1 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
``
`
2 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
Contents
``
`
3 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
1.1 To ensure that construction and installation of precast pits, gullies and manholes including
transportation for services networks will be carried out in accordance with the project
specification and quality requirements and to ensure the necessary measures will be taken to
achieve the project HSE requirements.
1.2 This Method Statement covers all the steps involved in construction and installation of precast
pits, gullies, manholes including transportation for use in storm water, fire water and electrical
networks and defines the guideline to carry out the same.
1.4 This method statement describes the responsibilities, procedure, inspections and/or tests to
be carried out, associated with the works.
2- References:-
``
`
4 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
3- Definitions:-
The Construction Engineer shall be available at site full time for the execution of works as per schedule
and specification.
Ensure that MS/RA trained to site supervisors upon approval and prior to work executions, in additional to
periodic training for the MS/RA.
Ensure reporting of any new hazard/ incidents/ unplanned event to EHS team to review of the MS/RA.
Ensure that all workforces are fully aware about the emergency response and evacuation procedure.
Ensure full compliance with EHS recommendations during ejection of the activity.
4.5 Foreman:
The Foreman is responsible to carry out the work as per the Method Statement, Specification and
Approved Drawings.
The Foreman shall be available at site full time for the execution of works.
Ensure that workforce is trained about the MS/RA.
Ensure that welfare facilities are well maintained and housekeeping is proper during work execution.
Ensure that daily task briefing is conducted prior to work commencement.
Ensure that head counting is in place after break hours.
4.6 Surveyor:
The Surveyor shall ensure that all the survey related works carried out as per the approved drawings.
``
`
6 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
The Surveyor shall ensure that setting out and level carried out with Total station and Auto level.
For all survey related works he shall be available at site full time.
5.1 The Safety engineer/officer is responsible for check the site safety and health precautions are
effectively completed prior to start the activity on site.
5.2 The Safety engineer/officer responsible to carry out safety induction for the workers.
5.3 The Safety engineer/officer responsible to conduct safety tool box meeting prior start activity on site in
daily basis.
5.4 The Safety engineer/officer responsible to inspect and monitor the site work activities and ensure the
workers wear PPE equipment (such as gloves, safety belt, helmet and safety shoes) and prepare safety
report.
5.5 The Safety engineer/officer has the responsibility to assess any process has particular safety risk and
addressed as required.
5.6 The Safety engineer/officer has the responsibility to ensure that working during night time has
adequate lighting and adequate space and good ventilation.
``
`
7 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
5.7 The Safety engineer/officer has the responsibility to ensure that working at height shall be safe and
make all precautions to avoid falling from height.
5.8 The Safety engineer/officer has the responsibility to ensure the site openings are provided with
barricade, tape and safety nets.
6- General Requirements:-
Materials
Ready Mix concrete (35/45 & C8/10 for blinding)
Uncoated Reinforcement steel
Cover & Frame as per ER and approved material submittal (load rating F900)
Galvanized steel angles and plates with anchors
Polythene Sheet
Non-shrink Grout
Water stops as per approved material submittal
Water
7- Equipment:-
``
`
8 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
8- Methodology:-
8.1 General
Obtain necessary work permits prior to starting the activity.
Ensure the working conditions of all equipments have been verified by authorized personnel.
Ensure that HSE induction to work force is provided prior to commence the job.
Ensure that provision of safe access is available prior to commence the job.
Ensure all material required for concrete curing is available on site with sufficient quantity. Use potable
water for concrete curing works
Ensure the arrangement for testing of fresh concrete has been made; all accessories and testing apparatus
including cube moulds are available at concrete check point.
Ensure the work force is properly trained to use the reinforcement cutting & bending machine.
Ensure the formwork to be used have smooth surface in order to achieve a good concrete finish.
Prefabricate the steel for base slab including wall starter bars and tied properly as per approved shop
drawings
Formwork shall be fixed in perfect alignment, true shape and size of the structure as per approved shop
drawing
The prefabricated steel should be placed inside the erected formwork
Concrete spacer 75mm shall be fixed to face exposed to soil and 50mm face exposed to weather or as
marked on the approved drawing
Approved water stopper shall be placed as required in drawing
Inspection request shall be submitted to consultant to verify the completion of reinforcement & formwork
as per approved drawing for approval, as per site agreement, the inspection checklist for the site activity
inspection can be followed as per Engineer approval.
