Professional Documents
Culture Documents
11 November 2019
Guideline| REDSITE
Background:
Red Site is high capacity(PRB) & User each site have class & different target Need Cluster PIC Total Site
AMBON Efrizal 2
to reduce PRB <90% & User <185 JAYAPURA Sri 6
MANOKWARI Panji 13
MASOHI Efrizal 6
Red Site W42: 58 Site Total MERAUKE Eko 4
NABIRE Saddam 17
SENTANI Zufri 2
SORONG Panji 5
How to Remark: TIMIKA Rainhard 1
TUAL ARU Efrizal 2
Standalone – Non Optimize Grand Total 58
High Payload – Non Optimize
Colo & Surounding High Capacity – Non Optimize
Radio Part - Optimize
2. SDR/ERAB Drop
if due to uu quality is coverage issue can modify selQrxLevMin or Rs Power
If due to timeout/radiolink fail can modify Prach power, Rrc Setup timer, ue fail timer
3. CQI need to check overshooting from compare TA & ISD Sectoral, if overshoot need to reduce RS or downtilt
RET if have