You are on page 1of 20

MANUFACTURING OF

STAINLESS STEEL KITCHEN


SINKS

Manufacturing process project


Presenter Saleha Mushtaq
CONTENTS

 Introduction
 Demand
 Raw materials
 Sink Design
 Process
 Finance
INTRODUCTION

 Kitchen Sink making


 What are sinks?
DEMAND

 Houses
 Restaurants
 Offices
RAW MATERIALS

 Stainless steel sheets


 Food Grade
 Dimensions 24x12 18 gauge
SINK DESIGN

 Dimensions 16x18x8 inches


 Hole = 1.5 inches
 Mass = 3.5 kg
PROCESS

DEEP
SHEAR BLANKIN TRIMMIN
DRAWIN
CUTTING G G
G
SHEARING

 Sheet metal cutting process


SHEARING

 Sheet Metal Shearing and Cutting Machine


 Model name QC12Y-4X3200
 Power = 5.5 kW
DEEP DRAWING

 Sheet metal forming process


DEEP DRAWING

 Stainless steel sinks making machines Hydraulic Press


 Model name Y32-200T
 Power = 7.5kW
BLANKING

 Cutting of the sheet metal


BLANKING

 Sink hole cutting machine


 Sink hole
 Model SHC-580-22R
 Power = 2.02 kW
TRIMMING

 Sides are trimmed


 Cutting machine
FINANCE

 Initial Cost
 Earning
 Breakeven point
INITIAL COST

 Machine cost
 Raw material cost
 Salaries
 Electricity Bills
INITIAL COST
Formula for calculating Electricity bills

Bill = Power(Kw) * (No of working hours) * (No of working days in a month)


NAME PRICE (PKR)
Sheet Metal Shearing and Cutting 12,80,180
Machine
Sink hole cutting machine 62,7175
Stainless steel sinks making machines 12,52,350
Hydraulic Press
Stainless steel sheets 35,0000*4=14 lac
Salary of 4 technicians 15000*4=60000
Salary of Maintenance Engineer 40,000
Salary of Sweeper 10000
Electricity bill of machines 33,795
EARNINGS

 Cost spend on 1 sink= 1500


 Price of one sink = 1752 approx 1750 Rs
 4 tons produces 1141 sinks
 Total price is 1752*1141= 2000000
 New raw material = 1400000
 Remaining=6 lac
 Profit per month = (6*6)lac= 36lac
BREAKEVEN POINT

 Earning per month = 3600000


 Breakeven point is almost 1.3 months
THANK YOU

You might also like