Presentation With Picture - Revised IRR (Infra)
Presentation With Picture - Revised IRR (Infra)
INFRASTRUCTURE PROJECTS
2
PROCUREMENT LAWS / GUIDELINES
3
PROCUREMENT LAWS / GUIDELINES
4
PROCUREMENT LAWS / GUIDELINES
5
PROCUREMENT LAWS / GUIDELINES
6
REVISED IMPLEMENTING RULES
& REGULATIONS of R.A. 9184
Bid Submission
Pre-Bid Evaluation
Conference Technical
Financial &
Documents Ranking
Documents
Post-qualification Award of
Contract
8
Procedural Steps for at least 12 c.d.
prior to bid
Advertisement Pre-Bid
/Posting Conference
Pre Procurement
7 c.d.
Conference
Issuance of
Bid Documents
Bid submission
Post-qualification Award of
Contract
7 c.d. 9
Section 20. Pre-Procurement Conference
Section 13.3
Observers shall be invited at least 3 c.d. before the date of
procurement stage/activity.
(Approved Notice, appropriate documents )
10
Section 20. Pre-Procurement Conference
A forum to discuss:
a. Description, scope of work, ABC, duration
of the project
(Sec. 7.5 – The ABC as reflected in the APP or PPMP shall be
at all times consistent with the appropriations for the project
authorized in the GAA.)
b. Accordance with the PPMP & APP
(Sec. 7.2 – No Procurement shall be undertaken unless it is in
accordance with the approved APP of the procuring entity.)
11
Section 20. Pre-Procurement Conference
A forum to discuss:
12
Section 20. Pre-Procurement Conference
A forum to discuss:
f. Importance of confidentiality
13
14
Section 20. Pre-Procurement Conference
• General Rules :
16
Bids and Awards Committee
Section 11. BAC and its Composition
17
Bids and Awards Committee
Section 11. BAC and its Composition
22
Section 20. Pre-Procurement Conference
Who shall attend
• BAC
• SECRETARIAT
• Consultants, if any
• Observers
Functions
26
Bids and Awards Committee
Section 13. Observers
CRITERIA:
1. Knowledge, experience or expertise in procurement or in the
subject contract to be bid;
2. Absence of actual or potential conflict of interest in the
contract to be bid;
3. Other relevant criteria that may be determine by the BAC
27
Procedural Steps for at least 12 c.d.
prior to bid
Advertisement/ Pre-Bid
Posting
Pre-Procurement 7 c.d. Conference
Conference
Issuance of
Bid Documents
Bid submission
Post-qualification Award of
Contract
7 c.d. 28
Invitation to Bid
Section 21. Advertising / Posting
30
Invitation to Bid
Section 21. Advertising / Posting
Advertisement Pre-Bid
/Posting Conference
Pre-Procurement 7 c.d.
Conference
Issuance of
Bid Documents
Bid submission
Post-qualification Award of
Contract
7 c.d. 33
Bidding Documents
Section 17. Form and Contents
Contents
• ABC
• Invitation to Bid
• Eligibility Requirements
• Instructions to Bidders
• Scope of work
• Plans/Drawings and Technical Specifications
• Form of Bid, Price Form, BOQ and List of Goods
• Completion Schedule or Delivery Schedule
• Form, Amount, and Validity Period of Bid Security
• Form, Amount, and Validity of Performance Security and
Warranty
• Form of Contract and General and Special Conditions of
Contract
34
Bidding Documents
Section 17. Form and Contents
35
Procedural Steps for at least 12 c.d.
prior to bid
Post-qualification Award of
Contract
7 c.d. 36
Section 22. Pre-bid Conference
38
Procedural Steps for at least 12 c.d.
prior to bid
Advertisement Pre-Bid
/Posting Conference
Pre-Procurement 7 c.d.
Conference
Issuance of
Bid Documents
Bid submission
Post-qualification Award of
Contract
7 c.d. 39
Section 25. Submission & Receipt of Bids
1st Envelope (presence or absence of documents)
1. Eligibility requirements
2. Bid Security
3. Project requirements
- Organizational chart
- List of personnel for the project
- List of equipment units
4. Omnibus sworn statement
- Not blacklisted
- Authentic copies of the original
- Authorizing to verify documents
- Signatory is the duly authorized representative
- Disclosure provision
- Complies with the responsibilities
- Complies with existing labor laws and standards
5. Conflict of Interest, Section II-A-4 (PBD 3rd ed.)
40
Section 23. Eligibility Requirements
Class “A” Documents
Legal Documents
• SEC, DTI or CDA registration
• Mayors Permit for principal place of business
Technical Document
• Statement of all ongoing & completed projects
• Valid PCAB License & Registration Particulars
41
Section 23. Eligibility Requirements
Financial Documents
42
Section 23. Eligibility Requirements
Class “B” Documents
If Joint Venture
43
Section 23. Eligibility Criteria
Legal
44
Section 23. Eligibility Criteria
Technical
46
PCAB Circular No. 001, Series of 2009
Implementation of 2nd Stage Adjustment on
Allowable Ranges of Contract Costs and
Single Largest Project Completed / Track Record Requirements
(Effective 01 July 2009)
47
Section 23. Eligibility Criteria
Financial
Advertisement Pre-Bid
/Posting Conference
Pre-Procurement 7 c.d.
