coal BSS 1D 50,010.60
OB BSS 1D 820,235.00
Coal MJU 1E 1,839.70
OB MJU 1E -
Total Coal 51,850.30
Total OB 820,235.00

Tanggal
8 9 10 11 12 13 14 15 16
17 18 19 20 21 22 23 24 25 26
1534.15 1660.37 2037.53 1155.66 2170.72 2387.51 2140.49 642.97 2219.06 2532.61
24475 29000 33100 28875 37375 28750 34725 20375 31775 30227
15.95 17.47 16.25 24.99 17.22 12.04 16.22 31.69 14.32 11.94

17 18 19 20 21 22 23 24 25 26
27 28 29 30 Total
3155.19 2815.55 2392.25 2840.91 50010.6
29298 33647 38414 26399 820235
9.29 11.95 16.06 9.29 16.40

27 28 29 30 Total
1,839.70
-
0

You might also like