Professional Documents
Culture Documents
Spectrum Analyzer
Earlier we were using Spectrum Analyzer for Partial Discharge Measurement. It provide only Graphical
Data. If we want to analyze PD particular compartment, we have to go at that location with spectrum
analyzer and this is very time consuming & tiring process.
PD Monitoring System
All above typical signal Patterns (Graphical patterns) provided us in a library to analyze the type of fault.
Free Metallic Particle
Corona
3. Storage Capacity was very small, so we need to store data frequently (after 15 days).
Win CC Based System:
1. Operating System is Windows based.
6. In Win CC based system Local Operator Station and Control Room Operator Station were on
9. Data Storage is very simple just Copy and Paste and you can analyze easily.
We also upgrade master clock because of Malfunctioning and synchronized with all PLC and
Feeder Protection Relay for getting real time data. We are also using Win CC up grade version in
system, Before we were using Winn CC V5.0 and now using Win CC V7.0
Up gradation of Mimic board to Video wall
Mimic board was a old system and its parts (like: 7 segment display) was out of market. Parts are available
only order basis and all are costly .so there was need to upgrade this system.
Mimic Board:
It was LED based (7 segment display) board which gives only Electrical Over view and few signals.
Video Wall (LVS)
It is projector based video screens and combination of six screens.
1. We can monitor not only individual all pages but also six screen at a time.
2. We can also control all the six pages at a time.
3. There is many different pages contains all three units, electrical and mechanical parameters on a single screen.
LT System Overhauling
FRD Mechanism pin (attached with Nylon roller) was found broken, so Y-Phase of that breaker was not closing and it was
a long time for frequent operation of LT breakers so it was necessity to check the Main contacts, Arcing contact and
Mechanism of all LT System.
ACB CRADLE:
1. Freeness
2. Cleaning
3. Greasing
4. Limit Switch Status
During Overhauling above points of LT System are checked and some parts
of LT breakers are Under consideration:
1.
Gap adjustment between arching contacts.
2. Condition of Arching Contacts Fixed and Moving.
3. All 3 Pole assembly.
4. Fixing damaged and missing hardware.
Overhauling of GIS
1. All the leakages from the pilot blocks and other points such as ermeto couplings of the pump, unions ,
pipes, of HP and LP systems, have been attended by using new unions, "O" rings and pipes.
2. Leaking interconnecting low pressure copper pipes between hydraulic cabinets were also changed
filter for hydraulic oil has been changed with the spares supplied.
3. All operational and commissioning checks of all breakers were found to be satisfactory and are well
with the criteria limits.
PHASES
A B C
DURATION 52.7 53.4 50.4
CLOSING
SYNCHRONISM 3
DURATION 17.6 17.5 17.9
OPEN (Trip 01)
SYNCHRONISM 0.4
DURATION 17.2 17.3 17.4
OPEN (Trip 01)
SYNCHRONISM 0.2
1. Inspection of SF6 gas leakage from feeder-1 GIB- R phase (G6 compartment) was checked and
the tightness of the bolts of the joints was checked for its requisite torque valves.
2. The ram of breaker of B-phase of unit-1 was changed with the new RAM. Its performance is
under observation, the above RAM has been changed to check the fitting and performance of
new RAM which has been supplied as spare
3. 400 liters of Hydraulic oil was used for replacing the existing oil from the hydraulic mechanism
of the breakers.
Following works were carried out on units and feeder breakers for attending the oil
oozing observed by the site personal and reported:
2. The oozing ermeto coupling of pilot block was further tightened by 1/4 to 1/2 turn.
3. After attending the oozing nominal pressure was maintained and checked for the
leakages.
4. 05 operations of each breakers were carried out in order to check for the further
leakage.
5. No oozing has been observed.