You are on page 1of 50

Project : Water Transmission System From Sohar to Al Dhahirah

Governorate

Client Project Project Add Text


Start Milestone Finish Milestone
01 Public Authority for Water (PAW),
Oman
29th July, 2018 12th February, 2021
Get a modern
PowerPoint
Presentation

Consultant Project Design Project Design Add Text


Start Milestone Finish Milestone
02 AAW & Partners LLC
Consulting Engineers
28th August, 2018 12th December,2019
Get a modern
PowerPoint
Presentation

Contractor Construction Construction Add Text


Start Milestone Finish Milestone
03 Egyptian Contracting Company &
Partners LLC
29th July, 2018 12th November,2020
Get a modern
PowerPoint
Presentation
Ground Rules
Ground Rules
 Respect everyone’s contribution
 There are no right or wrong answers
 Everyone’s opinion is of value
 Give everyone a chance to speak
 One conversation at a time and no talking over each other
 Be open and honest
 Do not discuss what someone has said with others outside the room
 Everyone should feel free to ask questions of each other – it’s an open-playing field
Project Scope (Project Layout)
Project Schematic
MPS2 MPS1 Sohar IR IWPP
C 4,230 C 4,230 C 158,800 C 155,175
Dhahirah IR Q 3,182 x 2duty Q 3,621 x 2duty Q 3,622 x 2duty Q 3,573 x 4duty
C 50,940 H 313.4 H 261 H 141.5 H 150.4
 
  AL-4 AL-3 AL-2 AL-1
L 24.0 L 16.9 L 14.3 L 18.9
D 1200 D 1200 D 1200 D 1600
       
AL-5A
L 86.8
D 1200
 
AL-6 Reservoir
L 14.01 Pump Station
Dhank Dhank
D 400 Pressurized Pipeline
Junction C 20,800
  Gravity Pipeline
 
C = Capacity (m3)
AL-5B
L 55.78 Q = Flow Rate (m3/h)for each pump
D 1200 H = Pump Head (m)
D  800 Ibri Low
C 31,400 L = Length (km)
D 1000 D = Diameter (mm)

