Professional Documents
Culture Documents
ATTP Overview
ATTP Overview
ECC
2
ATTP Introduction
Bricks in a coherent serialisation
solution
4
Bricks in a coherent serialisation solution
- and how to connect them
5
SAP Advanced Track & Trace for Pharmaceuticals
Functionality
CMOs
PI/PO
ECC ATTP /
CMOs
CMOs
CMOs
3PL
3PLs
3PLs
3PLs
PI/PO
Site
LineManager
manager
Line
Linemanager
manager
8
ATTP Process Flow
Regulatory Government
6b 2
ECC AIF Monitoring,
Errors, alerts 8b
WM
functionality
ATTP
WM functionality Regulatory Reporting Import function 3PL support
6 Receive from
production functionality functionality
6a Receive
Event
(verify)
Reporting Reporting
Product
Master
S/N 8c
Scrap to TUR to CHN Import
Import Inbound Notification
Decommission
Repack Central Application functionality
Commission 3PL
7 Pick & Pack SSCCs Data Retrieval Audit Trail
Security, Authorization 3PL Shipping
& Roles
Process order
4 release 3 5
1 Master
Data
Site Manager/CMO
Training
11
DM Suggested strategy
12
DM Integration of Master Data (1-4)
13
Master data in SAP ECC
14
Co-existence of serialized and non-
serialized products
• Handled by master data setup in ECC
• Each material will be either:
• Non serialized
• Serialized
• Serialized and Traced
• Lot Managed
• =>Materials are managed for the flow they
must follow
15
Material master in ECC
16
Batch Master – new serialisation fields
17
Customer / Vendor master in ECC
18
Plants in ECC
1 Create PO
2 Outbound Delivery =
2 Release PO
initially integrated
3 SSCC/SGTIN = Created
(Commissioned)
5 Move SU to
final location
1 Create SO
4 Confirm pick TO
5 Outbound Delivery
via scanner = closed/finished
Designed by NNIT
INTERNAL USE
ECC/ATTP Scanner programs
- example solutions – Designed by NNIT
• Post GR in ECC
• Post receiving event in ATTP
Load and GI by scanner
- example solution – Designed by NNIT
• Validate HU in ECC
• Status and delivery
• Post GI in ECC
Initiate & ● Extensive and detailed to reduce risks and define best
Two Step
Define realization plan
Approach ● With experienced external partner (NNIT on time &
material) and internal resources
Note: Dates for realization are best case. will be assessed as part of initiation & define phase
35
Template Version:
2017-1
Initiation and Define Phase work
streams
Project baseline
Warehouse
Analyze ATTP Analyze
Define WM Detailed
required Define Define impact of Review of
processes with Define
updates based required business Brazil and US concept, design and
non-SAP verification specifications
on the current events and transaction warehouse not approach and
systems where points and (FDS and
flow between triggers per which will having SU or high-level
update to ATTP content TDS)
the 4 ERP ERP system update ATTP HU Design
is required
systems management
Questions
37
Back up slides
38
3
9
Welcome