REASONS TO CONTROL SAND PRODUCTION

The control of sand production is a complicated issue that can not be addressed through a unilateral
approach. On the contrary, operators have adopted a multifaceted approach, which exploits the wide
range of technologies and special expertise available to handle this problem.
SELECTION CRITERIA

• ECONOMICAL

• HISTORICAL
BACKGROUND

• APPLICABILITY

• DURATION OF
SERVICE
Mechanical Methods
Packing with internal gravel.

Blind pipe

Sieve
Perforations

Gravel

Production
casing

https://www.slb.com/~/media/Files/resources/oilfield_review/spanish04/sum04/p10_29.pdf
Packing with external gravel

Production
casing

Filter
cake
Gravel

Sieve

Open
Hole

https://www.slb.com/~/media/Files/resources/oilfield_review/spanish04/sum04/p10_29.pdf
• They offer a short productive life.
• His tamponade is very feasible.
Grid without • In open hole, unconsolidated formations can
produce collapse when producing the well.
packing with • It is not recommended to use lining and grid
without packaging, since 10% of the sand
gravel produced is less than the openings of most
commercial grids.

• It allows to install the sand control in a producer


Packing with well without having to remove the completion.
• It is necessary to know the dimensions of the pipe
gravel through and the casing, as well as the minimum
restrictions within the well.
the production • Recommended in low production wells where the
costs associated with the drill exceed the
economic limit.
pipeline