Expressway
Vaibhav-FP17014
Madhusudhan-FP17009
It was a NHAI project
The objective of the project was to convert the 4 lane highway to 6/8 lanes
This was the first BOT project in India with a negative grant
In 1998,a traffic study predicted 145000 PCU’s per day
Special purpose vehicle
The project was awarded to the consortium of Jaypee industries ltd and DS
construction ltd.
61.06 crore upfront as negative grant to the NHAI
A SPV called DELHI-GURGAON SUPER CONNECTIVITY LTD was created
SPV entered into a Fixed time-fixed price contract with DS construction ltd
Financing Information HUDCO
200
SBM
30
Debt PNB
Total cost 383.3 30
547.5 Equity SREI
164.2 25
J&K
15
Process analysis
• The plan was initiated in late 1990’s
Inception • A detailed project report was prepared in 1998