You are on page 1of 74

TECNOCOSTRUZIONI SRL

WHO WE ARE WHAT WE DO


The company Tecnocostruzioni s.r.l. was The company is active in the industrial sector
founded in 1997 and today is a consolidated paying a particular attention to the provision and
reality offering to its customers proposals, commissioning of medium and low voltage
solutions and services in the field of energy, transformation and distribution booths, control
technological systems and for water treatment and command panels, Technological systems,
Water treatment systems, Renewable energy
systems.
WHAT WE OFFER

The choices of the company Tecnocostruzioni


s.r.l. aim to fully satisfy the customer. We are CONTACT
able to provide turnkey solutions for all your
plants; our technicians are carefully handling Registered headquarters: Via della Roverella
every detail, from design to achievement. The 14/16 -70022-Altamura (Ba)
company Tecnocostruzioni develops project Tel: +39080311728
solutions in the electrical and automation field, E-mail: amministrazione@tecnocostruzionisrl.net
specific in the following sectors: Pec: tecnocostruzionisrl@pec.it
- Sewage, desalination and water uptake Technical department:
- Energy generating plants from renewable Tel: +393315250684
sources
E-mail: ufficiotecnico@tecnocostruzionisrl.net
- Industry and tertiary sector
Site web: www.tecnocostruzionisrl.net

REFERENCES CERTIFICATIONS AUTHORISATIONS


WHO WE ARE

The company Tecnocostruzioni s.r.l. was founded in 1997 and today is a consolidated reality
offering to its customers proposals, solutions and services in the field of energy, technological
systems and for water treatment
Throughout its career over the past twenty years, from simple industrial plants and from the
tertiary sector, it became known internally and internationally in the industrial electrical plants
sector.
For over 10 years it added to this specialty activity the industrial process automation and
supervision, the development of specific softwares, by virtue of the complete and deep
knowledge in the field of special productive processes. A multi annual experience and expertise
with the automated systems and sewage, water uptake and desalination plants, energy
distribution systems, low and medium voltage booths, surveillance systems, automations in
general and public lighting systems.
The company Tecnocostruzioni Srl is a leader in its sector. Due to the complete availability of
our staff, we can assist the customer in all phases of the project:
- design
-construction
- electrical installation
-electric panels
- reception
all these without the need to address to multiple suppliers or subcontractors that could cause
misunderstandings or delays in implementing their own projects.
WHAT WE DO

MEDIUM AND LOW VOLTAGE


AUTOMATION TECHNOLOGICAL
TRANSFORMATION AND
DISTRIBUTION BOOTHS PANELS PLANTS

WATER TREATMENT INDUSTRIAL


SYSTEMS ELECTRICAL RENEWABLE ENERGY
PLANTS
Medium and low voltage transformers and medium and low
voltage distribution

We design and develop solutions for medium and low voltage power management inside buildings or industrial
systems.
The accumulated "know-how" and the professionalism of the technicians allow us to brag about a remarkable
competitiveness on the market, developing complete and personalized solutions from design to construction,
to reception and after sale support.
The level of the products and services offered is constantly adapted to a market that is increasingly demanding
for reliability, state-of-the-art technology and competitiveness.
Certified UNI EN ISO 9001 CD Electric ensures the quality of productive processes.
Our production includes:
* Low voltage panels of POWER CENTER type in different segregation forms
* Low voltage panels of MOTOR CONTROL CENTER type with removable and fixed drawers
* F.M and light distribution panels
* Low and medium voltage booths
* Medium voltage distribution networks, both overhead and earthed .
* Implementation of terminals and medium voltage cable couplings with extruded insulation with a
section of up to 630mm² made of aluminum and of 400mm² made of copper

PHOTO GALLERY
Medium and low voltage transformers and medium and low
voltage distribution (photo gallery)

Medium Voltage booth for the Saras desalination plant


Medium and low voltage transformers and medium and low
voltage distribution (photo gallery)

Power Center for the Saras desalination plant


Medium and low voltage transformers and medium and low
voltage distribution (photo gallery)

3 1600kVA transformers for the Saras desalination plant


Medium and low voltage transformers and medium and low
voltage distribution (photo gallery)

Motor Control Center for the Saras desalination plant


Medium and low voltage transformers and medium and low
voltage distribution (photo gallery)

Power Center for Anconella water uptake Plant


(Florence)
Medium and low voltage transformers and medium and low
voltage distribution (photo gallery)

Power Center roadblock detail for the Potenza biomass


plant
Medium and low voltage transformers and medium and low
voltage distribution (photo gallery)

