Professional Documents
Culture Documents
Steam purity
Sample flow reliable Waiting for Start steam
acc. to acid
existing results steam purity turbine
conductivity
Steam purity
Sample flow reliable Start steam turbine,
acc. to
existing results Steam purity according DAC achieved
degassed acid
conductivity
indicator
degassed
conductivity
specific
specific
conductivity
conductivity air filter
acid
conductivity
Advantages Disadvantages
no expulsing of other volatile moving parts in the spinning disc
substances reactor
measurement under standard additional consumables
conditions (temperature, (CO2 - absorber, lifetime per
pressure) filling: 12 month)
low power consumption
(no boiling requiered)
no inert gas required
Procedure
2 Tests within 6 month
Operation in 2 GuD - plants in Germany
(Benson – Boiler)
Measurements
HP Live Steam and Feedwater
2 cold starts, 7 warm starts, 2 hot starts
acid conductivity
degassed
conductivity
conductivity [µS/cm]
specific conductivity
acid conductivity
degassed
conductivity
time [hh:mm]