You are on page 1of 38

SELIA SELENGGARA SELATAN SDN. BHD.

Taklimat

COLD IN PLACE RECYCLE (CIPR)


FT 005, Seksyen 86 Jalan Johor Bahru - Melaka

Tarikh 14 Jun, 2013 Tempat Hotel Equatorial, Cameron Highland


Mukasurat 1
1. Pengenalan Projek 4
2. Program Mesyuarat & Lawatan Tapak 5-6
3. Senarai Semak Kerja CIPR 7
4. Mesyuarat Pembukaan 8
5. Trial Pit 9
6. Ujian Ke Atas Existing Pavement Material 10
7. Ujian 1 – Sieve Analysis 11
8. Ujian 2 – Plasticity Index 12
9. Ujian 3 – Aggregate Crushing Value (ACV) 13
10. Ujian 4 – Flakiness Index 14
11. Ujian 5 – California Bearing Ratio (CBR) 15
12. Ujian 6 – Unconfined Compression Strength (UCS) 16
13. Ujian 7 – Indirect Tensile Strength (ITS) 17
14. Ringkasan Keputusan Ujian 18

Mukasurat 2
(sambungan)

15. Ujian Ke Atas Trial Section 19


16. Ujian 1 – In-Situ Moisture Content 20
17. Ujian 2 – Unconfined Compression Strength (UCS) 21
18. Ujian 3 – Indirect Tensile Strength (ITS) 22
19. Ujian 4 – Rolling Pattern 23
20. Ujian 5 – Compacted Thickness 24
21. Ujian 6 – Field Compaction 25
22. Ringkasan Keputusan Ujian 26
23. Mesyuarat Penutupan 27
24. Iktibar (Lesson Learn) 28 - 36
25. Soal Jawab 37

Mukasurat 3
Mukasurat 4
MESYUARAT & LAWATAN TAPAK

TARIKH MASA AGENDA TEMPAT

5 April 2.00 – 4.00  Pendaftaran. JKR Daerah Batu Pahat


2013 petang  Ucapan pengerusi majlis. FT 005 Jalan Batu Pahat – Rengit,
(Jumaat) 4.00 – 5.00  Program kerja (CPM). Seksyen 86.00 – 90.00
petang  Progress kerja.
 Pengenalan CIPR.
 Kaedah Perlaksanaan Kerja.
 Mesin dan Peralatan yang digunakan.
 Bahan dan Spesifikasi.
 Lawatan untuk Penyiasatan Tapak (Trial Pit)

8 April 8.00 pagi – Ujian makmal ke atas existing pavement Universiti Tun Hussein Onn Malaysia
2013 5.00 petang material. (UTHM)
(Isnin) I)Sieve analysis
II)Plasticity index
III)Aggregate crushing value (ACV)
IV)Flakiness index
V)California Bearing Ratio (CBR)
VI)Unconfined Compression Test (UCS)
VII)Indirect Tensile Test (ITS)

9 April 8.00 pagi – Lawatan Tapak untuk kerja-kerja Trial Lay FT 005 Jalan Batu Pahat – Rengit,
2013 5.00 petang CIPR. Seksyen 86.00 – 90.00
(Selasa) Ujian di tapak ke atas trial section.
I)In-situ moisture content
II)Rolling pattern
III)Field compaction (density)

Mukasurat 5
MESYUARAT & LAWATAN TAPAK

TARIKH MASA AGENDA TEMPAT

10 April 8.00 pagi – Lawatan tapak untuk pengambilan sampel FT 005 Jalan Batu Pahat – Rengit,
2013 12.00 (coring) ke atas Trial Lay yang telah dijalankan. Seksyen 86.00 – 90.00
(Rabu) tengahari I)Compacted thickness Universiti Tun Hussein Onn Malaysia
2.00 – 5.00 Ujian makmal ke atas trial section. (UTHM)
petang I)UCS
II)ITS