D 800 Ibri High-1


C 45,130
Safety Signs
Comparative Statement
AS OF: 28-NOVEMBER-2019 AS OF: 04-DECEMBER-2019
DESCRIPTION Planned Actual Planned Actual % of Variance Highlights &
% % % % (+/-) Remarks
Mobilization 100.00% 99.63% 100.00% 99.63% -0.37%
Maintenance 54.75% 54.45% 55.66% 55.66% 0.00%
Submittals 100.00% 99.75% 100.00% 99.75% -0.25%
Actual = 65.85%
Detail Design 74.09% 52.99% 87.61% 55.18% -32.43% (MMC)
Procurement 14.03% 11.90% 16.48% 11.90% -4.58%
Construction 11.17% 7.21% 12.01% 8.02% -3.99%
OVERALL PROGRESS 15.97% 12.47% 17.55% 13.01% -4.54%
Detail Design
Awaiting response / approvals from Engineer
1 Electromagnetic Flow Meter ( vide Letter No., 1133, dated 14 Nov. )
2 LV switchgear MAS (vide Letter No., 1073, dated 23 Nov. )
3 Third party inspection agency for noriva check valve (vide No., 1190, dated 26 Nov.)
4 Increase in capacity of service pump at Sohar IR ( vide Letter No., 1155, dated 18 Nov.)
5 GA drawing ITP/FAT procedure for nozzle check valve ( vide Letter No., 1160, dated 20 Nov.)
6 CRS for LCP (local control panel ) drawing for drain pump ( vide Letter No., 1161, dated 20 Nov. )
7 Pipe thickness calculation for MPS1, MPS2 and Sohar IR ( vide Letter No., 1009-1010-1011, dated 9 Oct.)
8 Finish colour code for pumping station equipment ( vide Letter No., 998, dated 3 Oct.)
9 Heat load calculation HVAC system for Sohar IR CRS ( vide Letter No., 1122, dated 7 Nov.)
10 Heat load calculation HVAC system for Sohar IWPP ( vide Letter No., 1110, dated 3 Nov.)
11 Heat load calculation HVAC system for MPS1 ( vide Letter No. 1159, dated 18 Nov.)
12 Heat load calculation HVAC system for MPS2 ( vide Letter No. 1148, dated 14 Nov. )
Detail Design
13 Function specification for PLC/SCADA system ( vide Letter No. 1127, dated 14 Nov.)
14 Calculation for coupler dismantling joint ( MAS No. 53) ( vide Letter No. 1149, dated 14 Nov.)
15 Cable sizing 11 kv calculation ( vide Letter No., 1187, dated 26 Nov.)
16 Cathode protection system ( Dated 24 Nov.)
17 CRS for Schneider Electric for PLC System (MAS 25-Rev.01) (vide Letter No. 1233, dated 2nd Dec. 19)
18 Schneider Electric for SCADA System (MAS No.30-Rev.01) (vide Letter No. 1232, dated 5th Dec. 19)
19 CRS for Control Panels (MAS No.32-Rev.01)
20 CRS for SIEMENS for Network Accessories (MAS No.31-Rev.01) (vide Letter No. 1230, dated 5th Dec. 19)
21 CRS for Leak Detection System (MAS No.41)
22 CRS for Instrument Index, Rev.C04
23 Specification for Telecom System (Rev. C02)
24 Auxiliary Transformer (MAS No.69-Rev.01) (vide Letter No. 1210, dated 3rd Dec. 19)
25 Instruments (MAS No.85)
Detail Design (S-Curve)
ROW Work Progress (Physical)
ROW Work Progress as on 4th Dec 2019
Completed
Total % of
Alignment No. Length
Length (m) Complete
(m)
Alignment 01 18,953 5,050 26.6%
Alignment 02 14,356 14,321 99.8%
Alignment 03 16,890 14,270 84.5%
Alignment 04 24,000 4,050 16.9%
Alignment 05A 86,764 64,920 74.8%
Alignment 05B 50,852 22,550 44.3%
Trench Excavation Work Progress
(Physical)
Trench Excavation Work Progress as on 4th Dec 2019
Completed
Total % of
Alignment No. Length
Length (m) Complete
(m)
Alignment 01 18,953 1,418 7.48%
Alignment 02 14,356 9,518 66.30%
Alignment 03 16,890 10,400 61.57%
Alignment 04 24,020 - 0.00%
Alignment 05A 86,764 36,266 41.80%
Alignment 05B 50,852 1,570 3.09%
ROW Works (Physical)
Trench Excavation Works
(Physical)
ROW Alignment Wise
Trench Excavation Alignment
Wise
ROW Works (S-Curve)
Trench Excavation (S-Curve)
Bedding Works (S-Curve)
Welding Works (S-Curve)
NDT, External Coating & Internal Painting Works
(S-Curve)
Site Levelling, Clearing &
Grading
Excavation for Ring Beam
Excavation for Pump House
Building
Sohar IR & IWPP Pump Station
Works
Sohar IR Pump Station Works
Qnty
Activity Name Total Quantity % Completed
Completed
Blinding Concrete (m2) 1,200 1,200 100%
Base Shuttering (m2) 181.76 163.49 90%
Base Reinforcement (Ton) 174 130.50 75%
Excavation for Boundary Wall (lm) 801.00 650 81%
Blinding Concrete for Boundary Wall Footings (lm) 801.00 625 78%
Sohar IWPP Pump Station Works
Total Quantity Completed % Completed
Piling Works (No.'s) 265 185 70%
Sohar IWPP (S-Curve)
Sohar IR (S-Curve)
MPS-01 (S-Curve)
MPS-02 (S-Curve)
Dhahirah IR (S- Curve)
Dhank (S-Curve)
Ibri Low Level (S-Curve)
Ibri High Level-01 (S-Curve)
Transmission Pipeline S-Curve
Structure Works S-Curve
Project S-Curve
Jindal SAW Limited
Jindal SAW Limited
CS Pipe Ist Shipment Delivery Status (Store-03) Total Km's
Total Number of CS Pipes in Ist Shipment 1764 21.632
Total Number of CS Pipes Inspected & MIR done 1764 21.632
CS Pipe 2nd Shipment Delivery Status Total Km's
Total Number of CS Pipes in 2nd Shipment 1397 17.037
Total Number of CS Pipes Inspected & MIR done 1397 17.037
CS Pipe Delivery Schedule
Ist 2nd 3rd 4th 5th
(CS Pipe) Shipment Details Total
04-Oct-19 04-Nov-19 06-Dec-19 10-Mar-20 13-Apr-20
Plan (Km) 21 20 20 20 26.405 107.405
Jindal SAW Ltd.
Actual (Km) 21.632 17.037 0 0 0 38.669
From 8-Nov-19 to 15-April-20
Lot 1 Lot 2
Timeline 10-Dec-19 31-Dec-19 Timeline 214.405
MAN Industries Ltd. (1000-1200) (1000-1200)
CS Pipes CS Pipes
Plan (Km) 10 22 25 25 25 107
Actual (Km) 0 0 0 0 0
Pump Delivery Schedule
Omanisation
OMANISATION
S.No. Job Category Profile No. Each Total No.'s Omanisation %
Civil 6
1 Engineers Mechanical 4 12
Electrical 2
2 HSE Engineer = 1 1
3 HR/PRO = 6 6
4 Reception Officer = 1 1