After Engineer’s approval, approved concrete C35/45 shall be ordered from approved source
``
`
9 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
Concrete mix design, slump, temperature to be checked and sample for concrete cube to be collected as
per project specification. Every 50m³ concrete 6 cubes shall be prepared. Concrete temperature shall not
exceed 30ºC at the time of placing. Slump shall be checked as per approved mixed design & trial mix.
Concrete shall be poured in layer’s not more than 50cm & concrete shall not drop above 1 meter height.
Concrete shall be completed as quickly and efficiently as possible
Concrete shall be deposited as nearly as practicable in its final position to avoid segregation due to re-
handing or flowing.
Placing shall be performed at a rate, so that the previous concrete placed is still in a plastic stage, when
integrated with fresh concrete.
Immediately after concrete placing, needle vibrator (1” or 2”) shall be used for concrete compaction.
Compaction will not be less than 8 sec. at a time and poker c/c distance shall be approximately 30cm or as
per site trial
After completion of concrete wooden/aluminum float finishing shall be carried out.
After initial set has taken place wet hessian cloth shall be placed over the concrete surface.
Vertical surfaces can be stripped after 24 hours and shall be wrapped with wet hessian & polythene sheet.
Hessian cloth shall be kept wet for at least 7 days.
``
`
10 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
The Styrofoam shall be completely removed and concrete surface shall be properly exposed. The fittings
shall be fixed properly as per approved drawings.
The exposed concrete surface shall be applied with bonding agent
The approved grout material shall be mixed as per manufacturer recommendation and poured around the
fittings and finished properly.
8.2.3 Casting of Cover Slab
Prefabricate the steel reinforcement for precast cover slab and tie properly as per approved shop
drawings
Formwork shall be fixed in perfect alignment, true shape and size as per approved shop drawings
The prefabricated steel shall be placed inside the formwork. Place required concrete spacers at bottom
and all sides of slab.
All embedded item and accessories and galvanized steel agles, DI Frame and lifting hooks shall be installed
and tied properly as per approved shop drawing.
If the accessories not available, Styrofoam shall be placed in the required shape for fixing the accessories
in the later stage.
Inspection request shall be raised to verify the completion of reinforcement, formwork & embedded
items as per approved drawing for Engineer’s approval.
Concreting shall be completed after Engineer’s approval as described above.
After completion of curing period & repairing, approved water proofing bituminous coats shall be applied
on the walls & base as per drawing and manufacturer recommendation and as per approved method
statement.
The area left for accessories shall be grouted after receiving the materials.
The Styrofoam shall be completely removed and concrete surface shall be properly exposed. The fittings
and accessories shall be fixed properly as per approved drawings.
The exposed concrete surface shall be applied with bonding agent.
The approved grout material shall be mixed as per manufacturer recommendation and poured around the
accessories and finished properly.
``
`
11 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
An approved concrete class C8/10 grade shall be casted with proper finishing.
The loading & unloading of chambers shall be carried out with the help of crane or forklift or crane
Precast chambers shall be transported from casting yard to placing location by trailers.
Location of pits shall be marked at the top of screed
Pits shall be installed on the marked location using crane. Make sure alignment and level is as per
requirement
9- Program:-
The work plan and time schedule of work will be submit prior to mobilization and commencement of each
activity.
10- QA/QC:-
All material control and above activity shall be controlled as per the approved project quality plan and
procedure.
As a record of joint inspection activity checklist will be provided for inspection and work certification by
contractor representative.
On the basis of activity checklist work inspection request will be submitted later with all supporting
documents.
``
`
12 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
All work places will be cleaned from waste materials and ensuring clean and healthy work environment as
well as maintain free access and egress in the event of emergency. All generated waste shall be shifted to
the centralized waste segregation area.
12- Safety:-
All the above operation shall be executed in according with the occupational health, safety and
environment plan.
Safety procedures are to be considered before, through and after the completion of the work to avoid any
possibility of danger to humans or the construction.
Movement of vehicles should be controlled to avoid any confusion with any other casual traffic.
