Update to Softbank

1
Developed engineering capabilities to address all SOB requirements

• 100+ engineering team • Repair & maintenance


with specialization in ticketing build within the
HVAC, automation, HMS (hotel management
building management system) to manage day to
system etc. Technical Management day operation
• 300+ vendors ranging Capabilities Infrastructure • 35000+ tickets are
from global companies seamlessly handled in a
such Hitachi, Daiken, Otis, month by the skilled team
Schindler, etc., to local across SOB business
companies ready to • Present across all 23
provide services at m ore hubs catering to demand
effect manner Complete of all the verticals within
• Development of in- Process the OYO ecosystem (SOB
house IOT devices to Ownership – Hotels, Life , Homes)
cater to in-house demand and now supporting Cloud
for efficiently resolving Kitchen and SOK for next
daily maintenance issues level of growth
and to reduce energy • Pre-live audit inspection, TR handover
consumptions • Support OPS to reduce room blockage
• Preventive & breakdown maintenance
• Cost and UH % reduction
• Process improvement 2
Energy saving initiatives has lead to xx% reduction per SRN cost

Installation of • Installation of energy efficient cooling system in OTH such as VRV, DC


efficient invertor air conditioners, heat pumps for water heating
appliances • Selection of efficient lighting systems using state of the art technology and
natural lighting while designing interiors to reduce energy consumption

• Installed IOT devises in high energy consumption devises to carryout real


Use of IOT devices
time monitoring to take corrective action
and application
• Integration of room power supply with online hotel management system to
control wastage of energy

Introduction to • Use of solar heater for water heating to reduce power consumption
renewal energy • Installation of roof top solar panels to generate power from natural resources
source

3
Fire safety & emergency preparedness training done across SOB properties

Scope of work Current status Next steps

Parameters to be covered Training conducted across Training content Time line


• Fire safety training  • 18 hubs • To be further enriched with • Jun
• MOCK drill  • 22 cities emergency preparedness and
• Natural Disaster  • 55 sessions natural disaster
• Emergency  • ~ 1450 staff
• by 9 trainers Coverage
Business coverage • Increase the coverage across 23 • Jul
• SOB Hotels  Content development hubs to be included in Fire &
• SOB Life  • Mr. A K Sharma, ex fire chief Safety training
• SOB Homes  of Delhi created the content • Cover ~ 6500 staff

Duration Trainers • Jul


• 3 – 4 hours  • Increase the number of trainers to
25+ covering all major cities

4
Honeywell addressable system is under installation in all SOB properties
Mar Apr May Jun Jul Status update
Activity 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

~ 330 sites by TR • 500 + sites are under


PO & Adv. Material 180 nos addressable Dispatch of all 500 + implementation
3/23/2019 dispatched system to be dispatched addressable system to
to 435 sites by Honeywell existing sites

Material • Material dispatch done across 435


Mobilization 4/5/2019 5/5/2019 6/15/2019 sites till date
Complete 120 Complete ~ 240 Complete ~
sites sites 180 pending
sites
Cable & conduit • 155 sites completed as on date,
installation planning to complete 300 sites by
4/30/2019 5/30/2019 6/30/2019
end of the month
Complete Complete Complete
120 sites 120 sites 120 sites
Addressable • 1000+ addressable panels to made
System 5/5/2019 6/5/2019 7/7/2019 ready by June end for OYO
Installation

Technical 50+ engineering team members will be trained • Technical training of OYO
training engineering team to be done at site
and Honeywell factory

Operational All operation team HMs/ GRE will be trained • Operation training to be done at site
training by Honeywell installation team