11 April 8.00 pagi – Lawatan tapak untuk kerja-kerja CIPR. FT 005 Jalan Batu Pahat – Rengit,
2013 5.00 petang Mengadakan ujian semasa pembinaan di tapak. Seksyen 86.00 – 90.00
(Khamis) I)Moisture content
II)Field compaction (density)

12 April 8.00 pagi – Lawatan tapak untuk pengambilan sampel FT 005 Jalan Batu Pahat – Rengit,
2013 10.00 pagi (coring) ke atas kerja-kerja CIPR yang telah Seksyen 86.00 – 90.00
(Jumaat) 10.00 –12.00 dijalankan. Universiti Tun Hussein Onn Malaysia
tengahari I)Compacted thickness (UTHM)
3.00 – 5.00 Ujian makmal ke atas kerja di tapak. JKR Daerah Batu Pahat
petang I)UCS
II)ITS
Penutupan majlis & bersurai.

Mukasurat 6
KERJA CIPR

Mukasurat 7
PEMBUKAAN

1 Tujuan mesyuarat & lawatan

Taklimat Projek oleh Pengurus Kawasan,


2 Ayer Hitam meliputi perkara di bawah:
• Maklumat Projek & Senarai Kerja
• Program Kerja
• Kaedah Kerja
• Pelan Pemeriksaan & Pengujian
• Mesin & Peralatan
• Pengurusan Trafik

3 Perancangan Kerja

4 Senarai Semak Kerja CIPR

5 Isu-isu berkaitan

6 Lain-lain

Mukasurat 8
Mukasurat 9
EXISTING PAVEMENT

Mukasurat 10
SIEVE ANALYSIS

Mukasurat 11
PLASTICITY INDEX

Mukasurat 12
AGGREGATE CRUSHING VALUE

Mukasurat 13
FLAKINESS INDEX

Mukasurat 14
CALIFORNIA BEARING RATIO (CBR)

Mukasurat 15
UNCONFINED COMPRESSION STRENGTH (UCS)

SAMPEL SIMEN (%) KEPUTUSAN (MPa) SPESIFIKASI (Mpa)

1 2 0.82

2 4 1.76 2-5

3 6 2.88

3.5

UCS (MPa)
2.5

1.5

0.5

0
2% 4% 5% 6%

Kandungan Simen

Mukasurat 16
INDIRECT TENSILE STRENGTH (ITS)

SAMPEL SIMEN (%) KEPUTUSAN (MPa) SPESIFIKASI (MPa)

1 2 0.12

2 4 0.35 > 0.2

3 6 0.58

0.45
0.4
0.35

ITS (MPa)
0.3
0.25
0.2
0.15
0.1
0.05
0
2% 4% 5% 6%

Kandungan Simen

Mukasurat 17
UJIAN KE ATAS
EXISTING PAVEMENT

KEPUTUSAN
NO. UJIAN UNIT SPESIFIKASI
1 2 3

1 SIEVE ANALYSIS Rujuk Slaid

2 PLASTICITY INDEX % 3.5 3.5 - < 6%

3 AGGREGATE CRUSHING VALUE % 23.08 23.11 < 25

4 FLAKINESS INDEX % 14.38 14.98 < 25

5 CALIFORNIA BEARING RATIO % 39.00 39.00 > 80

6 UNCONFINED COMPRESSION STRENGTH MPa 0.83 (2%) 2.25 (4%) 3.45 (6%) 2-5

7 INDIRECT TENSILE STRENGTH MPa 0.12 (2%) 0.35 (4%) 0.58 (6%) > 0.2

Mukasurat 18
TRIAL SECTION

Mukasurat 19
IN-SITU MOISTURE CONTENT

Mukasurat 20
UNCONFINED COMPRESSION STRENGTH (UCS)

SAMPEL
UJIAN
1 2 3 4

UCS (7 Hari) 8.1 1.72 5.88 5.73

PURATA 5.36

Mukasurat 21
INDIRECT TENSILE STRENGTH (ITS)