35%
5 Admin/Clerk = 4 4
6 Electric Technician = 3 3
7 Security Guard = 43 43
8 Driver = 37 37
9 Traffic Controller = 1 1
10 HSE Labour = 1 1
11 Financial/Technical Officer = 2 2
12 Occupational Safety and Health Port = 2 2
Total 113 113
MAS Details
MAS and Sub-Contractor Submission Details
RECOMMENDED UNDER REVIEW
SL DESCRIPTION SUBMITTED REJECTED
BY AAW JV AAW PAW

1 Civil 16 ___ ___ 7 9 ___

Mechanical &
2 11 ___ ___ 4 7 ___
Electrical

3 SCADA 3 ___ ___ 1 2 ___

4 Sub-Contractor 14 ___ ___ 10 4 ___

Method of
5 5 ___ ___ 1 4 ___
statement
MAS Summary for Civil
Under Review
Recommended
S.N Description MAS No. Name of Company SUBMITTED Rejected
By AAW JV AAW PAW

Al Tasnim Cement Products


1 Paving Blocks MAS 28 1 _ _ 1 _ _
LLc

2 MAS 35 Putzwerk 1 _ _ 1 _ _

Plaster Materials

3 MAS 35A Plafix 1 _ _ 1 _ _

4 Raised Floor MAS 40 JIACHEN-China 1 _ _ 1 _ _

Polyethylene
5 MAS 55 Triton Middle East 1 _ _ _ 1 _
Sheet
MAS Summary for Civil
Manhole Cover
6 & Frame 600mm MAS 66 ERKON - Turkey 1 _ _ 1 _ _
Dia 400

7 DI Surface Box MAS 67 ERKON - Turkey 1 _ _ 1 _ _

Aluminium
8 MAS 68 SAGAR ASIA PVT. LTD India 1 _ _ 1 _ _
Ladder

Protection board
9 MAS 70 SAINT-GOBAIN Weber 1 _ _ _ 1 _
& its primer

Polygrout NS
(Non Shrinke
Henkel Polybit Industries
10 Free MAS 83 1 _ _ _ 1 _
Ltd.
Cementitious
Grout)
MAS Summary for Civil
Epoxy Coated
JINDAL SHADEED IRON &
11 Reinforcement MAS 84 1 _ _ _ 1 _
STEEL LLC
Steel bars

12 Security Gates MAS 86 CHAINLINK FENCING Co. 1 _ _ _ 1 _

13 Barbed Wire MAS 87 CHAINLINK FENCING Co. 1 _ _ _ 1 _

14 Steel Posts MAS 88 CHAINLINK FENCING Co. 1 _ _ _ 1 _

15 Security Fence MAS 89 CHAINLINK FENCING Co. 1 _ _ _ 1 _

Anti-Termite Kirish Rasayan ExportsPvt.


16 MAS 90 1 _ _ _ 1 _
treatment Ltd

16 0 0 7 9 0
MAS Summary for Mechanical & Electrical
Recommended Under Review
SL DESCRIPTION MAS No. Name of Company SUBMITTED Rejected
By AAW JV AAW PAW

MAS
1 CLA VAL 1 _ _ _ 1 _
No.11Rev.2
Control Valves
MAS No.11A
2 VAG 1 _ _ _ 1 _
Rev.2

Oman Pumps Mfg. &


Service Water
3 MAS 21(A) Engineering Services 1 _ _ _ 1 _
Pumps
Co. (SAOC)

