Introduction
“Data integrity is the maintenance of, and the assurance of the accuracy and
consistency of, data over its entire life-cycle”.

To ensure Data Integrity and accuracy as per the executed work , ABD (As-Built
Drawings) are being uploaded in GIS/NE for further future Real-Time Monitoring of
sites during Operation.
STATUS OF ABD UPDATION OF AUXILIARY LINKS AS ON 25.04.18
RFE2 Accepted by CMM Till Date Received at NHQ ABD Data Not Received from
Completed by NHQ- Link Received to NHQ %age BTG of Auxiliary
Zone Jio State (No of LInks) from Circle Circle
NPE (Nos) (Avg. of 3 weeks) Network links w.r.t. RFE2
(No. of Links) (No. of Links)
Grand Total 12374 4844 4071 178 7530 63%
North 3344 1484 1274 50 1860 56%
Delhi 664 289 248 6 375 56%
Haryana 257 90 79 0 167 65%
Himachal Pradesh 160 113 113 0 47 29%
Jammu 69 54 52 1 15 22%
Kashmir 99 55 43 2 44 44%
Punjab 515 97 76 6 418 81%
Rajasthan 693 292 262 11 401 58%
Uttar Pradesh (East) 410 183 164 15 227 56%
Uttar Pradesh (West) 331 190 176 9 141 43%
Uttarakhand 146 121 61 0 25 25%
East 1946 801 675 45 1145 59%
Assam 179 80 62 7 99 58%
Bihar 326 125 110 10 201 62%
Jharkhand 302 67 51 2 235 78%
Kolkata 433 145 138 5 288 67%
North East 167 96 49 8 71 43%
Odisha 190 100 79 7 90 47%
West Bengal 349 188 186 5 161 46%
West 3001 1578 1357 61 1423 49%
Chhattisgarh 274 132 120 4 142 53%
Goa 69 58 50 4 11 16%
Gujarat N 449 186 132 12 263 59%
Gujarat S 154 139 136 3 15 10%
Madhya Pradesh 598 332 310 3 266 46%
Maharashtra 701 141 113 12 560 80%
Mumbai 756 590 496 23 166 27%
South 4083 981 765 23 3102 79%
Andhra Pradesh 607 133 124 3 474 78%
Karnataka 1038 74 55 5 964 93%
Kerala 555 372 365 3 183 33%
Tamil Nadu 725 243 73 7 482 85%
Telangana 1158 159 148 5 999 86%

ABD Pendency has been informed criticality if ABD to respective SCH/EL and are being monitored on regular basis during the weekly VC
with all states to close the ABD BTG Gap.
STATUS OF ABD UPDATION OF AUXILIARY LINKS AS ON 25.04.18
RFE2 Accepted by CMM ABD Data Not Received
Till Date Received at NHQ Completed by Link Received to NHQ ABD Data Received from Field %age BTG of Auxiliary
Zone Jio State (No of LInks) from Circle
(No. of Links) NHQ-NPE (Nos) (Avg. of 3 weeks) to Circle (No. of Links) Network links w.r.t. RFE2
(No. of Links)
Grand Total 12374 4844 4071 178 7530 1904 63%
North 3344 1484 1274 50 1860 200 56%
Delhi 664 289 248 6 375 200 56%
Haryana 257 90 79 0 167 Data Awaited 65%
Himachal Pradesh 160 113 113 0 47 Data Awaited 29%
Jammu 69 54 52 1 15 Data Awaited 22%
Kashmir 99 55 43 2 44 Data Awaited 44%
Punjab 515 97 76 6 418 Data Awaited 81%
Rajasthan 693 292 262 11 401 Data Awaited 58%
Uttar Pradesh (East) 410 183 164 15 227 Data Awaited 56%
Uttar Pradesh (West) 331 190 176 9 141 Data Awaited 43%
Uttarakhand 146 121 61 0 25 Data Awaited 25%
East 1946 801 675 45 1145 370 59%
Assam 179 80 62 7 99 80 58%
Bihar 326 125 110 10 201 25 62%
Jharkhand 302 67 51 2 235 67 78%
Kolkata 433 145 138 5 288 0 67%
North East 167 96 49 8 71 28 43%
Odisha 190 100 79 7 90 20 47%
West Bengal 349 188 186 5 161 150 46%
West 3001 1578 1357 61 1423 624 49%
Chhattisgarh 274 132 120 4 142 36 53%
Goa 69 58 50 4 11 8 16%
Gujarat N 449 186 132 12 263 150 59%
Gujarat S 154 139 136 3 15 10 10%
Madhya Pradesh 598 332 310 3 266 170 46%
Maharashtra 701 141 113 12 560 250 80%
Mumbai 756 590 496 23 166 Data Awaited 27%
South 4083 981 765 23 3102 710 79%
Andhra Pradesh 607 133 124 3 474 110 78%
Karnataka 1038 74 55 5 964 140 93%
Kerala 555 372 365 3 183 160 33%
Tamil Nadu 725 243 73 7 482 Data Awaited 85%
Telangana 1158 159 148 5 999 300 86%

