Professional Documents
Culture Documents
Strastt DSGJKJ
Strastt DSGJKJ
Outline
History
Value Concept
Case Study
Conclusion
History
Lawrence D.Miles
1904 - 1985
Worth Function(Utility)
Value = =
Cost Cost
Waste Cost
2. Lack of information
3. Lack of Ideas
4. Negative Prejudice
5. Lack Of Experience
7. Multi Concept
…
What is Value Engineering?
What is Value Engineering?
1. Orientation
2. Information
3. Functional
4. Creative
5. Evaluation
6. Development
7. Presentation
8. Implementation and Follow-up
The Job Plan
1. Orientation Phase
Identify issues
Prioritize Issues
Collect Data
...
The Job Plan
2. Information Phase
3. Functional Phase
“ Boil Water ”
Verb Noun
The Job Plan
4. Creative Phase
5. Evaluation Phase
6. Development Phase
7. Presentation Phase
2. Reduce cost
3. Improve quality
7. Identify problems
3. Functional analysis
4. Creativity Worksheet
5. Evaluation sheet
6. Cost analysis
7. Result
Case Study
• The present specifications of this part and its material used are
costlier than the average industry cost.
*{1$=56 rupee}*
Case Study
i. Change design
ii. Change material
iii. Use plastic
iv. Make it lighter
v. Change the production process
vi. Use nylon indexing unit
Case Study
5. Evaluation Phase
A. Function
B. Cost
C. Maintainability
D. Quality
E. Space
each of the above criteria was compared with others , and depending on
their relative importance, three categories were formed, major, medium,
and minor.
Case Study
The above ideas were discussed and the best feasible ideas
were separated which were:
6. Cost Analysis
Case Study
7. Result