Power Center for Potenza biomass plant


CONTROL AND COMMAND PANELS

We design and manufacture electrical control and command panels for the industrial automation of machines
and plants with our know how accumulated with a multi annual experience in specific fields, and this thing
allows us to feel proud of remarkable competitiveness on the market, in addition to designing and
manufacturing frames and automation systems created according to the specific requirements of the client.
The team of technicians has developed a solid designing and implementing capacity, able to meet the market
demands and to provide customized and improved solutions according to the specific requirements of the
customer.
Tecnocostruzioni srl works competently and professionally in all sectors requiring automation, paying a
particular attention to water and energy treatment, guaranteeing professionalism, reliability and after-sale
technical assistance.
To guarantee the quality, we design electrical panels and equipment with specific software, representing the
maximum evolution of electrical panels engineering.
Each electrical panel is built and certified in accordance with the IEC Reference Standards and the directives
in force.
Our production includes:
* Electrical panels for industrial automation.
* Control and command panels.
* Electrical panels for the plants required by technological processes.
* Special performances.
* Electrical wiring.
* Plants and equipments for machinery.
* Surveillance systems and SCADA
PHOTO GALLERY
CONTROL AND COMMAND PANELS
(photo gallery)

Engines ignition panels and the automation of Anconella


Florence water uptake plant
CONTROL AND COMMAND PANELS
(photo gallery)

Engines ignition panels and the automation of Anconella


Florence water uptake plant
CONTROL AND COMMAND PANELS
(photo gallery)

Surveillance of the Anconella Florence water uptake


plant
CONTROL AND COMMAND PANELS
(photo gallery)

Panel for starting the motors, automation and control of


the SP.34 Stintino (SS) lifting system
CONTROL AND COMMAND PANELS
(photo gallery)

Panel for starting the motors, automation and control of


the Bonorva(OB) treatment plant
CONTROL AND COMMAND PANELS
(photo gallery)

Panel for starting the motors, automation and control of


the Perdasdefogu(NU) treatment plant
CONTROL AND COMMAND PANELS
(photo gallery)

Panel for starting the motors, automation and control of


the Sardinia lifting system
Electrical and technological plants

A leader in the sector since 1997, our abilities are not limited to manufacturing plants, but they have as a starting point the consultancy
followed by the study and design of innovative solutions that aim to find the optimal solution for the customer.
We handle the technological plants in different sectors (electrical, for safety, special, photovoltaic) with added value for the customer, to
offer the possibility for completing and interacting with the various plants present in a building or establishment through building
automation for society .
Certified UNI EN ISO 9001 CD Electric ensures the quality of productive processes.
Electrical plants
* Medium and low voltage electrical plants
* High and low voltage transformers
* Systems and field measurements
* Plants in special places (medical use, public shows, explosion and / or fire hazards)
* Public lighting systems
* Power factor correction systems
Safety
* TVCC - video surveillance
* Access control
* Burglar
Special
* Integrated domotics
* Building automation
* LAN networks
* Smoke detectors

PHOTO GALLERY
Electrical and technological plants
(photo gallery)

Electrical plant, for lighting, signaling and networking for


the Anconella Florence water uptake system
Electrical and technological plants
(photo gallery)

Generating sets and fuel management panel for Anconella


Florence water uptake system
Electrical and technological plants
(photo gallery)

Electrical plant, for lighting, signaling and networking for


the Saras desalination plant
Electrical and technological plants
(photo gallery)
Electrical and technological plants
(photo gallery)

Electrical installation for the Bresso (MI) treatment plant


Water treatment plants
Innovative solutions for water and wastewater treatment
and for their reuse

Tecnocostruzioni has focused from the very beginning on the design and implementation of innovative solutions
for water and wastewater treatment for reuse.

Water scarcity is increasingly forcing innovation. Wastewater, previously considered as a disposal obligation,
are now a resource. Wastewater treatment solutions, in addition to the cost of disposal, can produce pure and
ultra pure water for reuse in the civil sector, power generation, cooling towers, urban cooling systems,
beverage bottling, food production, agricultural irrigation and in many other sectors.

Tecnocostruzioni designs, builds and supplies reverse osmosis plants for: wastewater treatment and recovery
for industrial use; for the desalination of marine and brackish water. Wastewater recovery allows factories to
minimize discharges and save costs for water consumption by reusing effluents in different processes. Each
system is designed and built separately, taking into account wastewater characteristics, effluents quality
criteria and recycling potential and effluents reuse. Systems designed to provide optimum process reliability
and consistency offer a high level of automation and control, with the minimal use of chemicals and
minimizing waste resulting from the treatment process.

PHOTO GALLERY
Water treatment plants
Reverse osmosis desalination systems

Tecnocostruzioni designs and manufactures reverse osmosis systems for desalting seawater, brackish water and
industrial water by achieving this on site or on self-supporting skid boards.
More specifically, a desalination plant is intended to produce:
• drinking water for communities, hotels, motels, camping sites and other accommodation units;
• water for the supply of thermal power plants and condensation treatment (together with ion exchange
plants);
• cooling and process water (in refineries);
• pure water for special applications in the pharmaceutical, photo, electronics and chemical industries;
• drinking water and for industrial processes;
• water for the irrigation of nurseries and greenhouses in the coastal areas;
• demineralised water for medical use in hospitals and laboratories;
• industrial discharges treatment for the recovery of valuable components;
• water recycling for processes (serum, vegetation water)

PHOTO GALLERY
Water treatment plants
Reverse osmosis desalination systems

Tecnocostruzioni plants are provided pre-assembled on self-supporting steel skids to be easily handled and
transported in containers as well. They are equipped with an electric control panel with electronic control
system.
The dimensioning of a reverse osmosis plant is conditioned by a series of variable factors, their clear definition
is indispensable for determining the correct functional characteristics of a plant. Osmosis is a natural process
through which a diluted solution spontaneously turns into a more concentrated solution through a
semipermeable membrane.
The reverse osmosis concept is simple because it is sufficient to apply a pressure higher than the osmotic
pressure to a concentrated solution to cause a reverse flow to the natural one, extracting the molten salts
from the concentrated solution generating a discharge flow; thus, a low saline solution is obtained on the
other side of the membrane.