All the above operations shall be executed strictly in accordance with Project Occupational Health, Safety,
Security and Environmental Plan, once it becomes an approved document.
Prior to the commencement of any activities, the workforce will receive a safety induction on the project
site safety requirements; this safety induction will include Project HSE Policy, project details and layout,
site management team, general site HSE requirements, emergency procedure including emergency
contact numbers, roles and responsibilities of the workers, site discipline, general environmental
awareness, PPE requirements.
The HSE roles and responsibilities shall be delivered to all staff (construction manager, engineer,
supervisor, foremen, and charge hand).
All activities will be performed according to the control measures and instructions prescribed in the
attached Risk Assessment Sheets.
All Vehicles will have valid licenses and passes before entering the site.
PPE shall be issued to all personnel (Mandatory PPE’s: Hard hat, Safety glass, high visibility vest, Safety
shoes and cover all. Task specific PPE; Dust mask, goggles, hand gloves).
Specific training shall be given for task specific tools and equipment’s; records shall be kept in HSE
department.
Heat stress training will be provided during summer time, records shall be kept in HSE department.
Welfare facilities will be provided to all personnel (toilet, rest room, first aid room etc).
Adequate cool drinking water, shade and hydrolyte shall be placed.
Plant and equipment shall have back up alarms, lights and all other applicable safety devices.
Provide Banks man when operating equipment reverse and moving the equipment where pedestrian
movement is exist.
``
`
13 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
Risk assessment could be reviewed anytime followed the instructions of consultant or change in activity or
regulations.
Requirement of the Project Emergency Preparedness and Response plan shall be strictly followed.
In the event of an accident, contact the area HSE Supervisor.
Easy means of access/Rescue the workers will be available at all time.
Contact numbers of all emergency supervisors will be distributed to site personnel (Site engineer, Safety
officer, male nurse and concerned authorities and emergency services).
Injuries will have the highest priority to be directly dealt with at once.
There are different types of situations that we need to consider under this section. These are:
Basic first aid – approved first aider shall check for the required treatment.
Medical – to be taken to the nearest hospital if it’s not cleared from basic first aid.
Property damage – any damage to existing property or utility the respective authority be notified
Fatality – Call ambulance and police immediately
Fire – Call civil defense immediately
``
`
14 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. : Construction &
Installation of
Precast and Cast
ENGINEER : CONTRACTOR : in Situ Pits,
Gullies and
Manholes
15 / 26 Method
Method Statement Statement&of
for Construction Fill Installation
Installation of Precast and Cast in Situ Pits, Gullies and Manholes
``
`
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. :
Construction & Installation of
ENGINEER : CONTRACTOR :
Precast and Cast in Situ Pits, Gullies
and Manholes
RISK ASSESSMENT
Risk
Residual risk Additional
evaluation Accept
Sn Activity Hazard Consequences/ impact Implemented control measures Improvements in
RL RL Y/N?
L S
H/M/L
L S H/M/L
controls
``
`
16 / 26 Method Statement for Construction & Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. :
Construction & Installation of
ENGINEER : CONTRACTOR :
Precast and Cast in Situ Pits, Gullies
and Manholes
persons. equipment’s.
Poor communication Designated areas to be arrange beforehand with
the client/contractors for the special
arrangements for parking and storing.
Equipment should have reverse alarm, front horn
and revolving light in functional condition.
Banks man to be available for guiding equipment
on site.
Site to be cleared of unwanted materials.
Workers will not exceed the load limit.
Heavy or awkward loads should be moved using
handing aid.
Mechanical aid will be taken as per requirement.
Site to be under competent supervision.
Equipment operator shall be certified.
Safe access for pedestrian and equipment should
be made.
Warning signs should be displayed
PPES and coverall should be worn.
First aid facility to be available on site.
``
`
17 / 26 Method Statement for Construction & Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. :
Construction & Installation of
ENGINEER : CONTRACTOR :
Precast and Cast in Situ Pits, Gullies
and Manholes
Brake failure
Mobilization of equipment in good condition is
Abnormal Weather
Transportation
``
`
18 / 26 Method Statement for Construction & Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. :
Construction & Installation of
ENGINEER : CONTRACTOR :
Precast and Cast in Situ Pits, Gullies
and Manholes
Overhead utilities.