Conference
Issuance of
Bid Documents
Bid submission
Post-qualification Award of
Contract
7 c.d. 49
Section 25. Submission & Receipt of Bids
1st Envelope (Presence or absence of documents)
1. Eligibility requirements (Sec 23.4.3, CRC & CI in lieu of Class “A)
2. BID SECURITY
3. Project requirements
- Organizational chart
- List of personnel for the project
- List of equipment units
4. Omnibus sworn statement
- Not blacklisted
- Authentic copies of the original
- Authorizing to verify documents
- Signatory is the duly authorized representative
- Disclosure provision
- Complies with the responsibilities
- Complies with existing labor laws and standards
5. Conflict of Interest, Section II-A-4 (PBD 3rd ed.)
50
Sections 27 & 39. Bid Security and
Performance Security
Form of Bid Security or Amount of Bid Amount Performance
Performance Security Security Security
(% of ABC) (% of Contract Price)
Cash or cashier’s/managers
check issued by a Universal or Goods & Consulting
Commercial bank 2% Services = 5 %
Bank draft/ guarantee
Irrevocable LC, issued by a Infrastructure
Universal or Commercial Bank
Projects = 10%
Surety Bond callable on
demand issued by a surety or 5% 30 %
insurance company duly
certified by the Insurance
Commission as authorized to
issue such security
Any combination of the Proportionate to share of form with respect to
foregoing total amount of security
51
Section 25. Submission & Receipt of Bids
1st Envelope (presence or absence of documents)
1. Eligibility requirements
2. Bid Security
3. Project requirements
- Organizational chart
- List of personnel for the project
- List of equipment units
4. Omnibus sworn statement
- Not blacklisted
- Authentic copies of the original
- Authorizing to verify documents
- Signatory is the duly authorized representative
- Disclosure provision
- Complies with the responsibilities
- Complies with existing labor laws and standards
checklist
5. Conflict of Interest, Section II-A-4 (PBD3rded.)
*** if non- complying in the 1st Env. return the 2nd Env. unopened
52
Procedural Steps for at least 12 c.d.
prior to bid
Advertisement Pre-Bid
/Posting Conference
Pre-Procurement 7 c.d.
Conference
Issuance of
Bid Documents
Bid submission
Post-qualification Award of
Contract
7 c.d. 53
Section 25. Submission and Receipt of Bids
Second Envelope
(presence or absence of documents)
Advertisement Pre-Bid
/Posting Conference
Pre-Procurement 7 c.d.
Conference
Issuance of
Bid Documents
Bid submission
Post-qualification Award of
Contract
7 c.d. 55
Section 32. Bid Evaluation
Completeness
• No price in required item = non-complying
• Indicating “0” = free to the GOP
• All prices are deemed to include all taxes
Arithmetical corrections
• Bid prices in figures vs words (words prevails)
• Total price vs unit price per item, (unit price prevails)
• Total price vs actual sum of component items, (actual prevails)
• Unit cost in detailed estimate vs unit cost in BOQ, (latter prevails)
If above ABC ---- non complying
Abstract of Bids
56
Procedural Steps for at least 12 c.d.
prior to bid
Advertisement Pre-Bid
/Posting Conference
Pre-Procurement 7 c.d.
Conference
Issuance of
Bid Documents
Bid submission
POSTQUALIFICATION Award of
Contract
7 c.d. 57
Section 34. Post-Qualification
Verification of:
• Legal- licenses, certificates, permits
• Technical – work experience, key personnel;
availability of equipment; - slippage in on-going
projects; authenticity of bid security
• Financial (NFCC or CLC)
• Personnel
58
Procedural Steps for at least 12 c.d.
prior to bid
Advertisement Pre-Bid
/Posting Conference
Pre-Procurement 7 c.d.
Conference
Issuance of
Bid Documents
Bid submission
60
Section 37. Notice of Award
61
Timelines – Earliest Possible Time
PPC Ads/Posting
7
PBC
8
Bid Submission
Issuance of Bid Documents Bid Evaluation
20 Post Qualification
21 Issuance of NOA
22 Contract Preparation & Signing
24 Contract Approval by Higher Authority
Timelines – Latest Possible Time 26
Issuance of NTP
27
For ABC < P50 M ------ 113 c.d 28 c.d.