BIYANI ALLOYS
4 CS Fittings MAS 23 1 _ _ 1 _ _
PVT.LTd

CS Fittings - BIYANI ALLOYS


5 MAS 36 A 1 _ _ 1 _ _
Elbow PVT.LTd

6 MAS 51 ABB 1 _ _ 1 _

Electromagnetic
Flowmeter

7 MAS 51A EMERSON 1 _ 1 _ _


MAS Summary for Mechanical & Electrical
2-Way
40/33mm
Dura-Line Middle
8 Spirally Ribbed MAS 54 1 _ 1 _ _
East LLc
Bundle HDPE
Duct

HDPE Drainage United Gulf Pipe


9 MAS 65 1 _ _ 1 _
Pipe Manufacturing Co. LLc

Welding MULTI TECH LLc


10 MAS 19D 1 _ _ 1 _
Electrodes 7018 (ESAB MIDDLE EAST)

Superkino Equipments
PVT.LTd - CEDASPE -
NUHAS - Legnano
Auxiliary
11 MAS 69 Teknoelectric Company 1 _ _ 1 _
Transformer
Middle East -
Elettromaule
Component - VIDYA
11 0 0 4 7 0
MAS Summary for SCADA
Under Review
Recommended
SL DESCRIPTION MAS No. Name of Company SUBMITTED Rejected
By AAW JV AAW PAW

1 LV Switchgear MAS 45 SIEMENS 1 _ _ _ 1 _

2 UPS System MAS 71 VERTIV Chloride 1 _ _ 1 _ _

Instruments
(Level
Endress Hauser Emirates
Transmitters +
Trading of Control
3 Pressure MAS 85 1 _ _ _ 1 _
Equipment and
Transmitters +
Measurement Device
Flood Level
Switch)

3 0 0 1 2 0
Sub-Contractor Status
Recommended Under Review
SL Description Name of Company Submitted Rejected
By AAW JV AAW PAW

Point B Services
1 1 _ _ 1 _ _
Civil, Mechanical and Engineering Technology
Environmental Works
2 AWS Engineering LLc 1 _ _ 1 _ _
Construction of Concrete Itlal Gaalan Almutakamila
3
Buildings Works
1 _ _ 1 _ _
Construction

Global Chemicals &


4 _ _ 1 _ _
Maintenance Systems L.L.C
Civil works. 2
Rawabi Dhofar United Trad
5 _ _ 1 _ _
& Cont

6 Civil and Mechanical Works System Technology LLc 1 _ _ 1 _ _

Muscat for Protection


7 Mechanical Works 1 _ _ 1 _ _
Solutions M.P.S.
Sub-Contractor Status
8 Civil works. Al Bustan Constructions 1 _ _ 1 _ _

Steel Structure & Welding Hamed & Naser Al


9
Works
1 _ _ 1 _ _
Khadouri Cont.Co.(Asso.)

10 Gulf Testing solution. LLC Testing Works 1 _ _ 1 _ _

Design & Execution of


Keller Ground Engineering. Foundation and Soil
11
LLC
1 _ _ _ 1 _
Improvement Works (Stone
Columns)
Al Khuwair Engineering & Welding and Thrust Boring
12
Investment Company
1 _ _ _ 1 _
works
Foundation Engineering,
Marine Works, Ground
13 NSCC International LLc 1 _ _ _ 1 _
Improvement Works (Stone
Columns)
SPC Sohar Precast Company
14
LLC.
Precast Concrete 1 _ _ _ 1 _

14 0 0 10 4 0
Method Statement Status
Recommended Under Review
SL Method Statement SUBMITTED Revision Rejected
By AAW JV AAW PAW
Method Statement for Material
1 Handling, Storage & 1 1 _ _ _ 1 _
Preservation.

2 Procedure for Consumables 1 1 _ _ _ 1 _


Handling & Storage.

Method Statement for Steel


3 Structure Fabrication and 1 0 _ _ 1 _ _
Erection

Method Statement & ITP for


4 1 1 _ _ _ 1 _
General Concrete Operations -

Method Statement for FOC


5 Installation, Jointing, 1 0 _ _ _ 1 _
Termination and Testing
5 0 1 4 0
Thank you
Message 01
Please consider the environment before printing this presentation.

Message 02
“Logic will get you from A to B. Imagination will take you everywhere.”
– Albert Einstein
Clie
nt:
Pu
blic
Au
tho
rity
for
Wa
Con ter
sul
tan
t :A
Con AW
tra
ct or:
ECC
P/J
oi n
tV
ent
ure
SC:
M MC
PAW
PAW
SC: AAW
Me
tito
ECCP/JV
MMC
METITO