COMPARISON ON THE

PAST, PRESENT, AND


FUTURE MODE OF
TRANSPORTATION
NAIA
PAST: It was dubbed as
the worst airport in the
world
PRESENT: It was
awarded as the most
improved airport in the
world with new glass
aero bridge and two
rapid exit taxiways
FUTURE: NAIA Terminal 2
is currently undergoing
renovations and the
target completion date
is March 2020
CLARK
INTERNATION
AL AIRPORT
PAST: It used to be an
overlooked and
underdeveloped airport
PRESENT: More flights are
offered with 2.5 million
flights making the highest in
2018. it is now one of the
busiest airports in the
country with 524 domestic
flights and 222 weekly
international flights.
FUTURE: Airport terminals
expansion
TRAIN SYSTEMS
PAST: Major pain for commuters, lack of coaches,
repeated breakdowns and passenger overflow
PRESENT: MRT unloading incident and service interruption
are reduced . PNR have now extended train services
from Caloocan to Makati.
FUTURE: The Department of Transportation is seeking to
complete more than 320 kilometers of railway projects by
2022— more than four times the current footprint—in
Luzon and Mindanao
LAND
TRANSPORTATION
PAST: Philippines was dubbed as Republikang
Walang Plaka. No driver’s license and only
paper seals were distributed
PRESENT: LTO manufactures its own display
with 1.7 million plates distributed nationwide,
10 million license printed with 5 year validity
and 32 security features were installed
against counterfeit.
FUTURE: Completion of NLEX-SLEX Connector
Road, SLEX Toll Road 4
WATERWAYS
PAST: Philippines Coastguard is
decades behind in resources and
equipment
PRESENT: Fast patrol boats,
multiple responses vessels, rigid
hull inflatable boat, 560 out of 600
operational houses
FUTURE: Add 20 more lighthouses
LIST OF THE PROPOSED PROJECTS
OF DUTERTE ADMINISTRATION FINISHED
THIS YEAR OR IN THE COMING YEAR
CAVITEX C5 LINK FLYOVER
BORACAY MAIN
ROAD
REHABILITATION
LAGUNA LAKE HIGHWAY
TARLAC-
PANGASINAN-
LA UNION
EXPRESSWAY
PANGUIL BAY
BRIDGE IN
MINDANAO
The Panguil Bay Bridge,
which will connect the City of
Tangub in Misamis
Occidental and Municipality
of Tubod in Lanao del Norte,
is targeted to be completed
in 2020. It is one of the major
projects of the Department
of Public Works and
Highways under the
government's Build Build Build
program
NAIA EXPRESSWAY
PHASE 2
PARANAQUE
INTEGRATED
TERMINAL
EXCHANGE
LRT-MRT
COMMON
STATION
BICOL INTERNATIONAL AIRPORT