0% found this document useful (0 votes)
190 views16 pages

Fire Fighting System Progress Report KSA

This document summarizes fire protection work being done at an oil plant in Saudi Arabia. It includes installing underground piping and hydrants, fire protection systems for tanks using water and foam, a fire alarm system, FM-200 and CO2 systems for buildings, and firefighting systems for various facilities. Progress updates are provided for aspects like underground piping installation and delivery of valves for tank protection systems. The work also involves installing emergency lighting, exit signs, and fire pumps.

Uploaded by

parthiv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
190 views16 pages

Fire Fighting System Progress Report KSA

This document summarizes fire protection work being done at an oil plant in Saudi Arabia. It includes installing underground piping and hydrants, fire protection systems for tanks using water and foam, a fire alarm system, FM-200 and CO2 systems for buildings, and firefighting systems for various facilities. Progress updates are provided for aspects like underground piping installation and delivery of valves for tank protection systems. The work also involves installing emergency lighting, exit signs, and fire pumps.

Uploaded by

parthiv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd

Fire Fighting

Progress Work
Saudi Technology Base Lupe Oil Plant
KSA- Alkharj – 2014
Contractor : NAFFCO
Fire Fighting and Fire
Protection System
• Under Ground / HDPE works
• Fire Protection works for Tanks (water , foam)
• Fire Alarm
• FM-200 & CO2 In control Building
• Fire fighting system for facilities (process area ,
warehouse , oil pumping station , others)
• Emergency Light & Exit sign system
• Fire Fighting pump installation
Under Ground / HDPE
Works
• Welding HDPE Pipes & installation “1st Fixing”
• Fixing Hydrant , Monitors & Valves “2nd Fixing”
HDPE / Pipes Welding &
st
Installation “1 Fixing”
HDPE Installation
100%

80%

60% Zone 1-9


Zone 10
40%
Complete
20%

0%
Progress
HDPE / Fixing “2nd Fixing”
Hydrant , Monitors & Valves

100% 100%
60%
50% 10%
0% 0%
0% 0%

Installation
Delivery

Hydrant Monitors Valves


Fire Protection works for
Tanks (water , foam)
Fire Protection works
st
“1 Fixing”
Fire Protection works
nd
“2 Fixing”
• Installation of deluge valves
• Installation of foam chamber
• Installation of water spray nozzles

Progress Installation & Delivery


Deluge Valve Foam chamber
Water spray nozzle
100%

33% 33%
17%
0% 0%

Installation Delivery
Fire Alarm System
Fire Alarm System
• Installation of EMT (Electrical Metallic Tube) for
indoor units
• Installation of RMC ( Rigid Metal Conduit) For
outdoor units
• Installation of fire alarm cable
• Installation of Equipments ( detectors , sounders ,
panels , module box )
Fire Alarm Installation
FM-200 & CO2 System
FM-200 & CO2 System
• Installation of pipes
• Installation of EMT & Cabling
• Installation of gas cylinders ( FM-200 Or CO2)
• Installation of Alarm devices ( smock detector ,
remote indicator , abort switch , gas release , strobe
light , CP )
Fire fighting system for facilities
• Processing tower
• Warehouse
• Oil pumping station
• Hot oil package
• Boiler package
• Admin Building
• Guard house
Emergency Light & Exit
sign system
Fire Fighting pump
installation