Replacing HW Units
Replacing HW Units
An alarm marked with two asterisks does not threaten the operation of
the system. However, if the fault occurs during working hours, it must
** be corrected at once. If the fault occurs outside working hours, it can
be corrected the next day
Alarms marked with three asterisks require immediate action from the
user. An alarm like this is set when the system has become faulty to
*** the extent that some essential functionality of the system has
stopped, or is in danger of stopping. The maintenance personnel must
take immediate action
(Alarm Monitor)
(NED)
7 © Nokia Siemens Networks RN23823EN30GLA1
mcBSC Alarm Administration
Alarm Reference
Alarm number
and text
Full description
Additional
information
Instruction in
handling the alarm
Cancelling
information
8 © Nokia Siemens Networks RN23823EN30GLA1
mcBSC Alarm Handling
Alarm System Administration Menu
mcBSC MCBSC32 2013-05-10 22:23:52
Replacing HW Units
Multicontroller BSC
MCMU OMU
TRXSIG,
OMUSIG
BCXU
SIGTRAN Aif
MSS
ETPSIG
FlexiEDGE/ AoIP
ETMA
mrBTS PCUSIG MGW
ETPSIG
P-Abis (PS+CS)
EEP
Gb
ETME PCUM
PEP SGSN
OMU interfaces
– O&M over IP
▪ The O&M interface (Q3 interface) is the interface between NetAct and the mcBSC
▪ The implementation of this interface is based on the O&M framework of the ITU-T and the
International Standards Organization (ISO)
▪ Physical interface used is Ethernet
COMMAND EXECUTED
COMMAND EXECUTED
2. Transcoder located in core network (BSS is sending coded frames, for example GSM
codecs like AMR, over A interface using IP stack)
ETMA-1
IFETH0 UP 1500 PIDM (10.0.1.81/24)
LIC (10.0.1.101/24)
IFETH1 UP 1500
VLAN23 UP 1500 L (10.0.3.21/25) ETMA,1 working
EEP AoIP userplane: vlan xx46
->IFETH0 23 0/0
VLAN3246 UP 1500 L (10.2.32.69/27)
->IFETH1 3246 0/0
COMMAND EXECUTED
COMMAND EXECUTED
BSSAP BSSAP
SCCP SCCP
M3UA M3UA
SIGTRAN
SCTP SCTP
IP IP
Ethernet Ethernet
BSU 0 BCXU 0
IP BCXU 1
BSU 1
BSU 2 BCXU 2
SCTP Associations
COMMAND EXECUTED
BSU 0 BCXU 0
BSU 1 IP BCXU 1
BSU 2 BCXU 2
SCTP Associations
25 © Nokia Siemens Networks RN23823EN30GLA1
mcBSC Interfaces
SIGTRAN – Signaling for the A interface
• Interrogating Association sets: ZOYI
mcBSC MCBSC32 2013-05-16 01:30:35
NETWORK: NA1
SIGNALLING ROUTES
SP CODE H/D NAME STATE IN ROUTE SET STATE INFO
================== ================ ===== ========================== ==========
0350/00848 BSC32 OWN SIGNALLING POINT AS SIGNALLING END POINT Signaling Route Set
0DB6/03510 MSSK AV 0DB6/03510 AV-EX
NET SP CODE H/D LINK SET STATE SIGNALLING LINKS IN LINK SET
=== ================== =================== ===== =============================
NA1 0DB6/03510 16 MSSK AV 0 Signaling Link Set
LINK TEST NOT ALLOWED
SIGNALLING LINKS
COMMAND EXECUTED
BSC
SGSN2
NSVLI 52103 NSEI 52103
NSEI 52103 NRI:73 Rip:10.16.153.144 RPNBR
71 52103 PGI:1
LPNBR 52103 68
BSC21 RPNBR 49999 65
Rip:10.16.153.145 RPNBR
52103
PRE:Y (Dynamic) 64
Rip:10.16.144.75
PSEI:00
Gb Interface 1
PCUM 5
PCUM 6 Mutlpoint Gb
PCU pooling
NSVLI 52104
NSEI 52104 Gb Interface 2
LPNBR 52104
RPNBR 49999 NRI:47 SGSN60
PRE:Y (Dynamic)
Rip:10.16.144.76
PAPU 15
NSEI 52104
Rip:10.16.153.144 RPNBR
52104
Rip:10.16.153.145 RPNBR
52104
COMMAND EXECUTED
Modify Parameter
Influence Yes
on involved Network Modify involved NE (eg. MSS,BTS)
Elements
No
Unlock Network Object (BTS, TRX)
End
ZEQ...
BTS 1 BTS 2
BSC
TRX 1 TRX 3
ZEE...
TRX 2 TRX 4
ZER...
BCF 1
RFHA Y
Replacing HW Units
BCF number
Continues Mode
Command to display
BCF state phase
Replacing HW Units
TOTAL OF 5 UNITS
COMMAND EXECUTED
READING DATA FROM DATABASE ...