PHOTO GALLERY
Water treatment plants
How do the reverse osmosis plants function

Reverse osmosis plant mainly consists of a pressurization pump and a variable number of osmotic membranes
depending on the desired capacity and characteristics; for this reason, it is a reliable type of plant and can
operate continuously without requiring regeneration or washing.
The operation of the plant is automatically guided by a control panel and is sometimes preceded by a prior
treatment, also guided automatically.
Reverse osmosis plants are intended for a large number of applications, from the desalination of seawater,
brackish water or well water for drinking or industrial use of various types to the desalination of water
intended for the supply of resinous demineralization plants, for the supply of thermal power plants, food,
chemical, electronics, pharmaceutical, galvanic industry, etc.
Reverse osmosis technology allows, the recovery of some types of domestic water or industrial water with
appropriate prior treatments.

PHOTO GALLERY
Water treatment plants
Reverse osmosis plants for fertilization

Tecnocostruzioni srl designs, manufactures and


supplies reverse osmosis plants for agricultural
companies in the coastal areas, able to treat seawater
and / or surface water and well water to reduce
turbidity, salinity and contamination agents and to
obtain water for the irrigation of nurseries,
greenhouses, agricultural lands, animal nutrition and
food production processes.

PHOTO GALLERY
Water treatment plants
Water desalination for communities, water households
and for provate companies

Many communities, water management authorities and private companies resort to desalination to
ensure a consistent and reliable water supply. Desalination systems can produce drinking water from
almost all sources, including from the sea, as well as from the surface water or brackish water. Plants
are custom made depending on the water quality criteria and on the specific characteristics of the
water supply to the site.

Marine reverse osmosis water desalination systems are modular and positioned in containers, supplied
assembled, wired and with the piping mounted, and designed for quick and easy installation and
commissioning and can be used to:

 Marine reverse osmosis water desalination (SWRO, Seawater Reverse Osmosis)


 Reverse osmosis for brackish water desalination (BRWO, Brackish Water Reverse
Osmosis)

PHOTO GALLERY
Water treatment plants
(photo gallery)

Ventotene Island desalination plant


Water treatment plants
(photo gallery)

Ventotene Island desalination plant


Water treatment plants
(photo gallery)

Various details related to desalination plants in


containers
Water treatment plants
(photo gallery)

Electrodeionation of the Saras desalination plant


Water treatment plants
(photo gallery)

Self-cleaning filters for the Saras desalination plant


Renewable energy and energy efficiency

Due to the competence gained by the company management department and the collaboration with
partners, technicians and professionals from the renewable sources energy sector and energy
efficiency, Tecnocostruzioni srl proposes the design and manufacture of complex plants in the field of
energy efficiency and renewable energy:

• Energy Efficiency Interventions

• Plants generating energy from renewable sources (solar photovoltaic, biogas, biomass, wind, energy
storage, smart grid, co-generation)

• Feasibility studies and energy diagnosis

PHOTO GALLERY
Renewable energy and energy efficiency
Energy Efficiency Solutions

Energy efficiency does not produce energy, but it indicates the ability to guarantee the perfect
functionality of a building, a company or an institution using less energy than the amount used in the
past, reducing consumption and saving not only from a financial point of view. So, by energy
efficiency, to understand, simplifying, the ability to use energy in the best way, by improving "the end
use" according to the following methods:

• EFFICIENCY OF ELECTRICITY CONSUMPTION


• EFFICIENCY OF THERMAL ENERGY CONSUMPTION
• OPERATIONS & MAINTENANCE
The company Tecnocostruzioni proposes products and solutions for energy efficiency in the following sectors:
• TOURISM AND HOTEL SECTOR AND SPORTS STRUCTURES
• INDUSTRIAL SECTOR
• RESIDENTIAL SECTOR
• TERTIARY SECTOR
• AGRICULTURAL SECTOR

PHOTO GALLERY
Renewable energy and energy efficiency
Efficiency of electric and thermal energy consumption

Interventions for Reducing electricity consumption:


 Installation of high efficiency electric motors;
 Installation of co-generation systems for the efficiency of industrial and hotel structures;
 Installation of electronic frequency control systems (inverters) in electric motors;
 Power factor correction of distributed type electric motors in the location of utilities;
 Installation of high efficiency static continuity groups (UPS);
 LED lighting: LED technology based systems instead of pre-existing systems;

Interventions for Reducing thermal energy consumption:


 installation of solar thermal collectors, including combined with solar cooling systems;
 installation of absorption equipment on co-generation plants for the production of cold and hot air
(so-called trigeneration);
 Installation of co-generation systems

PHOTO GALLERY
Renewable energy and energy efficiency
Operation & Manteinance

Tecnocostruzioni srl is specialized in the maintenance and repair of energy generation systems, such
as photovoltaic, wind, co-generation and biomass.

