8 April 8.00 pagi – Ujian makmal ke atas existing pavement Universiti Tun Hussein Onn Malaysia
2013 5.00 petang material. (UTHM)
(Isnin) I)Sieve analysis
II)Plasticity index
III)Aggregate crushing value (ACV)
IV)Flakiness index
V)California Bearing Ratio (CBR)
VI)Unconfined Compression Test (UCS)
VII)Indirect Tensile Test (ITS)
9 April 8.00 pagi – Lawatan Tapak untuk kerja-kerja Trial Lay FT 005 Jalan Batu Pahat – Rengit,
2013 5.00 petang CIPR. Seksyen 86.00 – 90.00
(Selasa) Ujian di tapak ke atas trial section.
I)In-situ moisture content
II)Rolling pattern
III)Field compaction (density)
Mukasurat 5
MESYUARAT & LAWATAN TAPAK
10 April 8.00 pagi – Lawatan tapak untuk pengambilan sampel FT 005 Jalan Batu Pahat – Rengit,
2013 12.00 (coring) ke atas Trial Lay yang telah dijalankan. Seksyen 86.00 – 90.00
(Rabu) tengahari I)Compacted thickness Universiti Tun Hussein Onn Malaysia
2.00 – 5.00 Ujian makmal ke atas trial section. (UTHM)
petang I)UCS
II)ITS
11 April 8.00 pagi – Lawatan tapak untuk kerja-kerja CIPR. FT 005 Jalan Batu Pahat – Rengit,
2013 5.00 petang Mengadakan ujian semasa pembinaan di tapak. Seksyen 86.00 – 90.00
(Khamis) I)Moisture content
II)Field compaction (density)
12 April 8.00 pagi – Lawatan tapak untuk pengambilan sampel FT 005 Jalan Batu Pahat – Rengit,
2013 10.00 pagi (coring) ke atas kerja-kerja CIPR yang telah Seksyen 86.00 – 90.00
(Jumaat) 10.00 –12.00 dijalankan. Universiti Tun Hussein Onn Malaysia
tengahari I)Compacted thickness (UTHM)
3.00 – 5.00 Ujian makmal ke atas kerja di tapak. JKR Daerah Batu Pahat
petang I)UCS
II)ITS
Penutupan majlis & bersurai.
Mukasurat 6
KERJA CIPR
Mukasurat 7
PEMBUKAAN
3 Perancangan Kerja
5 Isu-isu berkaitan
6 Lain-lain
Mukasurat 8
Mukasurat 9
EXISTING PAVEMENT
Mukasurat 10
SIEVE ANALYSIS
Mukasurat 11
PLASTICITY INDEX
Mukasurat 12
AGGREGATE CRUSHING VALUE
Mukasurat 13
FLAKINESS INDEX
Mukasurat 14
CALIFORNIA BEARING RATIO (CBR)
Mukasurat 15
UNCONFINED COMPRESSION STRENGTH (UCS)
1 2 0.82
2 4 1.76 2-5
3 6 2.88
3.5
UCS (MPa)
2.5
1.5
0.5
0
2% 4% 5% 6%
Kandungan Simen
Mukasurat 16
INDIRECT TENSILE STRENGTH (ITS)
1 2 0.12
3 6 0.58
0.45
0.4
0.35
ITS (MPa)
0.3
0.25
0.2
0.15
0.1
0.05
0
2% 4% 5% 6%
Kandungan Simen
Mukasurat 17
UJIAN KE ATAS
EXISTING PAVEMENT
KEPUTUSAN
NO. UJIAN UNIT SPESIFIKASI
1 2 3
6 UNCONFINED COMPRESSION STRENGTH MPa 0.83 (2%) 2.25 (4%) 3.45 (6%) 2-5
7 INDIRECT TENSILE STRENGTH MPa 0.12 (2%) 0.35 (4%) 0.58 (6%) > 0.2
Mukasurat 18
TRIAL SECTION
Mukasurat 19
IN-SITU MOISTURE CONTENT
Mukasurat 20
UNCONFINED COMPRESSION STRENGTH (UCS)
SAMPEL
UJIAN
1 2 3 4
PURATA 5.36
Mukasurat 21
INDIRECT TENSILE STRENGTH (ITS)
SAMPEL
UJIAN
1 2 3 4
PURATA 0.46
Mukasurat 22
CORAK GELEKAN (ROLLING PATTERN)
Mukasurat 23
COMPACTED THICKNESS
Mukasurat 24
FIELD COMPACTION
Mukasurat 25
UJIAN KE ATAS
TRIAL SECTION
KEPUTUSAN
NO. UJIAN UNIT SPESIFIKASI
1 2 3 4
3 INDIRECT TENSILE STRENGTH MPa 0.68 0.24 0.67 0.23 > 0.2
Mukasurat 26
PENUTUPAN
Mukasurat 27
(# 1 – PEGAWAI KESELAMATAN & KESIHATAN)
Mukasurat 28
(# 2 – PENYELARASAN DENGAN SYARIKAT UTILITI)
Mengadakan Mesyuarat
Teknikal bersama
dengan Syarikat Utiliti
bagi menyelesaikan
sebarang masalah
berbangkit.
Mukasurat 29
(# 3 – PERANCANGAN & PELAKSANAAN KERJA)
Mukasurat 30
(# 4 – PENGURUSAN TRAFIK)
Mukasurat 31
(# 5 – PEMERIKSAAN & UJIAN KUALITI)
Melakukan
pemeriksaan dan ujian
kualiti di pelbagai
lokasi tapak bina.
Mukasurat 32
(# 6 – CURING SELEPAS PEMADATAN)
Mukasurat 33
(# 7 – PAIP PENYAMBUNGAN ROSAK)
Mukasurat 34
(# 8 – PAIP PENYAMBUNGAN TERSUMBAT)
Mukasurat 35
(# 9 – KAEDAH KERJA SEMASA TRIAL PIT)
Penggalian
1 menggunakan
back hoe sukar.
Potong pavemen
2 gunakan mesin
pemotong,
pecahkan
pavemen gunakan
breaker.
Mukasurat 36
Mukasurat 37
Untuk
Daripada
Mukasurat 38