62
IMPLEMENTATION SCHEDULE - LOCALLY FUNDED PROJECTS
Per Revised IRR of RA 9184, Sept. 2, 2009: & E.O. 423, Series of 2005
revised 8/16/2010/ilp
No. ACTIVITIES NO. OF DAYS DURATION / PARTICULARS SOURCE
1 Pre-Procurement Conference 1 C.D. not required for projects costing P5.0 M and below IRR Sect. 20.2
2 Advertisement / Posting max. 7 C.D. once in one (1) newspaper and posted continuously for 7 c.d. (for projects above 5 Million only) IRR Sect. 21.2.1a~c
- (not required for projects costing P5.0 M and below) IRR Sect. 21.2.2
3 Submission of LOI no deadline On or before the deadline specified in the bidding documents (interim 3 to 5 cd before bidding) IRR Sect. 23.4.3
4 Issuance of Plans/Bid Documents. no deadline Until the dealine for the submission and receipt of bids. IRR Sect. 17.3.a
5 Request for clarification on any part of the bidding documents 10 C.D. at least 10 c.d. before the deadline set for the submission & receipt of bids. IRR Sect. 22.5.1
6 BAC response to the request for clarification 7 C.D. at least 7 c.d. before the deadline set for the submission & receipt of bids. IRR Sect. 22.5.1
7 Site Inspection - Not mandatory, Bidder's Responsibility Clause 6 of PBDs
8 Pre - Bid Conference 1 C.D. for contracts with an ABC of 1 M or more. (12 c.d. before submission & receipt of bids) IRR Sect. 22.1~22.2
9 Minutes of the Pre-Bid. 3 C.D. shall be issued not later than 3 c.d. after the pre-bid conference. IRR Sect. 22.4
10 Issuance of Supplemental/Bid Bulletin ( Addendum/Notices) max 7 C.D. at least 7 c.d. before submission & receipt of bids IRR Sect. 22.5.2
11 Submission/Opening of Bids. 1 C.D. from last day of posting of ITB up to the submission of bid IRR Sect. 25.4.b
ABC of Fifty (50) Million and below ---------------- 50 c.d. max. ------ (13 c.d min….based on earliest 28 cd period)
ABC Above Fifty (50) Million ----------------------- 65 c.d max.
12 Failed (Non-Complying) Bidder, Request for Reconsideration 3 C.D 3 c.d. upon receipt of notice or if present at the time of bid opening, upon verbal notification IRR Sect. 55.1
13 Evaluation on the Request for Reconsideration 7 C.D. within 7 c.d. from receipt therof IRR Sect. 55.1
14 Completion of Bid Evaluation 7 C.D. not more that 7 c.d. from the date of opening of bids (Projects Above 50 Million) IRR Sect. 32.4
5 C.D. not more than 5 c.d from the date of opening of bids (Fifty [50] Million and below) IRR Sect. 32.4
15 Submission of documentary requirements 3 C.D. Tax Clearance, Income Tax Returns, Philgeps Registration, other Licenses required by law. IRR Sect. 34.2
16 Postqualification & Recommendation of Award 7 C.D. within 7 c.d from determination of Lowest Calculated Bid IRR Sect. 34.8
(in exceptional cases may be extended but not to exceed 30 CD)
17 Approval of Resolution of Award / Issuance of Notice of Award max. 7 C.D. 7 c.d. from receipt of the recommendation from the BAC (with an ABC of above Php 50.0 M) IRR Sect. 37.1.2
4.C.D. ( 4 c.d. with an ABC of P50.M and below).
18 Posting of Notice of award 3 C.D. within 3 C.D. from its issuance of award, Philgeps, Website and conspicuous place. IRR Sect. 37.1.6
19 Preparation/Signing of Contract 10 C.D. enter into contract within 10 c.d. from receipt of notice of award IRR Sect. 37.2.1~.2
20 Approval/Disapproval of Contract max. 15 C.D. upon receipt of complete contract documents ( 5 C.D. with an ABC of P50.0M and below) IRR Sect. 37.3
21 Contract Submission to NEDA (Project P500.0 M & above) 7 C.D. within 7 c.d. upon approval of contract E.O.423 S. 2005
22 Contract submission of NEDA to NEDA Board 30 C.D. within 30 c.d from its receipt of the Government Contract. E.O.423 S. 2005
23 NEDA's notification of the action of NEDA Board 7 C.D. within 7 c.d. from thje date of the NEDA Board's action E.O.423 S. 2005
24 Issuance of Notice to Proceed 3 C.D. from the date of approval of the contract by the appropriate gov't. authority IRR Sect. 37.4.1
2 C.D. ( for contracts with an ABC of P50.0 Million and below) IRR Sect. 37.4.1
25 Effectivity Date max. 7 C.D effectivity shall be not later than 7 c.d from issuance of NTP IRR Sect. 37.4.1
26 Posting of NTP and approved contract 15 C.D. post within 15 c.d. in the PhilGeps and website. IRR Sect. 37.4.2
63