The offer provides interventions for:

 regular maintenance;
 scheduled maintenance;
 full service with the repair or replacement of broken components and video
surveillance.

PHOTO GALLERY
Renewable energy and energy efficiency
Energy generating plants from renewable sources

Tecnocostruzioni srl proposes services for the design, manufacture, management and assistance of
renewable sources energy generation plants, and in particular:

 Biogas energy generation plants in the agricultural and agro-industrial sector from 50 kWe to 1
MWe;
 Biomethane production plants
 Plants for the production of the synthesis gas energy in the agro-forestry and industrial sector from
50 to 200 kWw;
 Co-generation plants powered by methane gas, biogas, synthesis gas, diesel and multifuel.
 Plants for the generation energy from wind sources (Mini-eolian from 20 to 200 kWe)

PHOTO GALLERY
Renewable energy and energy efficiency
Plants for energy generation from renewable sources (solar photovoltaic)

A photovoltaic plant is an electrical installation consisting mainly of the assembly of several photovoltaic
modules, using the incident solar energy to generate electricity through the photovoltaic effect, from the
necessary electrical (cables) and electronic (inverters) component and possibly from the mechanical-automatic
solar tracking. These are generally divided into three large families:
• "off-grid" plants (also called "stand-alone"): they are not connected to any distribution network, which is
why they directly use on-site electricity produced and accumulated in an energy accumulator (batteries);
• "grid-connect" plants:": are those plants connected to an existing distribution network operated by third
parties and often to the private electrical installation to be served;
• "hybrid" plants: remain connected to the distribution network, but mainly use solar energy due to the
battery. If the battery is discharged (eg after a long night use), a power plant is predisposed to obtain
energy by connecting the utility to the electricity supply network.

PHOTO GALLERY
Renewable energy and energy efficiency
Plants for energy generation from renewable sources (solar thermal)

This is a technology that uses solar energy to heat water or air. The fundamental elements that make up this
system are the panels or collectors inside of which the circuit fluid is heated and the internal buildup tanks in
which the hot water is stored.
These plants can be grouped into two main categories: natural circulation and forced circulation plants.
Advantages are:
• reducing fuel consumption for heating;
• savings on bills; reducing pollutants emissions and greenhouse gases.
Disadvantages are:
• higher costs for the initial investment for the plant;
• the need to find a suitable place for plant commissioning.

PHOTO GALLERY
Renewable energy and energy efficiency
Energy generating plants from renewable sources (biogas)

Obtaining biogas from livestock waste and from biomass is a challenge for agricultural entrepreneurs that is of
the utmost importance for the future of the sector. Anaerobic digestion is a biological process that, in the
absence of oxygen, converts the organic substance into biogas, that is, a mixture mainly consisting of methane
gas and carbon dioxide.
The advantage of the process is that starting from organic matter renewable energy is obtained in the form of
a fuel gas and high caloric power. Biogas conversion into energy that can be used within the company can be
produced by combustion in co-generators for the combined production of electricity and thermal energy. With
1m3 of biogas it is possible to produce an average of 1.8-2 kWh of electricity and 2-3 kWh of thermal energy.
The substrates used for biogas conversion are various and not necessarily of animal and / or agricultural
production: livestock waste, crop waste, non-food crops for energy use, organic waste and agro-industrial
wastewater, sewage sludge, organic fractions of urban waste.

PHOTO GALLERY
Renewable energy and energy efficiency
Energy generating plants from renewable sources (wind)

Wind energy has pushed ships for millennia and allowed the first industrial development. Today, wind energy is
the most mature of renewable sources and still has many developmental boundaries.
The wind generator can be considered the modern version of the traditional windmills, with which it shares
too few constructive features. The continuous development of the wind sector has led, over the past years, to
the production of wind generators characterized by high reliability and low cost. Several wind generators
connected together form the so-called "wind farm", wind farms, which are true power plants. Very interesting
nowadays is the "micro-wind" that uses wind machines capable of generating up to 20kW for the machines self-
consumption from 20 to 100 kW considered for industrial use. In order to produce a sufficient quantity of
electricity, it is necessary for the wind generators place of installation to be with strong wind. The favorable
sites for the installation of wind turbines must have an average annual wind speed of 4.5 m / s, with constant
wind throughout the year, with low turbulence and limited gusts

PHOTO GALLERY
Renewable energy and energy efficiency
(photo gallery)

Photovoltaic solar energy generating plant for


greenhouses - 1 MWp electric power - Potenza (Italy)
Renewable energy and energy efficiency
(photo gallery)

Photovoltaic solar energy generating plant for


greenhouses - 1 MWp electric power - Potenza (Italy)
Renewable energy and energy efficiency
(photo gallery)

Maintenance of Photovoltaic Plants Lecce-Taranto-


Brindisi
Renewable energy and energy efficiency
(photo gallery)

