The document discusses problems with drum loading at a new Sulphurex plant, including risks of drum shifting, acid leakage, and safety hazards. It proposes installing an off-spec transfer line and pump from the old plant to reduce time, risks, and costs associated with drum shifting and loading at the new plant. Calculations estimate the labor, risks, and costs of different drum loading methods with installing a pump being the most efficient solution.
The document discusses problems with drum loading at a new Sulphurex plant, including risks of drum shifting, acid leakage, and safety hazards. It proposes installing an off-spec transfer line and pump from the old plant to reduce time, risks, and costs associated with drum shifting and loading at the new plant. Calculations estimate the labor, risks, and costs of different drum loading methods with installing a pump being the most efficient solution.
The document discusses problems with drum loading at a new Sulphurex plant, including risks of drum shifting, acid leakage, and safety hazards. It proposes installing an off-spec transfer line and pump from the old plant to reduce time, risks, and costs associated with drum shifting and loading at the new plant. Calculations estimate the labor, risks, and costs of different drum loading methods with installing a pump being the most efficient solution.
Sulphurex plant. • Risk of drum shifting and acid leakage. • Risk of personnel safety and acid attack. • Wastage of time and money in drum shifting and loading. • Damaging of plant floor and working area. THE SOLUTION • An Off-spec transfer line from the old plant unloading area. • Drums unload at old plant area. • A sufficient pump transfer the acid towards the off spec tank of new plant. • The time, risk and cost will be reduce. CALCULATION • Drum shifting to new plant floor. • Time required : 0.5 hrs. • Labor required 02 Labor 01 Operator • Risk : Acid leakage wastage. Personnel accident. • Cost of shifting : 31,387 rs/yr. CALCULATION • Pump shifting and installation. • Time required : 10 min. • Labor required 01 Labor 01 electrician 01 fitter • Risk : Electro-mechanical hazard. Asset damage. Material wastage. • Cost of shifting : 31,387 rs/yr. CALCULATION • Drum unloading in Cubitainer. • Time required : 35 min. @ 04 drums. • Labor required 01 labor Operator • Risk : Personnel accident. Material wastage. • Cost of shifting : 31,387 rs/yr. • Pumping power : 315 kwh/yr. REQUIRMENTS • Material • Labor
Maxims and Instructions for the Boiler Room: Useful to Engineers, Firemen & Mechanics; Relating to Steam Generators, Pumps, Appliances, Steam Heating, Practical Plumbing, etc