SIPP Water Main Rehabilitation Case Study: Daniel Beck and Silas Knight
SIPP Water Main Rehabilitation Case Study: Daniel Beck and Silas Knight
1
Overview
2
Results
• The 3,500-ft was rehabilitated in about a month
• Lower cost compared to open cutting (20%-30%)
• Minimized inconvenience on customers in use of the water main
• Minimized amount of construction needed compared to that of open cutting
• Extended pipe’s life by 50-75 years