Photovoltaic Plant at Guidonia Wastewater Treatment


Plant (RM)
Renewable energy and energy efficiency
(photo gallery)

Energy generating plant of biogas supplied with livestock


and agricultural waste - Electric power 1 MWel - Potenza
(Italy)
Renewable energy and energy efficiency
(photo gallery)

Electricity generating plant of 50 kWel biogas supplied


with livestock waste - Puglia (Italy)
Renewable energy and energy efficiency
(photo gallery)

Electricity generating plant with 250 kWel biogas


(vitrified steel vessels) supplied with agricultural waste -
Puglia (Italy)
Renewable energy and energy efficiency
(photo gallery)

Bifuel motor (Diesel / Biogas) for servicing the lectricity


generating plant with 50 kWel biogas supplied with
livestock waste - Puglia (Italy)
Renewable energy and energy efficiency
(photo gallery)

Energy production plant, supplied with 50 kWel biomass


(synthesis gas from the pygas) supplied with forest waste
- DETAILS IN THE PYGAS SECTION Calabria (Italy)
Renewable energy and energy efficiency
(photo gallery)

Energy production plant, supplied with 50 kWel biomass


(synthesis gas from the pygas) supplied with forest waste
- DETAILS IN THE CO-GENERATING SECTION Calabria (Italy)
CERTIFICATIONS
The choices of the company Tecnocostruzioni s.r.l. aim to fully satisfy the customer.
We are able to provide turnkey solutions for all your plants; our technicians
(knowledge worker) are carefully handling every detail, from design to
achievement;our specialized staff is subject to continuous training. The know-how
that the company owns and is able to manage is one of the main strengths that give
value to the company, and on which its performance and competitive advantage are
based.

In addition, Tecnocostruzioni s.r.l. holds a quality certificate


UNI EN ISO 9001: 2008 and SOA attestation for the following categories:
OG 11 category II
OG 10 category IIIbis
OG 1 category III
OS 22 category II
OS 30 category IIIbis
CERTIFICATIONS
AUTHORISATIONS
It is authorized according to the Decree dated January 22, 2008 on the safety rules
for plants, installation, transformation and maintenance of the plants referred to in
Article 1 of the Decree no. 37/2008 as follows:
•point A: plants for the production, transformation, distribution, use of electricity,
weathering protection systems as well as systems for the automation of doors, gates
and barriers;
•point B: radio and television systems, antennas and electronic systems in general;
•point C: Heating, air conditioning and refrigeration systems of any kind and type,
including disposal works for the combustion and condensate products, and rooms
ventilation and air duct;
•point D: Hydrological and sanitary plants of any kind and type;
•point E: Plants for the distribution and use of any kind of gas, including disposal works
for the combustion and condensate products, and rooms ventilation and air duct;
•point F: lifting systems for goods and persons by means of lifts, cranes, ladders and
other similar machines;
•point G: fire protection systems
REFERENCES

990kWp high power photovoltaic plants from Contrada Buffi in Agro di Brindisi for a total installation of
10MW including the installation of the equipment inside the peripheral field booths to connect to the
medium voltage ring.
- Value of contracts: 312.957,00 €
- Execution period: 2010

Implementation of photovoltaic plants and electrical installations to convert the low voltage into medium
voltage and electricity distribution in alternating and continuous power to the 1MWp photovoltaic plant
located in Madama Giulia Contrada in Agro di Banzi (PZ) and the relative ENEL connection in entry / exit
with earthed AL cable and the installation of two main pillars.
- Value of contracts: 185.000,00 €
- Execution period: Start of works: June 15, 2010 Completion of works: April 05, 2011

Implementation of electrical installations, equipment interconnections, electromechanical installation of


the inverter booth and the ENEL-user-measure booth for the photovoltaic installations of the company
Nova Rocchi Srl in the sites located in Banzi (PZ), Foggia (Fg), Cerveteri (Rm), Sulmona (Aq) ), Silvi (Te).
- Value of contracts: 101.999,67 €
- Execution period: 2011-2012

Regular and extraordinary maintenance at the Photovoltaic parks located at Lecce, Taranto and Brindisi for
the company Egidio & Partners Srl;
- Value of contracts: 250.000,00 €
- Execution period: 2012-2013
REFERENCES

The company Tecnocostruzioni s.r.l.s can be proud of optimal references in the field of industrial plants,
such as:

Treatment Plant from Scicli (RG);


Lifting system from Sicli (RG);
Treatment plants from Bari Est, Bari Ovest and Bitonto (4 AQP field)
Desalination system from Reggio Calabria;
Treatment plant from Arenas di Cagliari .
Treatment plant from Reggio Calabria;
Fire protection system at San Giacomo Hospital in Monopoli;
Treatment plant from “Su Tuvu” – Nuoro;
Treatment plant from Marco Simone Village in Guidonia Commune (RM)
Treatment plant from Bresso – Niguarda (MI)
Water uptake plant from Anconella (FI)
REFERENCES

The following accomplished works are added to our experience in implementing special technological plants:

Restoration of the Tedone di Ruvo (BA) Science High School;


- Value of contracts: 128.860,00 €
- Execution period: Start of works: February 27, 2003
Completion of works: February 11, 2004