ABD Pendency along with its criticality has been informed to respective SCH/EL and are being monitored on regular basis during the weekly
VC with all states to close the ABD BTG Gap.
STATUS OF ABD UPDATION OF AUXILIARY LINKS AS ON 25.04.18
LM Link where RFE2 Accepted by CMM Completed by NHQ- ABD Data Received from %age BTG of Auxiliary
Till Date Received at NHQ Link Received to NHQ ABD Data Not Received
Zone Jio State Plan is released (No of Links) NPE Field to Circle w.r.t. BTG Network links w.r.t.
(No. of Links) (Avg. of 3 weeks) (No. of Links)
(No. of Links) (No. of Links) (No. of Links) RFE2
Grand Total 23607 12374 4844 4071 178 7530 1904 63%
North 5982 3344 1484 1274 50 1860 200 56%
Delhi 1133 664 289 248 6 375 200 56%
Haryana 404 257 90 79 0 167 Data Awaited 65%
Himachal Pradesh 269 160 113 113 0 47 Data Awaited 29%
Jammu 125 69 54 52 1 15 Data Awaited 22%
Kashmir 151 99 55 43 2 44 Data Awaited 44%
Punjab 924 515 97 76 6 418 Data Awaited 81%
Rajasthan 1098 693 292 262 11 401 Data Awaited 58%
Uttar Pradesh (East) 1022 410 183 164 15 227 Data Awaited 56%
Uttar Pradesh (West) 616 331 190 176 9 141 Data Awaited 43%
Uttarakhand 240 146 121 61 0 25 Data Awaited 25%
East 3447 1946 801 675 45 1145 370 59%
Assam 379 179 80 62 7 99 80 58%
Bihar 634 326 125 110 10 201 25 62%
Jharkhand 490 302 67 51 2 235 67 78%
Kolkata 675 433 145 138 5 288 0 67%
North East 262 167 96 49 8 71 28 43%
Odisha 393 190 100 79 7 90 20 47%
West Bengal 614 349 188 186 5 161 150 46%
West 6095 3001 1578 1357 61 1423 624 49%
Chhattisgarh 479 274 132 120 4 142 36 53%
Goa 197 69 58 50 4 11 8 16%
Gujarat N 949 449 186 132 12 263 150 59%
Gujarat S 251 154 139 136 3 15 10 10%
Madhya Pradesh 1146 598 332 310 3 266 170 46%
Maharashtra 1646 701 141 113 12 560 250 80%
Mumbai 1427 756 590 496 23 166 Data Awaited 27%
South 8083 4083 981 765 23 3102 710 79%
Andhra Pradesh 1351 607 133 124 3 474 110 78%
Karnataka 2176 1038 74 55 5 964 140 93%
Kerala 1010 555 372 365 3 183 160 33%
Tamil Nadu 1659 725 243 73 7 482 Data Awaited 85%
Telangana 1887 1158 159 148 5 999 300 86%

• ABD Pendency along with its criticality has been informed to respective SCH/EL and are being monitored on regular basis during the
weekly VC with all states to close the ABD BTG Gap.
• All circles are told to submit the Liquidation plan for ABD Link updation in GIS/NE
Mitigation Plan For Closing ABD BTG

• Team Strength of Construction GIS Manpower to be enhanced.


• Team Strength of Circle NPE Team to be enhanced for faster PDA generation, as
same Team are busy with FTTX, Intracity, Auxiliary links updation.
• Data submission from Field to Construction/Circle GIS to be expedited.
• ECN Issues to be resolved on priority for uploading of ABD in GIS/NE.
• Data recovery of old RFE2 links to be expedited at circle level where FE/MPCM
have changed.
• Pursuing NHQ GIS/NPE Team for formulation of Guideline for ABD updation of Co-
Located sites.
• Guideline to be formulated by NHQ GIS/NPE Team for sites which are RFE2 done
on Interim UBR and on Aerial till UG permission is granted.
Thank You