COMMAND EXECUTED
PCUM-1
IFETH0 UP 1500 PDM (10.0.20.13/24)
IFETH1 UP 1500
VLAN24 UP 1500 L (10.0.24.2/24)
Spare
PEP PCUM IP’s
->IFETH0 24 0/0
VLAN449 UP 1500
->IFETH1 449 0/0
mcPCUSIG
Modified IUA
UDP
IP
Ethernet L2
Ethernet L1
COMMAND EXECUTED
1. User creates gateway BCXU unit and PCUM unit with ZWTU MML command
2. User configures IP addresses for gateway BCXU and PCUM with ZQRN MML
command
3. User configures messaging interface configuration with ZD2C MML
• Example: ZD2C:P:BCXU,1::PCUM,0;
4. PCUM’s DHCP client sends DHCP discovery to DHCP server
5. PCUM’s DMX post office establishes DMX messaging connection to the gateway
BCXU
COMMAND EXECUTED
1. User connects hosting signaling BCXU and PCUM with ZD3C MML
▪ Example: ZD3C:PCUM,0:BCXU,1:;
▪ Command is given only to those BCXU/PCUMs, which will be moved to WO-EX
state
2. Platform creates automatically a logical PCU index for PCUM.
3. Platform changes state of connected BCXU and PCUM from SP to WO
4. Platform sends a notification to application about hosting signaling BCXU-PCUM
association creation
GW
BCXU#2
WO-EX
BCXU#0 PCUM#0
WO-EX WO-EX->SP-EX - Hosting signaling BCXU does not change
- Physical PCUM associated to hosting signaling
BCXU changes
-Old and New WO-EX PCUM has own GW BCXUs
BCXU#1 PCUM#1
WO-EX SP-EX->WO-EX
• PCU Pool may contain mixture of PCU2-E and PCUM (RG30 EP1 combined
configuration)
Replacing HW Units
PCUM-SP
MCMU
PCUM
PCUM
PCUM
PCUM
PCUM
BCXU
BCXU
ETMA
BCXU
BCXU
ETMA
ETME
ETME
OMU
m b b p p p e a b b p p p p e a
s s s s s s s s w w w w w w w w
HDD-spBSAC-sp
Module 2 Module 3b
MCMU-SP
PCUM-SP
PCUM-SP
PCUM-SP
BCXU-SP
BCXU-SP
ETMA-SP
ETME-SP
PCUM
PCUM
PCUM
PCUM
BCXU
BCXU
ETMA
ETME
• If any of the modules fail there is sufficient number of PS unit capacity on
remaining modules
– Max amount: MCMU: 1, BCXU: 2, PCUM: 4, ETME: 1, ETMA: 1*
▪ *) ETMA has no real SP unit but additional WO capacity for 1 unit
– Excluding OMU as in BSC3i/ FlexiBSC
PCUM-SP
MCMU
PCUM
PCUM
PCUM
PCUM
BCXU
BCXU
ETMA
BCXU
BCXU
ETMA
ETME
ETME
ETME
OMU
m b b p p p e a b b p p p p p a
s s s s s s s s w w w w w w w w
HDD-spBSAC-sp
Module 2 Module 3b
MCMU-SP
PCUM-SP
PCUM-SP
PCUM-SP
BCXU-SP
BCXU-SP
ETMA-SP
ETME-SP
PCUM
PCUM
PCUM
PCUM
PCUM
BCXU
BCXU
ETMA
• The number of units is the same as on previous example
• If module 3a fails, there is no suffcient SP ETME capacity
• If module 3b fails, there is no sufficient SP PCUM capacity
• Alarms on insufficient redundancy
Replacing HW Units
MML:Remove traffic from all the units MML: Take all units into SP-EX state
in the specific mcbc module Monitor using OMU service terminal:
All units> SP-EX state> SE-NH RCBUGGGX
Remove the specific mcbc module Place the mcbc module back to the
from the cabinet cabinet (reconnect power, grounding,
Remove bolts and all needed cables in higig & interface cables)
the rear&front
6. If you are not installing another AMC immediately, install an AMC filler into the empty AMC
bay: to ensure adequate cooling and a proper EMC shield in the module
d) If you are not installing another AMC immediately, install an AMC filler into the empty AMC
bay > This is to ensure adequate cooling and a proper EMC shield in the module
EXECUTION STARTED
PARAMETER CLASS: 2 SYSTEM_FUNCT_CONFIGUR
IDENTIFIER NAME OF PARAMETER VALUE CHANGE POSSIBILITY
02070 AUTOMATIC_UPDATE 00FF YES
COMMAND EXECUTED
ALARM HISTORY
COMMAND EXECUTED
ALARM HISTORY
Removing a AC PSU from the BCN module Removing a DC PSU from the BCN module
AC PSU DC PSU
Replacing HW Units
ZWTB:MCBC,3:BCN_A,0:SYNC,1:;
• The front panel synchronization ports of mcBSC module are labeled as SYNC 1
and SYNC 2 in the front panel but referred as SYNC 0 and SYNC 1 on ZWT
command group and as EXT 1 and EXT 2 on ZDY command group