PIF construction at the Bari Port Authority;


- Value of contracts: 200.024,62 €
- Execution period: Start of works: May 30, 2003
Completion of works: May 27, 2004

Plants layout in the Recovery Therapeutic Community in Modugno;


- Value of contracts: 228.919,03 €
- Execution period: Star of works: October 28, 2004
Completion of works: May 05, 2006

Bitonto Hospital internment Section;


-Value of contracts: 171.126,90 €
- Execution period: Start of works: February 04, 2005
Completion of works: February 28, 2006
REFERENCES

Design and construction of a desalination plant and accessory works in S. Giorgio in Reggio Calabria
- Value of contracts: 360.000,00 €
- Execution period: Start of works: July 12, 2005
Completion of works: October 09, 2006

Adaptation works at D. Lgs. No. 152/99 to plants in the Territorial Domain no. 9 Acquedotto Pugliese;
- Value of contracts: 500.000,00 €
- Execution period: Start of works: May 09, 2006
Completion of works: June 21, 2007

Asylum Villa Romanelli (IPRAB) in Monopoli.


- Value of contracts: 75.000,00 €
- Execution period: 2006/2007

Warehouse layout at Stormo 36 A.M. Gioia del Colle (BA) for C.G.T. – VITROCISET;
- Value of contracts: 72.852,00 €
- Execution period: Year 2007

Conversion and primary distribution plants at S. Raffaele Hospital In Milano; Medium voltage electrical
booths lots C2-E1-D1 and ring closure to C1 medium voltage network;
- Value of contracts: 337.845,00 €
- Execution period: 2007-2008
REFERENCES

Re-qualification of the public lighting plant in the historic center of Loseto (Bari).
- Value of contracts: 144.964,76 €
- Execution period: Start of works: September 10, 2007
Completion of works: February 18, 2009

Electrical wiring of electrodomestics, panels and PCCs and implementation of electrical plants at the
Desalination plant in Reggio Calabria;
- Value of contracts: 250.000,00 €
- Execution period: Start of works: June 10, 2015 Completion of works: July 18, 2015

Electrical plants and fire detection systems at San Giacomo Hospital in Monopoli.
- Value of contracts: 300.000,00 €
- Execution period: Start of works: September 15, 2012 Completion of works: July 14, 2013

Extraordinary maintenance with normative adaptation of the first floor of the internment department of
the Santa Croce Hospital Complex in Fano for the positioning of the Orthopedics and Traumatology
Department.
- Value of contracts: 409.448,79 €
- Execution period: Start of works: January 07, 2009 Completion of works: July 22, 2010

The layout of the market in Via Montegrappa on the site called "Ex Palmiotto. Implementation of electrical
plants and external lighting.
- Value of contracts: 504.482,79 €
- Execution period: Start of works: April 10, 2010 Completion of works: September 19, 2011
REFERENCES

Military Aeronautics: Layout of the conversion booth from medium to low voltage, including executive
design and training course for qualification of electrician staff. Location: Amendola Airport Unit 32 - Decree
Geniodife no. 32 of August 24, 2009.
- Value of contracts: 83.880,50 €
- Execution period: Start of works: July 05, 2010 Completion of works: September 30, 2010

Medium Voltage / Low Voltage layout booth Spada Nord P.G. no. 295 at the Military Aeronautics Unit 36 in
Gioia del Colle (BA)
- Value of contracts: 41.424,14 €
- Execution period: January 26, 2011 - February 24, 2011

Supplying and commissioning of site plants and equipment for "Completion and adaptation works at D.L.
152/06 at the wastewater treatment plant for servicing the community in Ischitella (FG) village;
- Value of contracts: 45.000,00 €
- Execution period: year 2012

Improvement and adaptation of the treatment plant for servicing the community in Montefiore dell’Aso and
the implementation of leakage filters plant in Sant'Antonio in Montedinove village;
- Value of contracts: 45.000,00 €
- Execution period: year 2012
REFERENCES

Executive design, supply and commissioning of the electrical booth and related installations, equipment
and cable channels at the mine in Genna Tres Montis - Silius (CA)”;";
- Value of contracts: 235.170,79 €
- Execution period: Start of works: February 27, 2012
Completion of works: May 02, 2012

Completion works of the Nuoro sewage scheme and the related sewage system. Lot 2 Treatment Plant in
“Su Tuvu”;
- Beneficiary: Acciona Agua SA
- Value of contracts: 240.000,00 €
- Execution period: 2011-2012

The supply and the commissioning of the equipment for the adaptation of the lighting system of the Is
Arenas (CA) treatment plant;
- Beneficiary: Acciona Agua SA
- Value of contracts: 122.000,00 €
- Execution period: year 2013

Completing the lighting system of the communal football field in Liveri (NA) village
- Beneficiary: Liveri City Hall
- Value of contracts: 88.849,70 €
- Execution period: year 2012
REFERENCES

Designing, supplying and commissioning of the electrical panels for the groundwater drainage system of the
Genna Tres Montis mine in Silius and S. Basilio (CA) villages;
- Beneficiary: Fluorite di Silius SpA
- Value of contracts: 101.600,00 €
- Execution period: April 15, 2013 - April 18, 2013

