Professional Documents
Culture Documents
Presented by:
Group B (Roll No 14 to 27)
Technical Refresher Course (Pre-promotion)
for Senior Engineers (BPS-18 to BPS-19)
25.03.2019 to 19.04.2019
Hafiz Muhammad Noman Saleem
Calibration Section
Testing Lab
R&D Section
Imran Hameed
Bar code applied on meter. Last six digits are meter internal No
Name Plate having meter data, P.O. No and Client Name is fixed
Testing
Testing Lab
Test of insulation properties
• Accuracy Test
Testing Continues
Testing Lab
Test of Influence Quantities
Testing Contiues
Testing Lab
Test of electromagnetic Compatibility (EMC)
• ESD test
• Surge Immunity Test (4KV pulse, 5 –ve /+ve pulses, 1.2/50 micro sec
Testing Lab
Test to climatic environment
• Cold test
Testing Contiues
Testing Lab
Mechanical Tests
• Vibration Test
• Shock Test
• Spring Hammer Test
• Dust Test
• Rain Test
• Test of resistance to heat
and fire (960oc for terminal,
650oc for cover, 30 Sec time,
no fire catch)
Testing Lab
Miscellaneous requirements
• Verification for limit range operation
• Test of influence of extreme temperature conditions
• Influence of Radar Magnet (0.7 Tesla)
• Protection against extreme interference
• Accuracy with & without Neutral of static meter
• Initial Start up test
• Voltage limit range of operation
• Dimmer Test
Zabeh Ullah
Testing Contiues
Testing Lab
Miscellaneous requirements
• Security and Diagnostic test
• Test of Terminal block material (ISO 75)
• Test of Battery life
• Verification of dimensions and components
• Neoprene Rubber Gaskit verification
• Tin Coating measurement test
• Impact Test
Malik Tariq Raza