IOCL_JASIDIH OIL TERMINAL
PROJECT PROPOSAL:
POL Depot is engaged primarily in receipt, storage and filling of tank trucks for
distribution of petroleum products in the region.
IOCL wants to propose the expansion of MS (1x10592 KL), HSD (1x9025 KL),
SKO (1x2100 KL) and 4nos. TLF bays within existing oil terminal at Jasidih,
District-Deoghar, Jharkhand. Petroleum product will be received through
existing Haldia-Barauni pipeline of IOCL.
IOCL obtained consent to establish from Jharkhand SPCB, Ranchi vide Ref. no.
B-5614, dated 31.10.2013 and CTO vide Ref. no.B-2222, dated 01.07.2014.
3
IOCL_JASIDIH OIL TERMINAL
The proposal was appraised in the 16th expert Appraisal Committee (Industry-2)
Meeting Held during 26-27th October - 2016
4
IOCL_JASIDIH OIL TERMINAL
5
IOCL_JASIDIH OIL TERMINAL
6
IOCL_JASIDIH OIL TERMINAL
7
IOCL_JASIDIH OIL TERMINAL
GOOGLE IMAGE
8
IOCL_JASIDIH OIL TERMINAL
9
IOCL_JASIDIH OIL TERMINAL
1. Executive summary of the project
S.No. Particular Details
1 Name of Project Proposed Expansion of Jasidih Terminal of IOCL
2 Project Location Jasidih Industrial Area, District-Deoghar, Jharkhand
Latitude 24o30’35.64”N
Longitude 86o38’15.54”E
3 Products to be Handled Motor Spirit (MS), High Speed Diesel (HSD) & SKO (Superior
Kerosene Oil)& Ethanol
4 Source of Product Haldia-Barauni pipeline
5 Mode of Receipt Through Pipeline
6 Land 27 Acres
7 Project Cost Rs. 22.03 Crores
8 Layout & Fire Fighting As per OISD-116 & OISD-117 and VRS system
9 Time Schedule 18 Months (Approx.)
10 Manpower Requirement 25 (Approx.)
11 Site elevation above MSL 260m
12 Topography Plain
13 Present Land Use Industrial
14 Nearest Highway NH-333, ~1.7 km (NE direction)
15 Nearest Railway Station Jasidih Railway Station, ~3.5 km (NE direction)
16 Nearest Airport Birsa Munda Airport, Ranchi, ~188 km (SW direction)
17 Nearest Railway Station Jasidih Railway Station, ~3.5 km (NE direction)
10
IOCL_JASIDIH OIL TERMINAL
11
IOCL_JASIDIH OIL TERMINAL
Proposed: Installation of
a.1 No. Internal Floating Roof Tank of 10592 KL for Storage of MS.
b.1 No. Cone Roof Tank of 9025 KL for Storage of HSD.
c. 1 No.Cone Roof Tank of 2100 KL for Storage of SKO.
d. 4nos. TLF bottom loading bays
• The petroleum products like MS, HSD & SKO will be received through existing
12" Haldia-Barauni pipeline passing adjacent Jasidih Terminal of IOCL at
Jasidih, District-Deoghar, Jharkhand.
• The existing terminal is having storage Capacity of 32120 KL. After expansion
Capacity will be increased to 53837 KL.
• Different sets of pumps and inlet/outlet pipelines from the storage tanks have
been provided for different products.
• Three dedicated pipelines for the three products MS, HSD & SKO have been
provided.
12
IOCL_JASIDIH OIL TERMINAL
13
IOCL_JASIDIH OIL TERMINAL
LAYOUT PLAN
14
IOCL_JASIDIH OIL TERMINAL
15
IOCL_JASIDIH OIL TERMINAL
Portable fire extinguishers will be installed on pump stations, tank farms and buildings.
Mobile fire fighting trolleys with foam monitors, hoses, etc. also will be provided.
Fixed fire fighting monitors will be located at the pump station and truck loading gantries.
Tanks will be equipped with fixed cooling water and foam pourer.
The records will be analyzed on daily basis by the concerned officer and faults will be rectified on
immediate basis.
The fire water pumps are activated automatically. When the fire-water header pressure is low, the
jockey pump maintains the pressure automatically. The foam is sucked through Venturi system
All routine exercises shall be carried out on the basis of standard SOP as a part of preventive
measures to eliminate leakage and accidents. Preventive maintenance of equipment shall be carried out
as per OISD guidelines
16
IOCL_JASIDIH OIL TERMINAL
VRS (Vapor Recovery System) installed for controlling leakage of vapors
17
IOCL_JASIDIH OIL TERMINAL
The vapour coming from TLF bays which is rich in hydrocarbons, passes into the
absorber column where the bulk of the hydrocarbon is absorbed in a counter flow of
gasoline. The small amount of air present, particularly during the purge stage, passes
out of the top of the absorber column and results in a small carry over of
hydrocarbons, which is sent to carbon bed, which is in adsorption mode.
• B-51 & B-52 are two adsorber vessels (Adsorption on B-52 and desorption on B-51)
• B-31 Absorber Column
18
IOCL_JASIDIH OIL TERMINAL
2. Vessel connection Can cause fire damaging all the tanks if the fire is not tackled
Failure / Catastrophic immediately. Explosion can occur due to failure of MS tank nozzle
Failure of Storage failure/MS tank catastrophic failure.
Tank.
3. Gasket Failure in Can cause pool fire/jet fire and explosion, damaging adjoining
Pump Discharge Line. pipelines, tanks and other properties.
4. Hole in Pump Can cause pool fire/jet fire and explosion, damaging adjoining
Discharge lines. pipelines, tanks and other properties.
5. Failure of loading Can cause fire/explosion damaging the trucks, pipelines and entire
Arm. loading bay.
6. Mechanical seal Can cause fire damaging the pipelines and other pumps.
failure of pumps.
7. Ethanol pump Can cause pool fire/jet fire, damaging adjoining pipelines and
discharge line FB other properties.
failure.
19
IOCL_JASIDIH OIL TERMINAL
The tanks farm area has been provided with dykes of adequate capacity as per OISD norms,
to contain any leakage or accidental release due to failure of equipments. An oil water
separator has been provided for treatment of oily waste water generated during operation
of the Terminal.
The fire fighting network has been designed based on OISD 118 (Layout for petroleum
installation). The capacity of various Fire Fighting equipments has been designed based on
the guidelines stipulated under OISD 117
20
IOCL_JASIDIH OIL TERMINAL
Fire Fighting Facilities available at Jasidih Terminal