ENEL connection for the 999kW biogas plant with the supply and commissioning of the approved ENEL
booth - user-measure with medium voltage compartments and Trafo booth - low voltage with 1250 kVA
Trafo, QGM retaining booth (General Equipment Panel) and Fire Protection System in Banzi (PZ).
- Beneficiary: Sardone Raffaele
- Value: 350.000,00 €
- Execution period: 2012-2013

Civil and power plants, supplying and commissioning the cable ducts and power, control and command
cables, including equipment interconnection and testing, supplying and commissioning the photovoltaic
plant, supplying and commissioning the internal and external lighting systems at the Marco Simone
wastewater treatment plant in Guidonia(RM) commune;
- Beneficiary: Acciona Agua SA
- Value: 515.000,00 €
- Execution period: 2013-2014

Supplying and commissioning the electrical panels for the Treatment and water uptake plants lots 1, 4, 5, 6
in Cities of Cagliari, Nuoro, Olbia Tempio and Sassari;
- Beneficiary: Acciona Agua SA
- Value: 415.000,00 €
- Execution period: 2013-2014
REFERENCES

Implementation of an intergenerational aggregation center by restoring a building owned by Bernalda (MT)


City Hall;
- Beneficiary: Bernalda (MT) City Hall
- Value: 343.301,75 €
- Execution period: 2013-2014

Design and Execution Works for the Modernization / Renewal of Cabin No. 7 of P.G. - Military Aeronautics -
LAMPEDUSA (AG)
- Beneficiary: Military Aeronautics - Department 3 Genio
Value: 93.520,93 €
Execution period: Start of works: 2014 - Works in progress

Supplying and commissioning the power distribution lines, signals and cable ducts, local outlets and UPDR-
500 peripheral units to carry out Phase 1 works - Section 2 of the Biological Denitrification Scheme of the
Bresso - Niguarda Treatment Plant (MI)
- Beneficiary: Acciona Agua SA
- Value: 300.000,00 €
- Execution period: 2014-2015

Electrical and Electromechanical Works in the Field of Regular and Extraordinary Maintenance Works of the
Water Treatment Plant located in Contrada Coda di Volpe in Rende (CS)
- Beneficiary: GEKO SpA
- Value: 234.228,00 €
- Execution period: 2014-2015
REFERENCES

5-Electrical and programming works for the construction of filters called "Panels 12" at the Anconella water
uptake plant in Florence (FI)
- Beneficiary: Acciona Agua SA
- Value: 615.000,00 €
- Execution period: 2015-2016

Supplying and commissioning the electrical panels for Sardinia sewage lifting systems
- Beneficiary: Acciona Agua SA
- Value: 340.000,00 €
- Execution period: year 2016

Energy efficiency works at "G.B. Castelli” school in Altamura (BA): implementing the photovoltaic plant,
Gas Modular Heat Station with condensation for interiors, Thermal Solar Plant, rainwater recovery and
reuse plant, Internal electrical plant, internal and external lighting system, Supplying and commissioning
the electrical distribution panels.
- Beneficiaries: Altamura City Hall (BA)
- Value: 102.000,00 €
- Execution period: year 2016

Supplying and commissioning the electrical panels for sewage lifting systems Lot 3 and Lot 4 - Sardinia
- Beneficiary: Acciona Agua SA
- Value: 510.000,00 €
- Execution period: year 2016
REFERENCES

Supplying and commissioning the electrical panels for sewage lifting systems and Treatment Plants Lot 3
and Lot 4 - Sardinia
- Beneficiary: Acciona Agua SA
- Value: 362.000,00 €
- Execution period: year 2016

Supplying and commissioning the electrical panels for the sewage lifting systems in Sardinia-different lots
- Beneficiary: Acciona Agua SA
- Value: 439.000,00 €
- Execution period: year 2017

Implementation of electrical installations for the supply of the new electromechanical and electronic
devices, implementation of electrical installations for the supply of the new electrical panels for start-up,
protection and control of the new appliances and interventions on the existing electrical installations in
order to obtain the Certificate of Conformity provided by the current Normative act in force, with the
issuance of Certificates for Wastewater Treatment Plants and Lifting Systems located in Sardinia - Lots 3, 4
and 5
- Beneficiary: Acciona Agua SA
- Value: 220.400,00 €
- Execution period: year 2017
REFERENCES

Electric works, Supply and commissioning of electrical panels, the design and programming of the
equipment for the implementation and management of a demineralized water treatment, production and
supply plant for Saras Refinery in Sarroch (CA)
- Beneficiary: Acciona Agua SA
- Value: 355.000,00 €
- - Execution period: year 2017

Supplying electrical devices and fitting on the inside 2 containers for the Low Voltage Booth and for the
Medium Voltage Booth for the implementation and the management works of a demineralized water
treatment, production and supply plant for the Saras Refinery in Sarroch (CA)
- Beneficiary: Acciona Agua SA
- Value: 482.000,00 €
- Execution period: year 2017

