Professional Documents
Culture Documents
Summary :
Totally 232 site contributor degraded payload has been CR at
29 jan @00.00 – 02.00
CR with Criteria :
•. Adjust +3db 3G CIOFFSET to target Worst site
• Increase 3G CPICH with Maximum to 15%
• Increase Rs power LTE with total output power still same at
Cell L1800 & L2300