SAMPEL
UJIAN
1 2 3 4

ICS (7 Hari) 0.68 0.24 0.67 0.23

PURATA 0.46

Mukasurat 22
CORAK GELEKAN (ROLLING PATTERN)

Mukasurat 23
COMPACTED THICKNESS

Mukasurat 24
FIELD COMPACTION

Mukasurat 25
UJIAN KE ATAS
TRIAL SECTION

KEPUTUSAN
NO. UJIAN UNIT SPESIFIKASI
1 2 3 4

1 IN-SITU MOISTURE CONTENT % 8.5 5.9 - - + 20% OMC

2 UNCONFINED COMPRESSION STRENGTH MPa 8.1 1.72 5.88 5.73 2-5

3 INDIRECT TENSILE STRENGTH MPa 0.68 0.24 0.67 0.23 > 0.2

4 ROLLING PATTERN Passes 2, 2 -

5 COMPACTED THICKNESS mm 254 mm 251 mm 253 mm 250 mm

6 FIELD COMPACTION % 107 99 98 > 97%

Mukasurat 26
PENUTUPAN

1 Tujuan mesyuarat & lawatan

2 Iktibar dari lawatan (lesson learn)

Mukasurat 27
(# 1 – PEGAWAI KESELAMATAN & KESIHATAN)

Melibatkan Pegawai Keselamatan &


1 Kesihatan dari mula projek hingga akhir.

Memeriksa kawasan tapak bina sekurang-


2 kurangnya seminggu sekali.

Melakukan audit keselamatan bagi


3 memastikan tahap keselamatan dan
kesihatan di tapak bina terjamin.

4 Bertindak sebagai penguatkuasa di tapak.

Mukasurat 28
(# 2 – PENYELARASAN DENGAN SYARIKAT UTILITI)

Mengadakan Mesyuarat
Teknikal bersama
dengan Syarikat Utiliti
bagi menyelesaikan
sebarang masalah
berbangkit.

Mukasurat 29
(# 3 – PERANCANGAN & PELAKSANAAN KERJA)

1 Tentukan ukuran kelebaran terlebih dahulu.

2 Potong pavemen dari tepi ke tepi.

3 Potong pavemen secara bertindih (overlap).

Mukasurat 30
(# 4 – PENGURUSAN TRAFIK)

Penutupan jalan kepada


pengguna jalan raya
hendaklah dalam masa
yang munasabah.

Mukasurat 31
(# 5 – PEMERIKSAAN & UJIAN KUALITI)

Melakukan
pemeriksaan dan ujian
kualiti di pelbagai
lokasi tapak bina.

Mukasurat 32
(# 6 – CURING SELEPAS PEMADATAN)

Sembur tack coat sejurus


selepas pemadatan sebagai
perlindungan kepada
permukaan CIPR sebelum boleh
dibuka kepada pengguna jalan
raya.

Mukasurat 33
(# 7 – PAIP PENYAMBUNGAN ROSAK)

Paip dari lori


tangki air ke
mesin CIPR gagal
disambung
dengan kemas
disebabkan oleh
rubber washer
dan clip yang
tidak ketat.

Mukasurat 34
(# 8 – PAIP PENYAMBUNGAN TERSUMBAT)

Paip dari lori


tangki air ke
mesin CIPR
tersumbat
disebabkan
pengambilan
sumber air yang
bercampur
dengan lumut.

Mukasurat 35
(# 9 – KAEDAH KERJA SEMASA TRIAL PIT)
Penggalian
1 menggunakan
back hoe sukar.

Potong pavemen
2 gunakan mesin
pemotong,
pecahkan
pavemen gunakan
breaker.

Diikuti oleh back


3 hoe.

Mukasurat 36
Mukasurat 37
Untuk

Dengan Tulus Ikhlas

Daripada

Mukasurat 38

You might also like