``
`
19 / 26 Method Statement for Construction & Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. :
Construction & Installation of
ENGINEER : CONTRACTOR :
Precast and Cast in Situ Pits, Gullies
and Manholes
Absence of
Permits need to take before the activity.
Lift Plan.
Design, Planning & preparation of Heavy Lift
Safe Heavy lifting procedure.
The weight of the load Competent Riggers & operators
is not assessed prior Testing & certification of the lifting equipment
selecting & mobilizing and accessories.
the crane. Inspection & approval of the Heavy lift
arrangements including de-slinging.
The type, capacity & Ensure the Heavy lift erection sequence is well
Number of crane to be designed & plan approved.
used not assessed. Ensure the pre-lift preparation is checked against
The final location, the drawing, physical location, direction is well
Position & marked, and bolts are cleaned in a ready to slip-
preparedness not in position.
checked against the Ensure the positioning of the load, initial position
drawing. of crane, path of movement, final lift positioning,
Fall of the heavy lift /
tilting arrangements, boom angle v/s lift,
Heavy Lifting
Operation
Crane collapse.
5 5 3 15 obstruction on the path of travel is physically 2 2 4 N/A Y
Lifting accessories Property Damage
verified & marked appropriately before executing
Not critically tested & Fatality
the lift.
certified. Ensure the cranes & lifting accessories are
thoroughly/ critically tested and approved.
Lifting points Provide PPE.s as leather hand gloves, safety
shoes & hard hat to the workers engaged.
Not assessed and Load
Ensure the operator is licensed, approved and
not balanced
qualified to use the particular cranes.
In the event of using special arrangements like
Trap in between of
tilting trolleys, jacking system ensures it is
body part during
designed for the purpose and physically tested.
loading.
Ensure the area of the heavy lifting operation is
well identified and barricaded to restrict the
``
`
20 / 26 Method Statement for Construction & Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. :
Construction & Installation of
ENGINEER : CONTRACTOR :
Precast and Cast in Situ Pits, Gullies
and Manholes
Overload (heavier Muscle sprains, and Load must be assessed before lifting, and check
loads than your lifting strains the path for tripping/slipping hazard in which the
capicity). Injuries to muscles, load would be carried.
ligaments, discs and Assess physical capacity of the persons involved
Slip of object.
other structures of the in lifting. Prefer mechanical aid if possible.
Sustained awkward back Manual handling technique need to apply
posture. Abdominal hernias Grip the load properly. Ensure synchronization
Material Handling (Manual)
``
`
21 / 26 Method Statement for Construction & Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. :
Construction & Installation of
ENGINEER : CONTRACTOR :
Precast and Cast in Situ Pits, Gullies
and Manholes
``
`
23 / 26 Method Statement for Construction & Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. :
Construction & Installation of
ENGINEER : CONTRACTOR :
Precast and Cast in Situ Pits, Gullies
and Manholes
``
`
24 / 26 Method Statement for Construction & Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. :
Construction & Installation of
ENGINEER : CONTRACTOR :
Precast and Cast in Situ Pits, Gullies
and Manholes
Waste Management
``
`
25 / 26 Method Statement for Construction & Installation of Precast and Cast in Situ Pits, Gullies and Manholes
Basra Multipurpose Terminal EEMMPPLLOOYYEERR::
Proj. No. :
Construction & Installation of
ENGINEER : CONTRACTOR :
Precast and Cast in Situ Pits, Gullies
and Manholes
Hierarchy of Control (Controls identified may be a mixture of the hierarchy in order to provide minimum operator exposure)
Elimination Eliminate the hazard.
Substitution Provide an alternative that is capable of performing the same task and is safer to use.
Engineering Controls Provide or construct a physical barrier or guard or technical measures
Administrative Controls Develop policies, procedures practices and guidelines, in consultation with employees, to mitigate the risk.
Provide training, instruction and supervision about the hazard.
Personal Protective Personal equipment designed to protect the individual from the hazard.
Equipment
``
`
26 / 26 Method Statement for Construction & Installation of Precast and Cast in Situ Pits, Gullies and Manholes