Completion works of the Hydrological Scheme for the Digul di Torrente Menta, Hydroelectric Plant
Downstream Works - Works for the Layout and Completion of the Electrical and Technological Plants-
- Beneficiary: IPOT S.C.a.r.l.
- Value of contracts: 193.700,00 €
- Execution period: year 2017

Supplying the electric panel for Bonorva (SS) Treatment Plant


- Beneficiary: Acciona Agua SA
- Value: 55.000,00 €
- Execution period: year 2017
REFERENCES

General information about the company


Legal entity: Limited liability company with sole shareholder
Share capital: 10.400,00 euro i.v.
Fiscal Code and unique registration code: 04996660728
Registration to C.C.I.A.A .: Bari no. 386466 (REA)
Registered / Operative Headquarters: Via della Roverella 14/16 -Altamura 70022
Tel. 080/3117228 – Fax. 080/3104241
E-mail: amministrazione@tecnocostruzionisrl.net |
ufficiotecnico@tecnocostruzionisrl.net | acquisti@tecnocostruzionisrl.net
PEC: tecnocostruzionisrl@pec.it
Title: P.I. Iacovone Antonio
Sole manager: P.I. Iacovone Antonio - mobile 337/283744
Technical director: P.I. Iacovone Antonio
Technical Director for SOA purposes: Ing. Lomurno Antonio
Technical Officer: Ing. Lomurno Antonio
Purchasing Department: P.I. Iacovone Antonio/ Ing. Lomurno Antonio
Technical Department and Administrative Department: Ing. Lomurno Antonio
Technical officers: No / 2
Administrative officers: no. 1
Qualified workers: no. 6
Specialized workers: no. 5
Organizational structure and working methods
Administrative headquarters 100 sqm.
Technical Department 50 sqm.
Meetings and training hall 50 sqm.
Hall / Warehouse 50 sqm
.
REFERENCES

Equipment list

No. 2 Dual Band PMR / LPD - Midland G7 XT walkie-talkies.


No. 1 TRMS digital amperemeter ELDES – ELD 115
No. 1 ELDES distance meter SW - 104QL - Distance meter/ Area/Ultrasonic volume with laser beams indicator
No. 1 Analog / digital polymer multimeter. ELDES - F-203
No. 1 Compact Digital Multimeter HD Mode. HT21
No. 1 Multimeter FLUKE 179
No. 1 Digital Lux Tester HT mode. HT1065
No. 1 multifunction check tool mode HT. HT-GSC57 - Integrated tool for electrical checks, network analyzes in
Monophase and Three Phase installations and measurement of environmental parameters.
No. 1 Automatic step and contact voltage measuring unit mode HT. HT2052
No. 1 Cembre TIP HT 131-C Compression hydraulic tool
No. 1 Cembre TIP HT 131 - UC Compression hydraulic tool
No. 1 BURNDY Y35 crimping tool
No. 1 AMS AV6220 cable stripper kit
No. 1 AV8320 cable stripper kit
No. 1 SIEVERT device for connecting to gas cylinders for welding and heat shrinking
No. 1 FAR KJ28 Riveting machine
No. 1 BROTHER labeling machine mode P.Touch 2000
No. 1 3 M polymer printer mode PL200
No. 1 Impex ST-H68E Grooving tool
No. 2 Cable cutters
REFERENCES

No. 1 Elevator RIO 100 - 100 kg lifting capacity elevator


No. 1 TIRFOR Twine Crane - Capacity 800 kg
No. 1 MAKITA power drill mode 2051F - rotation + percussion function;
No. 3 WURTH power drill mode H20-SLE and H24-MLE
Nr. 1 Rotary Hammer with HITACHI batteries mode DH20DV
No. 1 MAKITA power drill mode DBM130
Nr. 1 Rotary Hammers with MAKITA batteries mode BHR200
No. 1 jackhammer HITACHI DH50
No. 1 MAKITA Angular grinder mode GA9020
No.1 MAKITA Angular grinder mode 9069
No. 1 WURTH axial grinder mode GS600
No. 1 RUPES grinder
No. 2 Coil lifting devices - Capacity 4000 Kg
No. 2 Cable threading probes
No. 5 Cable threading roles
No. 2 Polieri and DF Transpalets - Capacity 2000 Kg
No. 1 Linde H25D / 351 lift truck - Capacity 2500 Kg
No. 2 Telescopic ladders made of aluminum briko-pro model 5 + 5 steps and 6 + 6 steps
N° 1 Volta Macchine VM1000TA
REFERENCES

Vehicle list

IVECO FIAT TRUCK 135 - (Registration number TO43096N):


Capacity 5650 kg;
Trilateral tipper;
Fassi Pneumatic crane with rear cabin - Crane capacity 4750 kg;

VAN NISSAN NT400 – (Registration number FG887WA):


Capacity 500 kg;
Effer Pneumatic crane with rear cabin

VAN OPEL MOVANO (Registration number EH101NH):


Capacity 1395 kg;

VAN PEUGEOT PARTNER - (Registration number FA715ZP):


Capacity 666 kg;

VAN FIAT DOBLO’ - (Registration number FG081VX):


Capacity 659 kg;

You might also like